| Tear off and re-roof 50 squares with GAF ASII | 35880 E 149TH CT |
Roofing and exterior | Oct 12, 2026 | 2 | Subscribers |
| Replacing main sewer line interior as part of full line replacement | 2220 W 56TH PL |
Plumbing | Oct 12, 2026 | 2 | Subscribers |
| RES - FENCE - New 6 foot high privacy cedar fence. Fence will start at the edge of the existing concrete pad going east 52 feet. The fence i | 14328 E 134TH PL |
Other | Oct 11, 2026 | 1 | Subscribers |
| remove and replace existing roof. New roof will be dimensional shingles. Roof slope is 4:12. The roof is 18 squares | 7696 GREENWOOD BLVD |
Roofing and exterior | Oct 11, 2026 | 2 | Subscribers |
| replace existing natural gas furnace with a new natural gas furnace. The new natural gas furnace will be a 70K BTU, 96% efficient. | 7696 GREENWOOD BLVD |
Plumbing | Oct 11, 2026 | 1 | Subscribers |
| Remove and replace | 6240 TENNYSON ST |
Other | Oct 10, 2026 | 1 | Subscribers |
| change the new wood siding. | 1963 BURTON ST |
Roofing and exterior | Oct 9, 2026 | 1 | Subscribers |
| Roof is being repaired, this permit is to reconnect solar system after it's been removed and re-installed | 44000 E 88TH AVE |
Electrical | Oct 9, 2026 | 1 | Subscribers |
| RES - TALL DETACHED CARPORT - Project Description / Scope of Work Construction of a 12' x 24' x 15' tall single-car custom wood-framed detac | 5421 RARITAN WAY |
Roofing and exterior | Oct 9, 2026 | 1 | Subscribers |
| Re-sheet roof deck area, install Polyglass base sheet, roof with Polyglass cap sheet. | 5400 SHERIDAN BLVD |
Roofing and exterior | Oct 9, 2026 | 1 | Subscribers |
| COM - SERVICE CHANGE - ADDING 125 AMP 280V 3 PHASE ADTA AND 30 AMP 3 PHASE 480V Y DROP | 875 W 64TH AVE |
Other | Oct 9, 2026 | 1 | Subscribers |
| Remove and replace Asphalt Shingles Gaf Timberline - Shakewood | 1061 E 85TH PL |
Other | Oct 9, 2026 | 1 | Subscribers |
| Semp Detached Garage Re-roof. OC Duration Driftwood | 5889 E 163RD AVE |
Roofing and exterior | Oct 9, 2026 | 1 | Subscribers |
| SINGLE FAMILY DWELLING - new single family home 2x458 sq ft main label with full finish basemen and 4-car garage attached | 30400 E 162ND AVE |
Other | Oct 9, 2026 | 1 | Subscribers |
| RES - GARAGE - DETACHED - Detached 2-Car Garage with total floor area of 907 sq.ft. with 261 finished floor for a studio space and 646 sq.ft | 2360 W 56TH AVE |
Other | Oct 9, 2026 | 1 | Subscribers |
| SINGLE FAMILY DWELLING - New Single Family Dwelling with Detached Garage and ADU in the basement level. Total finished floor area: 4,899 sq. | 2360 W 56TH AVE |
Other | Oct 9, 2026 | 1 | Subscribers |
| RES - RE-ROOF - Complete re-roof. Tear off existing shingles down to deck and install OC Duration Flex. 43.78 SQ. 1 story. 8/12 pitch. | 31335 E 162ND AVE |
Roofing and exterior | Oct 9, 2026 | 2 | Subscribers |
| RES - MOBILE HOME REPLACEMENT We will be demoing a mobile home from a fire, and replacing it with a new one. | 5400 SHERIDAN BLVD |
Other | Oct 9, 2026 | 2 | Subscribers |
| 200A Service upgrade | 7170 ALAN DR |
Other | Oct 8, 2026 | 1 | Subscribers |
| RES - EGRESS WINDOWS - 2x egress windows vertical cuts only - no horizonal cuts. per engineering detail | 9101 GROVE ST |
Roofing and exterior | Oct 8, 2026 | 1 | Subscribers |
| RES - DECK AND ATTACHED PATIO COVER - Demolition and removal of existing rear deck and construction of a new 896 SF (64' x 14') deck with an | 2250 W 152ND PL |
Demolition | Oct 8, 2026 | 1 | Subscribers |
| RES - VERSA TUBE (CARPORT) - TO STORE HAY - We are planning to purchase a VersaTube carport, building that will be 3-sided carport to store | 15542 GADSDEN DR |
Other | Oct 8, 2026 | 1 | Subscribers |
| swapping like for like 75 gallon/70k btu high recovery natural gas water heater | 14870 MARIPOSA CT |
Plumbing | Oct 8, 2026 | 2 | Subscribers |
| DIY water heater replacement in our home | 4420 WAGNER DR |
Plumbing | Oct 7, 2026 | 1 | Subscribers |
| Tear of existing Roof-re roof with dimensional shingles | 2161 DOPPLER ST |
Roofing and exterior | Oct 7, 2026 | 1 | Subscribers |
| Service change 200 amp underground service | 12065 IVANHOE CT |
Electrical | Oct 7, 2026 | 1 | Subscribers |
| RES - REMODEL ADU - Remodel of an ADU. The remodel will include some interior wall changes including some structural walls adding doors. The | 3550 E 160TH AVE |
Electrical | Oct 7, 2026 | 1 | Subscribers |
| take off old asphalt shingle roof and replace with new asphalt shingles | 8784 PRINCETON ST |
Roofing and exterior | Oct 7, 2026 | 1 | Subscribers |
| COM - EMERGENCY - BOILER Xcel Energy red-tagged the gas meter due to a reported gas leak located in the boiler room. Contractor is performin | 1990 W 76TH AVE |
Mechanical | Oct 7, 2026 | 1 | Subscribers |
| Remove/ Install 17 SQ's of shingles | 3058 ROSE HILL ST |
Other | Oct 7, 2026 | 1 | Subscribers |