Seattle permit filed for $11.9 million mixed-use apartment building on Woodland Park Ave N

Nov 26, 2026 · ArkonOne Construction News · SEATTLE, King County, Washington
Estimated value$11,933,088
Project typeNew commercial construction
LocationSEATTLE, King County, Washington
Date reportedNov 16, 2026
SourceSeattle permit records

A building permit for a new mixed-use apartment building with below-grade parking has been reported for 3421 WOODLAND PARK AVE N in Seattle, King County, Washington. The permit record lists an estimated project value of $11,933,088 and carries a date of November 16, 2026.

The project is classified as new commercial construction. That category is commonly used for multifamily and mixed-use buildings, as opposed to single-family homes. The term mixed-use generally points to more than one use within a single building. In this record, the uses named are apartments and below-grade parking.

The work description in the permit reads: "Construct mixed-use apartment building with below-grade parking occupy per plan." The wording indicates construction of a new structure, with parking located below ground level, to be built and occupied according to the submitted plans. The summary does not list the number of floors, the number of apartments, or the square footage, so those details cannot be taken from this record.

One permit is on file for the project. It is numbered 6620777-CN and is categorized as new commercial construction. It is dated November 16, 2026, and shows a declared value of $11,933,088. The status is listed as Issued. The record comes from Seattle. It does not list any additional permits, such as separate trade, demolition, or street-use permits, though projects of this size often involve several of them over time.

A project of this type typically draws on a wide range of trades and suppliers. A below-grade parking level usually means excavation and shoring, followed by foundation and structural concrete work, so concrete suppliers, pump operators, rebar fabricators and formwork crews are commonly involved. Depending on the structural design, framing lumber, steel members, or both may be needed for the floors above. Scaffolding and equipment rental, including cranes, lifts and compactors, are common needs during the build. Once the structure is enclosed, a building like this typically requires electrical, plumbing and HVAC contractors, along with fire protection, elevator and insulation work. Roofing, window and exterior cladding suppliers, drywall and interior finish crews, flooring and cabinetry suppliers, and landscaping contractors usually follow. These are typical needs for this kind of building and do not describe any specific contracts on this project.

Permit records should be read with some care. The estimated value is the figure declared by the applicant at the time of filing. It is not a contract price, a final construction cost, or an appraisal. Final costs can differ as designs are refined, materials are purchased, and work proceeds. The status and dates reflect the record at the time it was reported and can change as the project moves forward.

For readers following projects like this one, the usual developments to watch include additional permit filings for specific trades, inspection activity, and the start of site work such as excavation. Updates to the permit record, including revisions to value or scope, can also offer a clearer picture of how the project is progressing. Public records from the city remain the most reliable place to confirm those changes as they appear.

Source: Source: City of Seattle, Building Permits (cos-data.seattle.gov).

Want the contacts behind this project? Start your free ArkonOne trial.

Start free trial

Arkon Leads in Seattle

Related stories

More: SEATTLE · King County · Washington · All states

Get the news by email

A digest of new construction stories for the states you choose. We send a confirmation first; every email has an unsubscribe link.

Choose states (1 selected)

Stories are automatically generated from public permit records. The figures are what the applicant declared on the permit. Browse the archive.