| *2/12/2026 Revised description of work: Hardwired residential EV charger installation 32A charger on a 40A dedicated circuit.* Adjustable EV | 5231 HOLMES PL, BOULDER |
Electrical | Feb 12, 2026 | 1 | Under $250,000 |
| Xcel Energy gas needs to replace 4 way feed tee on the East corner of 23rd and Forest **contractor must notify impacted residents as soon as | 3160 23RD ST, BOULDER |
Plumbing | Feb 12, 2026 | 1 | Under $250,000 |
| ** VOID- Inspections not completed within 180 days** Installation of Battery Backup System | 1880 HAWTHORN AVE, BOULDER |
Electrical | Feb 12, 2026 | 1 | Under $250,000 |
| Private residential EV charger tied into existing MSP on dedicated 60A-2p breaker. #6 CU conductors, #10 CU ground, and 3/4" EMT or equivale | 3687 SILVERTON ST, BOULDER |
Electrical | Feb 12, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 39 squares of dimensional shingles on a pitch represented as | 730 MARINE ST, BOULDER |
Roofing and exterior | Feb 12, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 21 squares of dimensional shingles on a pitch represented as | 3953 SPRINGLEAF LN, BOULDER |
Roofing and exterior | Feb 12, 2026 | 1 | Under $250,000 |
| ***REVISION 3/13/26-Panel layout change Roof mounted solar panels with backup battery - 16 x 440W panels, 1 x 11.5 kW battery | 935 POPLAR PL, BOULDER |
Electrical | Feb 12, 2026 | 1 | Under $250,000 |
| Install 240V 30A hardwired ChargePoint home flex EV charger outside garage. | 3460 22ND ST, BOULDER |
Electrical | Feb 12, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 37 squares of dimensional shingles on a pitch represented as | 2970 13TH ST, BOULDER |
Roofing and exterior | Feb 12, 2026 | 1 | Under $250,000 |
| Replacement furnace and heat pump replacing an air conditioner. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All | 2750 VASSAR DR, BOULDER |
Mechanical | Feb 12, 2026 | 1 | Under $250,000 |
| Replacing current furnace with new furnace. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued ve | 60 S LASHLEY LN, BOULDER |
Mechanical | Feb 12, 2026 | 1 | Under $250,000 |
| Water heater replacement like for like. 50Gal, 40K BTU, Nat Gas | 2671 WINDING TRAIL DR, BOULDER |
Mechanical | Feb 12, 2026 | 1 | Under $250,000 |
| Bore 703 ft of 2"conduit along University Ave, 13th ST and Grandview Ave, place 3 handholes and trench 11 ft. Place fiber through conduit. * | 1295 UNIVERSITY AVE, BOULDER |
Electrical | Feb 12, 2026 | 1 | Under $250,000 |
| Install two spans of 1/0 spun on three poles along the north side of College Ave west of Jay St. All overhead work on poles, no street cuts. | 495 COLLEGE AVE, BOULDER |
Other | Feb 12, 2026 | 1 | Under $250,000 |
| JB0002355694- TRAFFIC CONTROL TO DIG UP AND REPLACE EXISTING PEDESTAL **contractor must notify impacted residents and place no-parks 72 hrs | 1100 28TH ST, BOULDER |
Other | Feb 12, 2026 | 1 | Under $250,000 |
| WO 109354467 - Traffic control for crane set to install (2) 40' class 3 poles for Xcel **contractor must notify impacted residents and non-e | 1170 ALBION WAY, BOULDER |
Other | Feb 12, 2026 | 1 | Under $250,000 |
| Occupancy permit for vertical soil boring taking place on CU Campus | bike path closure while moving equipment on bike path | closure & deto | 1050 REGENT DR, BOULDER |
Other | Feb 12, 2026 | 1 | Under $250,000 |
| WO 109795325 - Traffic control for crane set to change out 3 Xcel poles **contractor must notify impacted residents and non-emergency police | 3140 ENDICOTT DR, BOULDER |
Other | Feb 12, 2026 | 1 | Under $250,000 |
| 200amp service upgrade | 1280 LINDEN AVE, BOULDER |
Electrical | Feb 12, 2026 | 1 | Under $250,000 |
| Service Upgrade from 150A to 200A and Solar and ESS installation SYSTEM SIZE: 7.48KWDC, 11.50KWAC, 13.50KWHAC · 17 HYUNDAI HiN-T440NF(BK) MO | 1413 LODGE LN, BOULDER |
Electrical | Feb 12, 2026 | 2 | Under $250,000 |
| **180-day one-time extension request granted. Project must show progress by 2/7/2027.** THE PROJECT CONSISTS OF RENOVATIONS TO THE INTERIOR | 2885 WILDERNESS PL, BOULDER |
Major renovation | Feb 11, 2026 | 1 | $5 to $25 million |
| Replacement of the existing bridge structure at Central Avenue over Dry Creek No. 2 Ditch and removal of a failing pedestrian bridge. Constr | INT 57TH & CENTRAL, BOULDER |
Other | Feb 11, 2026 | 1 | Subscribers |
| Deck Replacement | 3820 LAKEBRIAR DR, BOULDER |
Other | Feb 11, 2026 | 1 | Under $250,000 |
| Replace 5 windows like for like with retrofit vinyl windows, U-factor .27 or better, installed per manufacturers specifications. | 2969 EAGLE WAY, BOULDER |
Other | Feb 11, 2026 | 1 | Under $250,000 |
| **REVISION 8/3/26-Install new support beam with caissons, inspected by engineer. Install concrete under stairs for support, inspected by eng | 1540 10TH ST, BOULDER |
Other | Feb 11, 2026 | 1 | Under $250,000 |
| Proposed project is an alteration to the existing 1,372 sf home with an addition of 1,944 sf for a total of 3,316 sf. Existing 395 sf carpor | 2960 LORRAINE CT, BOULDER |
Major renovation | Feb 11, 2026 | 1 | $250,000 to $1 million |
| Proposed project is an alteration to the existing 1,372 sf home with an addition of 1,944 sf for a total of 3,316 sf. Existing 395 sf carpor | 2960 LORRAINE CT, BOULDER |
Major renovation | Feb 11, 2026 | 1 | Subscribers |
| Bathroom remodel for a single family detached dwelling. Fixtures to be replaced in kind. | 1405 ITHACA DR, BOULDER |
Other | Feb 11, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 20 squares of dimensional shingles on a pitch represented as | 2020 EDGEWOOD DR, BOULDER |
Roofing and exterior | Feb 11, 2026 | 1 | Under $250,000 |
| Full sewer line replacement approx. 70ft from yard to street 3x10 cut | 3765 ARMER AVE, BOULDER |
Plumbing | Feb 11, 2026 | 1 | Under $250,000 |