| COM - MULTI-FAMILY - BUILDING 3 - 5660 Lowell Building 3 | 5602 LOWELL BLVD |
Other | Jul 8, 2026 | 1 | Subscribers |
| COM - MULTI-FAMILY - BUILDING 2 - 5660 Lowell Development Building 2 | 5602 LOWELL BLVD |
Other | Jul 8, 2026 | 1 | Subscribers |
| COM - MULTI-FAMILY - BUILDING 1 - Part of the 5660 Lowell multifamily Project. Building 1 | 5602 LOWELL BLVD |
Other | Jul 8, 2026 | 1 | Subscribers |
| replace furnace: located in basement, and AC: located on right side of home Furnace: SS 80% eff/60k btu AC: 2.5 ton coil/14 seer condenser | 6716 E 123RD DR |
Mechanical | Jul 8, 2026 | 1 | Subscribers |
| Installation of a 14 MODULES - ROOF MOUNTED - 5.740 kW DC, 3.800 kW AC | 480 W 71ST AVE |
Roofing and exterior | Jul 8, 2026 | 1 | Subscribers |
| RES - FOUNDATION STABILIZATION - Residential Foundation Repair: Geolock x23 Powerbrace x18 | 9905 E 161ST PL |
Other | Jul 8, 2026 | 1 | Subscribers |
| REDRILL irrigation well, need electriall hooked up | 13200 HEADLIGHT RD |
Other | Jul 8, 2026 | 1 | Subscribers |
| 30x40 | 9508 E 147TH AVE |
Other | Jul 8, 2026 | 2 | Subscribers |
| RES - ELECTRICAL SERVICE CHANGE - Residential Electrical Replace Service Change - Up to 200 amps | 8540 FARADAY ST |
Electrical | Jul 8, 2026 | 3 | Subscribers |
| 200amp main electriical service updgrade | 8248 PECOS WAY |
Electrical | Jul 7, 2026 | 1 | Subscribers |
| replace furnace: located in closet on main floor, and AC: located in backyard Furnace: SS 96% eff/60k btu AC: 3 ton coil/14 seer condenser e | 7880 SHOSHONE ST |
Electrical | Jul 7, 2026 | 1 | Subscribers |
| RES - ADU - 842 sq fi detached garage with 865 sq ft. Accessory Dwelling Unit above | 1341 W 152ND AVE |
Other | Jul 7, 2026 | 1 | Subscribers |
| Re-Roof 27 Squares Asphalt Shingle 6/12 Pitch | 16501 TREE HAVEN ST |
Roofing and exterior | Jul 7, 2026 | 1 | Subscribers |
| Remove one layer of existing roofing material and install Atlas Storm Master Shake Shingles over single layer of synthetic underlayment, ice | 43201 E 88TH AVE |
Roofing and exterior | Jul 7, 2026 | 1 | Subscribers |
| 40g 40k water heater replacement | 8447 COOK WAY |
Plumbing | Jul 7, 2026 | 1 | Subscribers |
| RES - ELECTRICAL HOOKUP FOR WELL - Service Equipment - irrigation well drilled in 1943 was redrilled. a new electrical hookup is in place. n | 13200 HEADLIGHT RD |
Electrical | Jul 7, 2026 | 1 | Subscribers |
| Install replacement furnace 80% 90,000 BTU | 12033 MONACO ST |
Mechanical | Jul 7, 2026 | 1 | Subscribers |
| Install of 5.33kW solar panels on roof of dwelling and PUG | 1740 E 81ST PL |
Roofing and exterior | Jul 7, 2026 | 1 | Subscribers |
| panel upgrade | 1740 E 81ST PL |
Electrical | Jul 7, 2026 | 1 | Subscribers |
| RES - DEMO, MODULAR Demolition of mobile home and removal of all related debris to landfill and/or recycling center. | 6500 E 88TH AVE |
Demolition | Jul 7, 2026 | 2 | Subscribers |
| Replacement of 50 gallon, gas water heater | 841 CUCHARA ST |
Plumbing | Jul 6, 2026 | 1 | Subscribers |
| Remove/ Install 22 Sq's of shingles | 43401 E 96TH AVE |
Other | Jul 6, 2026 | 1 | Subscribers |
| RES - FENCE - 24 foot by 36 foot rectangular enclosure on the southwest part of the property, with a 20 foot right of way (distance from roa | 9930 E 160TH PL |
Other | Jul 6, 2026 | 1 | Subscribers |
| COM - ANTENNA STATION INSTALL - Installing Satellite Earth Station Antennas | 49815 E 120TH AVE |
Other | Jul 6, 2026 | 1 | Subscribers |
| COM - GATE - Installation of a new structural driveway entrance gate located approximately 50 feet south of E. 152nd Avenue. The scope of wo | 26300 E 152ND AVE |
New commercial construction | Jul 6, 2026 | 1 | Subscribers |
| RES - POLE BARN - pole barn | 14930 COLORADO BLVD |
Other | Jul 6, 2026 | 1 | Subscribers |
| NEW SYSTEM SIZE: 2.15KWDC, 1.75KWAC · 5 Q.CELL Q.TRON BLK M-G2+/AC MODULES · 5 Q.CELL Q.MI.349B-G1 INVERTER | 8610 PRATT PL |
Other | Jul 6, 2026 | 1 | Subscribers |
| Replace (2) Systems, (2) Heat Pumps, and (2) Furnaces | 14120 COUNTRY HILLS DR |
Mechanical | Jul 6, 2026 | 1 | Subscribers |
| 3 ton electric heat pump installation replacing an existing gas furnace. The gas line will be capped at the removed furnace location. Need t | 2280 MABLE AVE |
Electrical | Jul 6, 2026 | 2 | Subscribers |
| 2 ton electric heat pump installation replacing an existing gas furnace. The gas line will be capped at the removed furnace location. Need t | 7809 GREENLEAF LN |
Electrical | Jul 6, 2026 | 2 | Subscribers |