United States › Tennessee › Davidson County › NASHVILLE
ArkonOne Construction NewsNashville permit filed for $5.1 million finish-out of Building C apartments at 1440 Luton St
| Estimated value | $5,135,324 |
|---|---|
| Project type | Major renovation |
| Location | NASHVILLE, Davidson County, Tennessee |
| Date reported | Nov 20, 2026 |
| Source | Nashville-Davidson permit records |
A major renovation permit with an estimated value of $5,135,324 has been reported for 1440 Luton St in Nashville, Davidson County, Tennessee. The record, sourced from Nashville-Davidson, carries a date of November 20, 2026. The permit concerns Building C, described as a 5-story mixed use building.
The project is classified as a major renovation. According to the description, Building C includes 1,042 square feet of retail space and 90 apartment units. The permit is aimed at the residential portion of the building, and the description indicates that the structure's foundation has already been built.
The permit description states that the work is intended to finish out and establish residential uses for the apartments in Building C. It adds that tenant finish permits are required to finish the retail spaces and to establish future commercial uses. That wording suggests the retail areas are expected to move forward under separate filings rather than under this permit alone. The description in the record is cut off, so further details of the scope are not available.
The record lists one permit. It is number 2026087997, its kind is major renovation, it is dated November 20, 2026, and its value is $5,135,324. The description also refers to an earlier permit, number 2026048870, under which the foundation was constructed. No other permits are listed, and the record gives no status for the permit.
A residential finish-out of this kind typically draws on a wide range of trades. For a building with 90 apartment units, work usually includes interior framing, drywall, insulation, electrical wiring and fixtures, plumbing, heating, ventilation and air conditioning, fire sprinkler and alarm systems, doors, flooring, cabinetry, countertops, painting and appliance installation. Because many units repeat similar layouts, suppliers of these materials often deliver in large, staged quantities. Projects of this type also commonly rely on equipment rental for lifts, scaffolding and temporary power, as well as on material hauling, hoisting and waste removal services. Elevator and life-safety contractors are also typical in multistory buildings, along with testing and inspection services.
Permit records are useful but limited. The estimated value and the work description reflect what the applicant declared when filing, and they may differ from final construction costs or from the work actually carried out. A permit entry does not show contracts, schedules or financing, and a single filing may represent only one part of a larger development.
For readers following the project, the next steps to watch are generally the filing of related permits, such as the tenant finish permits mentioned in the description, along with inspection activity and any updates to the permit record. Changes in declared value or scope, or additional filings tied to the same address, would offer further insight into how work at the building is progressing.
Want the contacts behind this project? Start your free ArkonOne trial.
Start free trialGet the news by email
A digest of new construction stories for the states you choose. We send a confirmation first; every email has an unsubscribe link.
Stories are automatically generated from public permit records. The figures are what the applicant declared on the permit. Browse the archive.