| COM - XCEL - NATURAL GAS REGULATOR STATION REPLACEMENT - Project Scope: The property is currently utilized for 2 natural gas regulator stati | 4279 E 88TH AVE |
Plumbing | Jun 18, 2026 | 4 | Subscribers |
| INSTALLATION OF ROOFTOP MOUNTED PHOTOVOLTAIC SOLAR SYSTEM | 16010 PONTIAC CT |
Roofing and exterior | Jun 18, 2026 | 2 | Subscribers |
| Tear off 18.76 SQ of asphalt shingle. Replace with Owens Corning Duration Storm -Driftwood | 56305 E 33RD CT |
Other | Jun 17, 2026 | 1 | Subscribers |
| Tear off all layers of shingle. Synthetic felt. Ice and Water on all roof transition. Ridge vent upgrade. *No upcharge. Reroof one layer of | 55377 E 41ST AVE |
Roofing and exterior | Jun 17, 2026 | 1 | Subscribers |
| RES - DECK w/ PERGOLA - approx 510sqft deck pergola 300 sqft solid roof 350 | 9830 E 150TH AVE |
Roofing and exterior | Jun 17, 2026 | 1 | Subscribers |
| RES - EV CHARGER - Private residential EV charger tied into existing MSP on dedicated 60A-2p breaker. #6 CU conductors, #10 CU ground, and 3 | 2450 W 55TH AVE |
Mechanical | Jun 17, 2026 | 1 | Subscribers |
| panel upgrade 150 amp overhad feed | 5365 NEWTON ST |
Electrical | Jun 17, 2026 | 1 | Subscribers |
| Re Roof | 7510 MONACO ST |
Roofing and exterior | Jun 17, 2026 | 1 | Subscribers |
| RES - ADDITION - We are adding a new kitchen, mudroom and living room with a step down addition 26’ x32’ | 8411 COUNTER DR |
Major renovation | Jun 17, 2026 | 1 | Subscribers |
| 1. 30A 240v Water Heater circuit (25ft) 2. 35A 240v Heat Pump circuit (25) 3. Converted Furnace circuit to GFI 4. 20A 120v Heat Pump GFI | 6450 TENNYSON ST |
Plumbing | Jun 16, 2026 | 1 | Subscribers |
| 80% AFUE 100K BTU furnace replacement | 10625 E 157TH CT |
Mechanical | Jun 16, 2026 | 1 | Subscribers |
| Installing new 1T ductless mini split condenser w/ 12k btu high wall head | 6673 FERN DR |
Mechanical | Jun 16, 2026 | 1 | Subscribers |
| Re-roofing 23 squares shingles on main dwelling. | 13141 CONVERSE RD |
Roofing and exterior | Jun 16, 2026 | 1 | Subscribers |
| tear off and reroof shingles 19 squares | 12117 MONACO DR |
Roofing and exterior | Jun 16, 2026 | 1 | Subscribers |
| RES - FENCE - 220 linear ft of 6' high horizontal cedar wood fence w/ 10' wide double swing gate and 1 single gate. Fencing will not extend | 6440 STUART ST |
Other | Jun 16, 2026 | 1 | Subscribers |
| Replacing siding with James Hardie Fiber Cement. 7.91 SQ. | 5551 SHOSHONE ST |
Roofing and exterior | Jun 16, 2026 | 1 | Subscribers |
| COM - AC AND FURNACE - Installation of a Daikin 4MXT36AVJU9 w/ FTXV24AVJU9 & FTXV12AVJU9 | 37450 ASTRA WAY |
Mechanical | Jun 16, 2026 | 1 | Subscribers |
| RES - SEWER LINE IN BASEMENT - REPAIR - Repairing the interior sewer line in basement bedroom. | 6575 IRVING ST |
Plumbing | Jun 16, 2026 | 1 | Subscribers |
| COM - NON-ILLUMINATED SIGN - sign | 9755 HENDERSON RD |
Other | Jun 16, 2026 | 1 | Subscribers |
| 96% 2 stage 120,000 BTU furnace 3.5 ton 14 SEER AC | 4121 W 66TH AVE |
Mechanical | Jun 16, 2026 | 2 | Subscribers |
| RES - ADU - DETACHED - We will be build a new detached 500 square foot ADU in Adams county. | 2310 FERN DR |
Other | Jun 16, 2026 | 2 | Subscribers |
| Excavate in back yard at 7' deep to retrieve a stuck drain cleaning cable and install 2 way risers | 3291 W 54TH AVE |
Other | Jun 15, 2026 | 1 | Subscribers |
| remove old roof and install new roof | 6638 E 123RD DR |
Roofing and exterior | Jun 15, 2026 | 1 | Subscribers |
| 90% 80K BTU FURNACE, 17 SEER 3 TON AC REPLACEMENT -LIKR FOR LIKR - DISCONNECT AND RECONNECT AC | 10790 E 163rd CT |
Mechanical | Jun 15, 2026 | 1 | Subscribers |
| RES - BARBED WIRED T-POST FENCE | 8551 FLINT RIDGE ST |
Other | Jun 15, 2026 | 1 | Subscribers |
| 50 ft dedicated circuit for EV | 9569 E 147TH AVE |
Electrical | Jun 15, 2026 | 1 | Subscribers |
| installing 100,000 btu furnace 80% eff and installing 5 ton 18 seer a/c unit installing like for like | 16441 TREE HAVEN ST |
Mechanical | Jun 15, 2026 | 1 | Subscribers |
| Tear off all layers of old damaged shingle- Ice and water on all eaves and valleys. Synthetic felt, new vents and pipe jacks. One new layer | 1820 HOPKINS DR |
Other | Jun 15, 2026 | 1 | Subscribers |
| COM - DEMO BUILDING - Demo of commercial building 6400 sq foot at 800 west 84th Ave | 800 W 84TH AVE |
Demolition | Jun 15, 2026 | 1 | Subscribers |
| RES - Basement Finish - ! family room, 1 bedroom, 1 bathroom | 16641 LEYDEN ST |
Other | Jun 15, 2026 | 1 | Subscribers |