| INSTALL GAS SERVICE (1)5' X 5' STREET CUTS 2 POTHOLES, 100' BORE WO #115530023 SUPERVISOR: Joseph Decarlo 720-215-0031 | 2530 KENWOOD DR, BOULDER |
Plumbing | Feb 19, 2026 | 1 | Under $250,000 |
| 115168890 | Cable replacement of 500AL to 1000CU using existing conduit | **contractor must notify impacted businesses a minimum of 72 hours | 1900 9TH ST, BOULDER |
Other | Feb 19, 2026 | 1 | Under $250,000 |
| REMOVE & REPLACE (3) WINDOWS AND (1) PATIO DOOR LIKE FOR LIKE - NO ALTERATIONS TO FRAMED OPENINGS - U-FACTORS .24 OR BETTER | 695 MANHATTAN DR 204, BOULDER |
Other | Feb 19, 2026 | 1 | Under $250,000 |
| Like for like replacement Atmospheric vent 50 gallon 40,000 Btus Energy factor .58 **Any electrical work required beyond a like-for-like rep | 3295 EMERSON AVE, BOULDER |
Mechanical | Feb 19, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 26.75 squares of three tab shingles on a pitch represented a | 5011 ELLSWORTH PL, BOULDER |
Roofing and exterior | Feb 19, 2026 | 1 | Under $250,000 |
| 200-amp service upgrade underground | 625 HAWTHORN AVE, BOULDER |
Electrical | Feb 19, 2026 | 1 | Under $250,000 |
| **EMERGENCY SEWER REPAIR - OUT OF SERVICE ** Replacement of approx 40' of sewer line from the ADU to the alley way. Tying into the existing | 1915 GOSS ST, BOULDER |
Plumbing | Feb 19, 2026 | 1 | Under $250,000 |
| Add 13.5kWh battery only. No solar existing. | 1990 KALMIA AVE, BOULDER |
Electrical | Feb 19, 2026 | 1 | Under $250,000 |
| Comcast proposes to place aerial overlash 774' to install fiber cable route **contractor must notify impacted residents and non-emergency po | 507 CANYON BLVD, BOULDER |
Other | Feb 19, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 41 squares of dimensional shingles on a pitch represented as | 4787 6TH ST, BOULDER |
Roofing and exterior | Feb 19, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 18 squares of dimensional shingles on a pitch represented as | 810 37TH ST, BOULDER |
Roofing and exterior | Feb 19, 2026 | 1 | Under $250,000 |
| Replace furnace & add AC - new 80K BTU 96% furnace + 2 Ton 15 SEER A/C **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCE | 2845 6TH ST, BOULDER |
Mechanical | Feb 19, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 22 squares of dimensional shingles on a pitch represented as | 450 S 40TH ST, BOULDER |
Roofing and exterior | Feb 19, 2026 | 1 | Under $250,000 |
| **VOID- Inspections not completed within 180 days** **All Structures must be permitted separately** Total tear-off & reroof of SFD, 55 squar | 5620 ARAPAHOE AVE, BOULDER |
Roofing and exterior | Feb 19, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 21 squares of dimensional shingles on a pitch represented as | 1520 JUDSON DR, BOULDER |
Roofing and exterior | Feb 19, 2026 | 1 | Under $250,000 |
| Replace tankless electric water heater, replace gas tankless water heater. Add 3 circuits for new electric water heater in crawlspace **PLEA | 645 15TH ST, BOULDER |
Mechanical | Feb 19, 2026 | 1 | Under $250,000 |
| Replacing Furnace X 2 Heat Pump replacing AC X 2 **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glu | 1870 TANSY PL, BOULDER |
Mechanical | Feb 19, 2026 | 1 | Under $250,000 |
| 50g 40k water heater replacement **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fue | 670 ITHACA DR, BOULDER |
Mechanical | Feb 19, 2026 | 1 | Under $250,000 |
| Replace main electrical panel & 2 subpanels & upgrade service (100A->200) | 645 NORTHSTAR CT, BOULDER |
Electrical | Feb 19, 2026 | 1 | Under $250,000 |
| RHEEM HEAT PUMP & AC (18SEER, 2T) WITH BACK UP FURNACE (96%, 2STAGE, VARIABLE) **Any electrical work required beyond a like-for-like replace | 385 MANHATTAN DR, BOULDER |
Mechanical | Feb 19, 2026 | 2 | Under $250,000 |
| 115460651 | gas demo - 5x5 street cut & 3 potholes **contractor must notify impacted residents a minimum of 72 hours in advance** **resident | 3075 5TH ST, BOULDER |
Demolition | Feb 19, 2026 | 1 | Under $250,000 |
| Replace existing CRAC (Computer Room Air Conditioning) unit with new one. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIA | 3280 AIRPORT RD, BOULDER |
Mechanical | Feb 19, 2026 | 2 | Under $250,000 |
| Construction trailer (24' x 60') in the southwestern corner of the property for the Spruce Townhomes project being constructed by Hyder Cons | 2050 FOLSOM ST, BOULDER |
Other | Feb 19, 2026 | 2 | Subscribers |
| *REVISION 6/8/26-Remodel to be built on a new reinforced foundation and in addition necessary parts of the ?house? block foundation will be | 1340 MEADOW AVE, BOULDER |
Major renovation | Feb 18, 2026 | 1 | Under $250,000 |
| **3/23/26 Revision to install 4-fan unit in lieu of the original 3-fan unit - changes to framing for additional weight of unit.** Repair / R | 1906 28TH ST, BOULDER |
Major renovation | Feb 18, 2026 | 1 | $1 to $5 million |
| Full demolition of existing 1952 single family residence. | 2170 HERMOSA DR, BOULDER |
Demolition | Feb 18, 2026 | 1 | Subscribers |
| Install one new illuminated wall sign. | 2530 JUNCTION PL, BOULDER |
Other | Feb 18, 2026 | 1 | Under $250,000 |
| 2514221 The Trade Desk Suite 200 PROVIDE THE FOLLOWING FIRE ALARM SYSTEM MODIFICATION TO ACCOMMODATE THE PROPOSED CONSTRUCTION FOR THE TRADE | 1048 PEARL ST, BOULDER |
Other | Feb 18, 2026 | 1 | Under $250,000 |
| Install 13.5kWh Tesla Powerwall Energy Storage System. The PV system is existing. | 325 LIPAN WAY, BOULDER |
Electrical | Feb 18, 2026 | 1 | Under $250,000 |
| Detached Garage Demo | 2926 11TH ST, BOULDER |
Demolition | Feb 18, 2026 | 1 | Subscribers |