| Sewer service replacement from the house to the street in the front of the address. **contractor must notify impacted residents 72 hrs in ad | 819 ITHACA DR, BOULDER |
Plumbing | Apr 7, 2026 | 1 | Under $250,000 |
| Installing a ducted 2 ton Mr. Cool heat pump **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued v | 4320 MONROE DR, BOULDER |
Mechanical | Apr 7, 2026 | 2 | Under $250,000 |
| replace 40 gallon water heater like for like **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued v | 440 S 41ST ST, BOULDER |
Mechanical | Apr 7, 2026 | 2 | Under $250,000 |
| Boiler replacement **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burning appl | 3010 15TH ST, BOULDER |
Mechanical | Apr 7, 2026 | 2 | Under $250,000 |
| Rehabilitation and renovation of an existing 70-unit affordable housing development to address recommended repairs and reduce ongoing mainte | 5640 ARAPAHOE AVE, BOULDER |
Major renovation | Apr 6, 2026 | 1 | $250,000 to $1 million |
| Rehabilitation and renovation of an existing 70-unit affordable housing development to address recommended repairs and reduce ongoing mainte | 5630 ARAPAHOE AVE, BOULDER |
Major renovation | Apr 6, 2026 | 1 | $250,000 to $1 million |
| Rehabilitation and renovation of an existing 70-unit affordable housing development to address recommended repairs and reduce ongoing mainte | 5620 ARAPAHOE AVE, BOULDER |
Major renovation | Apr 6, 2026 | 1 | $250,000 to $1 million |
| Rehabilitation and renovation of an existing 70-unit affordable housing development to address recommended repairs and reduce ongoing mainte | 5610 ARAPAHOE AVE, BOULDER |
Major renovation | Apr 6, 2026 | 1 | $250,000 to $1 million |
| Kitchen remodel scope will include the replacement of 89 square feet of tile flooring, 13.5 linear feet of cabinets, 60 square feet of count | 1590 QUINCE AVE, BOULDER |
Major renovation | Apr 6, 2026 | 1 | Under $250,000 |
| ALTERATION LEVEL 2: REMODEL OF THE EXISTING UPPER LEVEL HALL BATH AND PRIMARY SUITE (BEDROOM, CLOSET, AND BATHROOM) - 195 SF. WINDOW REPLACE | 432 PINE ST, BOULDER |
Major renovation | Apr 6, 2026 | 1 | $250,000 to $1 million |
| Remodel existing master closet to create a new powder room and add an additional closet in the master bedroom | 1440 MOSS ROCK PL, BOULDER |
Other | Apr 6, 2026 | 1 | Under $250,000 |
| Non Illuminated, Stud Mounted FCO's. Noble Property Management | 2527 1/2 BROADWAY, BOULDER |
Other | Apr 6, 2026 | 1 | Under $250,000 |
| Deconstruction of detached garage off the alley | 2237 PINE ST, BOULDER |
Demolition | Apr 6, 2026 | 1 | Subscribers |
| **VOID- Inspections not completed within 180 days** wall sign installation | 921 WALNUT ST, BOULDER |
Other | Apr 6, 2026 | 1 | Under $250,000 |
| **Voided for inactivity - no inspection within 180 days** like for like water heater **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BUR | 3701 ARAPAHOE AVE 417, BOULDER |
Mechanical | Apr 6, 2026 | 1 | Under $250,000 |
| Replace existing furnace with new of like. | 4500 19TH ST 623, BOULDER |
Mechanical | Apr 6, 2026 | 1 | Under $250,000 |
| Replace 2 ducted swamp coolers with 2 ducted mini-split systems. Add return and new electrical. Add 1 mini-split system with wall head for k | 285 ABBEY PL, BOULDER |
Mechanical | Apr 6, 2026 | 1 | Under $250,000 |
| -66'x5' Sidewalk -66' Curb & Gutter | 1629 17TH ST, BOULDER |
Other | Apr 6, 2026 | 1 | Under $250,000 |
| ESS installation NEW SYSTEM SIZE: 15.00KWHAC · 1 FRANKLIN APOWER 2, 15.00KWH BATTERY | 3390 4TH ST, BOULDER |
Electrical | Apr 6, 2026 | 1 | Under $250,000 |
| ESS battery. Installation of two Tesla Powerwall 3 batteries retrofit to an existing PV solar system. | 1821 REDWOOD AVE, BOULDER |
Electrical | Apr 6, 2026 | 1 | Under $250,000 |
| INSTALL 7.480 KW GRID-TIED, ROOF FLUSH, MOUNTED PV AND 13.500 kWh BATTERY. | 3970 GREENBRIAR BLVD, BOULDER |
Electrical | Apr 6, 2026 | 1 | Under $250,000 |
| Energy Storage System | 3237 WRIGHT AVE, BOULDER |
Electrical | Apr 6, 2026 | 1 | Under $250,000 |
| Replace 1 window and slider both like for like | 5405 GLENDALE GULCH CIR, BOULDER |
Other | Apr 6, 2026 | 1 | Under $250,000 |
| **VOID- Inspections not completed within 180 days** PDX WH TO A COMBI BOILER **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APP | 3301 ARAPAHOE AVE 302, BOULDER |
Mechanical | Apr 6, 2026 | 1 | Under $250,000 |
| drive way repair and widening curb into drive way | 2460 10TH ST, BOULDER |
Other | Apr 6, 2026 | 1 | Under $250,000 |
| ADR2025-00158 - Comcast proposes to place directional bore 1,383' to install fiber optic cable **contractor must notify impacted residents 7 | 3203 4TH ST, BOULDER |
Electrical | Apr 6, 2026 | 1 | Under $250,000 |
| Map 14 | Xcel Energy WO# 115611440 | pole replacement and XMFR replacement **contractor must coordinate with Chautauqua 303-952-1583 and Art | 807 BOGGESS CIR, BOULDER |
Other | Apr 6, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 25 squares of dimensional shingles on a pitch represented as | 2495 GRAPE AVE, BOULDER |
Roofing and exterior | Apr 6, 2026 | 1 | Under $250,000 |
| Detach/reattach an existing PV solar system, 24 Mods, 3 Arrays. Re-use racking, replace attachments with Ironridge FF2 and install new anima | 1880 REDWOOD AVE, BOULDER |
Electrical | Apr 6, 2026 | 1 | Under $250,000 |
| FOUR ZONE MITSUBISHI HYPER HEAT MINI SPLIT SYSTEM **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic gl | 1140 JUDSON DR, BOULDER |
Mechanical | Apr 6, 2026 | 1 | Under $250,000 |