| upgrade existing service to 200 amp for single family detached dwelling | 3694 CHASE CT, BOULDER |
Electrical | May 6, 2026 | 1 | Under $250,000 |
| potholing for Xcel Energy SUE WO #115410107 **potholing only** **contractor must notify impacted residents 72 hrs in advance; no-parks must | 2408 8TH ST, BOULDER |
Other | May 6, 2026 | 1 | Under $250,000 |
| WO 115778142 - Traffic control for 2 pole change outs for Xcel **contractor must notify and coordinate with Boulder Municipal Airport prior | 3327 AIRPORT RD, BOULDER |
Other | May 6, 2026 | 1 | Under $250,000 |
| Emergency Replacement of Furnace **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fue | 415 S 45TH ST, BOULDER |
Mechanical | May 6, 2026 | 1 | Under $250,000 |
| Installation of AES radio to existing Fire Alarm System | 1527 CHERRYVALE RD, BOULDER |
Other | May 6, 2026 | 1 | Under $250,000 |
| Comcast proposes to tie in to existing splice location along Glenwood (near 3200 Arnett) **contractor must notify impacted residents 72 hrs | 3325 28TH ST, BOULDER |
Other | May 6, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 31 squares of dimensional shingles on a pitch represented as | 4564 S HAMPTON CIR, BOULDER |
Roofing and exterior | May 6, 2026 | 1 | Under $250,000 |
| Installtion and relocation of six (6) notification devices for a Tenant Improvement project | 1750 29TH ST 1042, BOULDER |
Major renovation | May 6, 2026 | 1 | Under $250,000 |
| 2111 Arapahoe development site wet utilities installations | Utility sub-permit UTL2025-00329 : upsize (1) domestic service from 3/4" to 1", | 2111 ARAPAHOE AVE, BOULDER |
Other | May 6, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 25 squares of dimensional shingles on a pitch represented as | 2658 MAPLETON AVE, BOULDER |
Roofing and exterior | May 6, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof office building, 28 squares of dimensional shingles on a pitch repre | 3575 BROADWAY, BOULDER |
Roofing and exterior | May 6, 2026 | 1 | Under $250,000 |
| ESS installation; 11.5kw AC NEW: BATTERY QUANTITY: (1) Tesla Powerwall 3 - (1) Tesla Backup Switch | 2670 STEPHENS RD, BOULDER |
Electrical | May 6, 2026 | 2 | Under $250,000 |
| Install 40 gallon electric water heater **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents | 355 32ND ST, BOULDER |
Mechanical | May 6, 2026 | 2 | Under $250,000 |
| Repair damaged drywall and replace bathroom fixtures and new flooring damaged from interior plumbing leak | 1070 HARTFORD DR, BOULDER |
Plumbing | May 6, 2026 | 2 | Under $250,000 |
| Remove existing Furnace and AC with like for like: both furnaces 95% AFUE 60,000 BTU AC 1 2.5 TON 14 SEER (13.4 SEER2) AC 2 2 TON 14 SEER (1 | 5055 RALSTON ST A, BOULDER |
Mechanical | May 6, 2026 | 2 | Under $250,000 |
| **Voided for inactivity - no inspection within 180 days** Replace 2 like for like electric heaters. | 3555 ARAPAHOE AVE, BOULDER |
Mechanical | May 6, 2026 | 2 | Under $250,000 |
| WO 115203677 | traffic control and occupancy for transformer replacement | 1414 OAKLEAF CIR, BOULDER |
Other | May 6, 2026 | 2 | Under $250,000 |
| **Voided for inactivity - no inspection within 180 days** Repairs to master bathroom, kitchen and lower floor due to a water leak. Removal/r | 2118 PEARL ST B, BOULDER |
Other | May 6, 2026 | 2 | Under $250,000 |
| Interior kitchen remodel of single family dwelling - includes electrical, mechanical and plumbing - scope includes relocating appliances, in | 790 MOHAWK DR, BOULDER |
Other | May 5, 2026 | 1 | Under $250,000 |
| Adding 1 card reader to the existing system. | 3101 SPRUCE ST, BOULDER |
Other | May 5, 2026 | 1 | Under $250,000 |
| East & Co monument sign. | 2100 CENTRAL AVE, BOULDER |
Other | May 5, 2026 | 1 | Under $250,000 |
| Convert an existing attached 215 SF Garage to Conditioned Living Space, including a bedroom and bathroom. Include additional covered front p | 3161 7TH ST, BOULDER |
Major renovation | May 5, 2026 | 1 | Under $250,000 |
| Construction of a new ADU + Detached Garage Structure on an existing single family detached lot. The proposed ADU is 900 SF and will mostly | 3161 7TH ST, BOULDER |
Other | May 5, 2026 | 1 | $250,000 to $1 million |
| Convert an existing attached 215 SF Garage to Conditioned Living Space, including a bedroom and bathroom. Include additional covered front p | 3161 7TH ST, BOULDER |
Major renovation | May 5, 2026 | 1 | Subscribers |
| Replacing 4 windows, no change to size or location. | 5619 TABLE TOP CT, BOULDER |
Other | May 5, 2026 | 1 | Under $250,000 |
| 8? sewer repair in the front lot. Installing clean outs. **contractor must notify impacted residents prior to starting work** | 4700 PEARL ST, BOULDER |
Plumbing | May 5, 2026 | 1 | Subscribers |
| Furnace: SS 80% eff/60k btu AC: 2.5 ton coil/14 seer condenser **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All n | 949 QUINCE AVE, BOULDER |
Mechanical | May 5, 2026 | 1 | Under $250,000 |
| Replacing 1 door with no change to the structure. | 1460 OAK CIR, BOULDER |
Other | May 5, 2026 | 1 | Under $250,000 |
| Dumpster needed for remodeling project. Dumpster to be located in the street in front of the house at 2220 Howard Pl. Dumpster no larger tha | 2220 HOWARD PL, BOULDER |
Major renovation | May 5, 2026 | 1 | Under $250,000 |
| Install a new ductless mini-split for single family detached dwelling. Electrical work is adding a new AC disconnect. No change to existing | 1005 TANTRA PARK CIR, BOULDER |
Mechanical | May 5, 2026 | 1 | Under $250,000 |