| Tear shingles off to decking install Ice and water shield at the eaves and #15 Synthetic felt in the field, install 2x4 drip edge at the eav | 7855 NEWPORT ST |
Other | Jun 27, 2026 | 1 | Subscribers |
| 65-Gallon Heat Pump replacement | 14500 LARK BUNTING LN |
Other | Jun 26, 2026 | 1 | Subscribers |
| Tear off and replace with Landmark Climateflex cobblestone gray 20 sqs, 2/12 & 4/12 | 2110 E 83RD PL |
Other | Jun 26, 2026 | 1 | Subscribers |
| On north facing wall only, siding to be replaced. . Remove existing sheathing, add new 7/16 OSB sheathing. Add vapor barrier. replace one wi | 7490 LOCUST ST |
Roofing and exterior | Jun 26, 2026 | 1 | Subscribers |
| RES - TOWNHOME - 6 PLEX RESIDENTIAL TOWNHOME - 6 PLEX - NEW CONSTRUCTION - VB IRC - R2 BUILDING 11 - LOTS 58 - FARMHOUSE ELEVATION | 5537 Decatur Court |
Other | Jun 26, 2026 | 1 | Subscribers |
| COM - RE-ROOF - Remove 20 sq od asphalt shingle replace with IKO | 3365 W 65Th AVE |
Roofing and exterior | Jun 26, 2026 | 1 | Subscribers |
| COM - RE-ROOF - Remove and replace Asphalt shingles 37.84 Building 1 Replace with IKO | 3365 W 65Th AVE |
Roofing and exterior | Jun 26, 2026 | 1 | Subscribers |
| Replace furnace 96% 60K BTU Replace AC w/ Heat Pump 2 ton | 2080 E 84TH AVE |
Mechanical | Jun 26, 2026 | 1 | Subscribers |
| RESIDENTIAL TOWNHOME - 6 PLEX - NEW CONSTRUCTION - VB IRC - R2 BUILDING 11 - LOTS 57 - FARMHOUSE ELEVATION | 5543 Decatur Court |
Other | Jun 26, 2026 | 1 | Subscribers |
| Tear off and reroof both house and detached garage with IKO asphalt shingles | 2915 QUARTERLAND ST |
Roofing and exterior | Jun 26, 2026 | 1 | Subscribers |
| RES - WHEEL CHAIR RAMP - i need to build a wheelchair ramp in front of my house for my wife due that she is going to get surgery and she hav | 7751 SHOSHONE ST |
Other | Jun 26, 2026 | 1 | Subscribers |
| COM - Cell Tower Modifications - New equipment corral on existing water tower. (9) new Verizon Wireless antennas and remote radio equipment | 56829 COLORADO AVE |
Other | Jun 26, 2026 | 1 | Subscribers |
| Installation of Doublewide mobile home in a MH Park | 6500 E 88TH AVE |
Other | Jun 26, 2026 | 1 | Subscribers |
| Installation of a Mobile home in A Mobile home Park - | 6250 FEDERAL BLVD |
Other | Jun 26, 2026 | 1 | Subscribers |
| Installation of a flush mount, grid-tied, 9.135 kW solar PV system. | 5641 ZUNI CT |
Other | Jun 26, 2026 | 2 | Subscribers |
| Replace detached garage roof with IKO Cambridge Class 3 Shingles | 30800 E 146TH AVE |
Roofing and exterior | Jun 25, 2026 | 1 | Subscribers |
| Replacing siding with James Hardie Fiber Cement. 1.86 SQ. | 7951 ROSLYN ST |
Roofing and exterior | Jun 25, 2026 | 1 | Subscribers |
| WRONG PERMIT TYPE - COMMUNICATION SENT - The existing 6-inch fire hydrant line has been damaged. We will perform a spot repair on the damage | 5201 FOX ST |
Other | Jun 25, 2026 | 1 | Subscribers |
| RES - BASEMENT FINISH - Basement remodel- adding 1 bedroom, 1 bathroom, bedroom closet and linen closet | 10305 E 146TH PL |
Major renovation | Jun 25, 2026 | 1 | Subscribers |
| Install a three-sided 10'W x 10'D trash enclosure with one (1) 10'W x 6'H dual swing gate and two (2) bollards 6'H trash enclosure with stee | 8300 WASHINGTON ST |
Other | Jun 25, 2026 | 1 | Subscribers |
| RES - Reroof | 8655 PRATT PL |
Roofing and exterior | Jun 25, 2026 | 1 | Subscribers |
| Remove and replace asphalt shingle roof | 2230 CLEO ST |
Roofing and exterior | Jun 25, 2026 | 1 | Subscribers |
| RES - ADDITION - Add Small addition off back of house to enlarge existing bedroom. Expand into existing garage to enlarge Master Closet. | 6103 E 161ST AVE |
Major renovation | Jun 25, 2026 | 1 | Subscribers |
| 3 TON ELECTRIC HEAT PUMP INSTALLATION REPLACING AN EXISTING GAS FURNACE. THE GAS LINE WILL BE CAPPED AT THE REMOVED FURNACE LOCATION. NEED T | 8961 OAKWOOD ST |
Electrical | Jun 25, 2026 | 2 | Subscribers |
| Replace existing heating and cooling system with heat pump and gas furnace | 33955 E 25TH AVE |
Plumbing | Jun 24, 2026 | 2 | Subscribers |
| Homeowner is changing their roof from comp shingle to Decra Tile. We are changing the racking type only and removing and reinstalling the sy | 13965 FLORENCE CT |
Roofing and exterior | Jun 24, 2026 | 1 | Subscribers |
| Install 19 seer heat pump and coil | 28320 E 163RD PL |
Other | Jun 24, 2026 | 1 | Subscribers |
| Installation of 1" iron gas line from gas meter exposed on house to back corner then transition to underground gas line and run 17' to fire | 9990 E 148TH PL |
Plumbing | Jun 24, 2026 | 1 | Subscribers |
| Lennox Elite Heat Pump System System Size: 20.6K BTU @ 5F w/ 23.8K (Max) Cooling - 66K 2-Stage Gas Furnace System Components: (1) Lennox Eli | 5353 MEADE ST |
Plumbing | Jun 24, 2026 | 2 | Subscribers |
| RES - PLUMBING SEWER LINE REPAIR - INTERIOR - Break in the sewer line - we are doing an interior main line repair up to 10' | 8206 WASHINGTON ST |
Plumbing | Jun 24, 2026 | 1 | Subscribers |