| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 25 squares of dimensional shingles on a pitch represented as | 2237 4TH ST, BOULDER |
Roofing and exterior | Mar 5, 2026 | 1 | Under $250,000 |
| Install 27kWh Tesla Powerwall Energy Storage System. Tesla Backup Gateway will be the new service disconnect for one of the service legs. | 1343 BLUEBELL AVE, BOULDER |
Electrical | Mar 5, 2026 | 1 | Under $250,000 |
| CITY OF BOULDER PROJECT - IT-TS IG02 6-2025 FIBER OPTIC CABLE INSTALLATION, SPLICING, AND TERMINATING; CONDUIT AND HAND HOLE INSTALLATION; A | 2850 MAPLETON AVE, BOULDER |
Major renovation | Mar 5, 2026 | 1 | Subscribers |
| 50 amp 240 volt circuit for charger | 4157 CLIFTON CT, BOULDER |
Electrical | Mar 5, 2026 | 1 | Under $250,000 |
| 5 ton electric heat pump installation replacing an existing gas furnace. The gas line will be capped at the removed furnace location. Need t | 2840 ILIFF ST, BOULDER |
Mechanical | Mar 5, 2026 | 1 | Under $250,000 |
| ESS addition to existing PV system | 3110 HEIDELBERG DR, BOULDER |
Electrical | Mar 5, 2026 | 1 | Under $250,000 |
| INSTALLATION OF ROOF-MOUNTED UTILITY INTERACTIVE PV SYSTEM 7.92 KW DC & 6.28 KW AC PV MODULES - 18 HYUNDAI ENERGY HIN-T440NF(BK) INVERTER(S) | 790 GILPIN DR, BOULDER |
Electrical | Mar 5, 2026 | 1 | Under $250,000 |
| Boulder Reservoir ADA Dock Improvements **permit is Issued, but on Hold status (no construction activities until Sept 2026-TBD)** | 5100 RESERVOIR RD, BOULDER |
Major renovation | Mar 5, 2026 | 1 | Under $250,000 |
| Add or relocate 3 sprinkler heads per NFPA 13 2025 | 1881 9TH ST, BOULDER |
Other | Mar 5, 2026 | 1 | Under $250,000 |
| Upgrade transformer **contractor must notify impacted residents 72 hr in advance; no-parks must be placed 72 hrs in advance** **residents mu | 333 18TH ST, BOULDER |
Other | Mar 5, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 16.68 squares of dimensional shingles on a pitch represented | 3685 SILVER PLUME LN, BOULDER |
Roofing and exterior | Mar 5, 2026 | 1 | Under $250,000 |
| replace water heater **Any electrical work required beyond a like-for-like replacement of equipment will require an electrical permit for in | 1494 YAUPON AVE, BOULDER |
Mechanical | Mar 5, 2026 | 1 | Under $250,000 |
| Replace water heater **Any electrical work required beyond a like-for-like replacement of equipment will require an electrical permit for in | 2681 KALMIA AVE, BOULDER |
Mechanical | Mar 5, 2026 | 1 | Under $250,000 |
| Standard (80%) Efficiency Furnace Replacement **Any electrical work required beyond a like-for-like replacement of equipment will require an | 1344 OAKLEAF CIR, BOULDER |
Mechanical | Mar 5, 2026 | 1 | Under $250,000 |
| **VOID- 180+ Days without inspection** INSTALL REPLACEMENT 95% 199K BTU TANKLESS GAS WATER HEATER **Any electrical work required beyond a li | 3165 MARTINIQUE AVE, BOULDER |
Mechanical | Mar 5, 2026 | 1 | Under $250,000 |
| **REVISION 8/31/26-AIC ratings were off due to distance of Xcel's transformer, engineer made corrections. Small 5KVA secondary transformer a | 5600 FLATIRON PKWY, BOULDER |
Electrical | Mar 5, 2026 | 1 | Under $250,000 |
| JB0002176141- BORE, PULL AND SPLICE 680' OF 48 CT FIBER. 2 NEW VAULTS AND UPGRADE EXISITNG PEDESTAL. **contractor must notify impacted resid | 2590 SUMAC AVE, BOULDER |
Other | Mar 5, 2026 | 1 | Under $250,000 |
| WO 110233621 | Xcel pole change out with 2 crane sets | 4 poles & 4 transformers | **contractor must notify impacted residents and Bear Cree | 2830 DARLEY AVE, BOULDER |
Other | Mar 5, 2026 | 1 | Under $250,000 |
| 3/5/2026 - hydro trenching | sidewalk to remain open We are trenching (2) 2" conduits for 30-35 LF to connect the (2) EX. Zayo HHs. **work h | 2465 48TH CT, BOULDER |
Other | Mar 5, 2026 | 1 | Under $250,000 |
| Remove and Replace 19 Solar Modules **All Structures must be permitted separately** Total tear-off & reroof of SFD, 22 squares of dimensiona | 6662 DREW RANCH LN, BOULDER |
Roofing and exterior | Mar 5, 2026 | 1 | Under $250,000 |
| CARRIER COLD CLIMATE MULTISTAGE INVERTER DRIVEN HP/AC WITH 96% 2 STAGE VARIABLE SPEED FURNACE BACKUP. Replacing Water Heater with Heat Pump | 4735 LUDLOW ST, BOULDER |
Mechanical | Mar 5, 2026 | 1 | Under $250,000 |
| Xcel Energy will need a lane closure on the north side of the intersection of N 75th St. and Lookout Rd. in order to do maintenance on a sin | 5376 DESERT MOUNTAIN CT, BOULDER |
Other | Mar 5, 2026 | 2 | Under $250,000 |
| replace defective exterior 200amp main electrical panel and install new lever bypass meter as required | 701 HAWTHORN AVE, BOULDER |
Electrical | Mar 5, 2026 | 2 | Under $250,000 |
| **REVISION 5/1/26-Electrical panel relocated. THE PROJECT SCOPE CONSISTS OF THE INTERIOR REMODEL TO AN EXISTING 70,469 SF WHOLE FOODS MARKET | 2905 PEARL ST, BOULDER |
Major renovation | Mar 4, 2026 | 1 | $1 to $5 million |
| Replace existing decks back and front on units A & B at 5053 Valmont Rd. Deck construction plans provided are universal for all deck replace | 5053 VALMONT RD, BOULDER |
Other | Mar 4, 2026 | 1 | Under $250,000 |
| JB002499435 | Splicing in 4 locations **sidewalk closures for no more than 2 consecutive days** | 2460 48TH ST, BOULDER |
Other | Mar 4, 2026 | 1 | Under $250,000 |
| replace 50 gallon water heater like for like **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued v | 843 RACQUET LN, BOULDER |
Mechanical | Mar 4, 2026 | 1 | Under $250,000 |
| Gas install (1) 5x5 street cut (3) potholes (1) 70' bore **contractor must notify impacted residents 72 hrs in advance; no-parks must be pla | 2090 ORCHARD AVE, BOULDER |
Plumbing | Mar 4, 2026 | 1 | Under $250,000 |
| Electric overhead distribution upgrade **contractor must notify impacted residents 72 hrs in advance; no-parks must be placed 72 hrs in adva | 2595 GLENWOOD DR, BOULDER |
Electrical | Mar 4, 2026 | 1 | Under $250,000 |
| WO 109969965 | pole replacements utilizing crane in ROW | **contractor must notify impacted residents a minimum of 72 hours in advance** **n | 840 MOHAWK DR, BOULDER |
Other | Mar 4, 2026 | 1 | Under $250,000 |