| Zayo will be boring 54ft on the Northside of Arapahoe and 55th and then boring 135ft off Cherryvale and Arapahoe. Fiber will be pulled along | 5501 ARAPAHOE AVE, BOULDER |
Roofing and exterior | Apr 21, 2026 | 1 | Under $250,000 |
| like for like replacement water heater. 50 gallon double vent, 100,000 btus, natural gas **Any electrical work required beyond a like-for-li | 910 28TH ST 213, BOULDER |
Mechanical | Apr 21, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of DETACHED GARAGE, 8 squares of dimensional shingles on a pitch rep | 829 GRANT PL, BOULDER |
Roofing and exterior | Apr 21, 2026 | 1 | Under $250,000 |
| Install (7) wall anchors on the rear (south) basement foundation wall to help mitigate future lateral movement of that area. Work Area: wall | 1270 AIKINS WAY, BOULDER |
Other | Apr 21, 2026 | 2 | Under $250,000 |
| a. Interior remodel in existing single family residence at 836 9th Ave. No new square footage. b. Level II Alteration: Area of remodel = 45. | 836 9TH ST, BOULDER |
Major renovation | Apr 20, 2026 | 1 | $250,000 to $1 million |
| Channel Letters Front lit and back lit on White Aluminum backer Install on Raceway *ENF2026-00073* | 2900 BASELINE RD 3, BOULDER |
Other | Apr 20, 2026 | 1 | Under $250,000 |
| Enlargement of existing window openings in the foundation wall for the lower level unit of a non-conforming duplex to install 3 new egress w | 1308 GRANDVIEW AVE, BOULDER |
Other | Apr 20, 2026 | 1 | Under $250,000 |
| Replacement of three RTU's. RTU 1, 2 and 4 units are like for like. Units sit behind parapet wall and can't be seen from street. Kelly Elect | 2100 28TH ST 1A, BOULDER |
Mechanical | Apr 20, 2026 | 1 | Under $250,000 |
| 40 GAL ELECTRIC WATER HEATER REPLACEMENT - LIKE FOR LIKE **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new pla | 1021 BEREA DR, BOULDER |
Mechanical | Apr 20, 2026 | 1 | Under $250,000 |
| Gas service renewal (1) 5x5 street cut (3) potholes (1) 86' bore **contractor must notify impacted businesses 72 hrs in advance** **contract | 1844 PEARL ST, BOULDER |
Plumbing | Apr 20, 2026 | 1 | Under $250,000 |
| replace old gas water heater with new gas water heater. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plas | 3168 6TH ST, BOULDER |
Mechanical | Apr 20, 2026 | 1 | Under $250,000 |
| Installing a 2.5 ton ducted Mitsubishi heat pump **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glu | 310 28TH ST, BOULDER |
Mechanical | Apr 20, 2026 | 1 | Under $250,000 |
| VOID-180 Days no activity event date past The 2026 1940s Ball--a historical, community celebration of the 1940s swing era. This will be held | 3393 AIRPORT RD, BOULDER |
Other | Apr 20, 2026 | 1 | Subscribers |
| in-property wastewater service repair | 375 S 40TH ST, BOULDER |
Other | Apr 20, 2026 | 1 | Subscribers |
| **VOID- Inspections not completed within 180 days** Installation of one (1) temporary banner sign for Tutu School at 607 S Broadway, Unit E, | 607 S BROADWAY, BOULDER |
Major renovation | Apr 20, 2026 | 1 | Under $250,000 |
| upsize from 3/4" domestic water service to a 1" combination domestic/fire service & 1" meter | utility sub-permit UTL2026-00002 **sidewalk c | 520 PEARL ST, BOULDER |
Other | Apr 20, 2026 | 1 | Under $250,000 |
| THIS PROJECT IS A RENOVATION OF AN EXISTING TENANT IN-LINE SPACE AT AN OPEN AIR MALL. PROJECT AREA IS 3,678 SF AT THE GROUND FLOOR. EXISTING | 1805 29TH ST 1124, BOULDER |
Major renovation | Apr 20, 2026 | 1 | $250,000 to $1 million |
| This apartment (#2) is located above The Sink restaurant and suffered a small kitchen fire. Reconstruction includes framing new 13' x 9' woo | 1226 PENNSYLVANIA AVE, BOULDER |
Electrical | Apr 20, 2026 | 2 | Under $250,000 |
| NEW CONSTRUCTION OF SINGLE-FAMILY DETACHED DWELLING W/ ATTACHED GARAGE | 2170 HERMOSA DR, BOULDER |
New commercial construction | Apr 17, 2026 | 1 | $5 to $25 million |
| **Revision 6/22/26 to add new electrical circuits for heat pump and floor. Heat circuits in bathrooms and associated framing** Scope of work | 1989 19TH ST, BOULDER |
Major renovation | Apr 17, 2026 | 1 | Under $250,000 |
| INTERIOR ALTERATIONS (847 SF) AND ASSOCIATED MEP TO AN EXISTING SINGLE-FAMILY DETACHED RESIDENCE. | 2065 VASSAR DR, BOULDER |
Major renovation | Apr 17, 2026 | 1 | $250,000 to $1 million |
| **180-day one-time extension request granted. Project must be completed by 3/24/2027.** Solar and ESS installation SYSTEM SIZE: 3.96KWDC, 11 | 1649 JIMSON CT, BOULDER |
Electrical | Apr 17, 2026 | 1 | Under $250,000 |
| INSTALLATION OF ROOF-MOUNTED UTILITY INTERACTIVE PV SYSTEM 14.96 KW DC & 10.88 KW AC PV MODULES - 34 HYUNDAI ENERGY HIN-T440NF(BK) INVERTER( | 830 MCINTIRE ST, BOULDER |
Electrical | Apr 17, 2026 | 1 | Under $250,000 |
| *5/15/26 Revision to type of attachment* Roof mounted PV Solar with ESS | 2505 UNIVERSITY HEIGHTS AVE, BOULDER |
Electrical | Apr 17, 2026 | 1 | Under $250,000 |
| Installation of a flush mount, grid-tied, 10.005 kW solar PV system. *BLD-SFD2025-00133 | 1040 LOCUST AVE, BOULDER |
Electrical | Apr 17, 2026 | 1 | Under $250,000 |
| Roof Mount PV System with Energy Storage | 127 MINEOLA CT, BOULDER |
Electrical | Apr 17, 2026 | 1 | Under $250,000 |
| Residential installation of Powerwall3+ & Expansion Unit batteries from Tesla. | 960 TOEDTLI DR, BOULDER |
Electrical | Apr 17, 2026 | 1 | Under $250,000 |
| TI Remodel Fire Sprinkler | 1685 38TH ST, BOULDER |
Major renovation | Apr 17, 2026 | 1 | Under $250,000 |
| ESS battery. Installation of one Tesla Powerwall 3 battery, retrofit to an existing PV solar system. Including install of new subpanel (125A | 4370 DREW CIR, BOULDER |
Electrical | Apr 17, 2026 | 1 | Under $250,000 |
| Replace existing Fan coil unit & A/C with new. A/C: 2 ton, 14 SEER **Any electrical work required beyond a like-for-like replacement of equi | 3601 ARAPAHOE AVE 423, BOULDER |
Mechanical | Apr 17, 2026 | 1 | Under $250,000 |