| **3/10/26: Refund Requested** **3/17/26: Refund Issued-PERMIT WITHDRAWN** Scope of work at the existing front deck is to only replace the de | 890 LOCUST AVE, BOULDER |
Other | Feb 3, 2026 | 1 | Under $250,000 |
| Large free-standing hammer sculpture for Resource Central. | 6400 ARAPAHOE RD, BOULDER |
Other | Feb 3, 2026 | 1 | Under $250,000 |
| Remove wood siding. Ensure solid nailing surface, installing house wrap and install James Hardie Lap siding system per manufacturer specific | 390 LINDEN AVE, BOULDER |
Roofing and exterior | Feb 3, 2026 | 1 | Under $250,000 |
| Interior remodel work to demising existing fulll floor Tenant into two separate suites. Modify corridor to create multi-tenant corridor. No | 2490 JUNCTION PL, BOULDER |
Major renovation | Feb 3, 2026 | 1 | Under $250,000 |
| One monument and wall sign for 5777 Central Ave. | 5777 CENTRAL AVE, BOULDER |
Other | Feb 3, 2026 | 1 | Under $250,000 |
| One monument and wall sign for 5777 Central Ave. | 5777 CENTRAL AVE, BOULDER |
Other | Feb 3, 2026 | 1 | Subscribers |
| Replacing 2 ton 18 seer ac and coil / 80% 70 MBTUH gas furnace **Revision to add 40 gal NG Water Heater** **Any electrical work required bey | 550 MOHAWK DR 50, BOULDER |
Mechanical | Feb 3, 2026 | 1 | Under $250,000 |
| 115319572 | ANODE INSTALL | 2 POTHOLES TO INSTALL 2 ANODES | 1176 LOCUST AVE, BOULDER |
Other | Feb 3, 2026 | 1 | Under $250,000 |
| Complete tear off down tot he sheathing. Install new underlayment and JH Siding, | 3345 14TH ST, BOULDER |
Roofing and exterior | Feb 3, 2026 | 1 | Under $250,000 |
| 6? long sewer service tap repair in alley 4?-7? deep **contractor must notify impacted residents a minimum of 72 hours in advance** **impact | 810 COLLEGE AVE, BOULDER |
Plumbing | Feb 3, 2026 | 1 | Under $250,000 |
| Equipment is a 96% 100kbtu and a 3.5 ton ac **Any electrical work required beyond a like-for-like replacement of equipment will require an e | 807 AURORA AVE, BOULDER |
Mechanical | Feb 3, 2026 | 1 | Under $250,000 |
| Element Research Center Building 2 *All Structures must be permitted separately** Roof Overlay, 177 squares of mechanically attached Versico | 5920 LONGBOW DR, BOULDER |
Roofing and exterior | Feb 3, 2026 | 1 | Under $250,000 |
| Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). For | 1695 REDWOOD AVE, BOULDER |
Roofing and exterior | Feb 3, 2026 | 1 | Under $250,000 |
| Replacement furnace. This is a high efficiency furnace replacing an exisitng high efficiency furnace, no alterations will be done to the out | 531 SPRUCE ST, BOULDER |
Mechanical | Feb 3, 2026 | 1 | Under $250,000 |
| Replace water heater **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel burning ap | 3079 10TH ST, BOULDER |
Mechanical | Feb 3, 2026 | 1 | Under $250,000 |
| Replacement furnace and new heat pump. New electrical for the condenser. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIAN | 3005 24TH ST, BOULDER |
Mechanical | Feb 3, 2026 | 1 | Under $250,000 |
| HVAC Air Source Heat Pump. Full System installation with electrical subcontracted. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNI | 5973 WELLINGTON RD, BOULDER |
Mechanical | Feb 3, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 35 squares of dimensional shingles on a pitch represented as | 3360 34TH ST, BOULDER |
Roofing and exterior | Feb 3, 2026 | 1 | Under $250,000 |
| **REVISION 8/5/26-Updated Plans reflect the N-G bond removed, as well as the GEC/GE removed per inspector. **REVISION 5/20/26-Moved one pane | 2045 ALPINE DR, BOULDER |
Electrical | Feb 3, 2026 | 2 | Under $250,000 |
| Full structure deconstruction of the existing single family detached dwelling. | 757 8TH ST, BOULDER |
Demolition | Feb 2, 2026 | 1 | Subscribers |
| Renovations to existing 40,000 GSF two story building to house Boulder County Human Services. Project includes a full interior renovation an | 2525 28TH ST, BOULDER |
Major renovation | Feb 2, 2026 | 1 | $5 to $25 million |
| New front porch, new rear deck, interior remodel consisting of new kitchen, new baths, new stairs, replacement windows. | 2870 15TH ST, BOULDER |
Major renovation | Feb 2, 2026 | 1 | $250,000 to $1 million |
| tub to shower conversion, not moving any drain or water lines. not doing any underground plumbing work. replacing shower valve, negative asb | 1120 CLAREMONT DR, BOULDER |
Other | Feb 2, 2026 | 1 | Under $250,000 |
| Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). For | 4624 S HAMPTON CIR, BOULDER |
Roofing and exterior | Feb 2, 2026 | 1 | Under $250,000 |
| Gas demo (1) 5x5 street cut (3) potholes **contractor must notify impacted residents as soon as possible** **residents must be allowed in an | 2190 LINDEN AVE, BOULDER |
Demolition | Feb 2, 2026 | 1 | Under $250,000 |
| Install three helical piers per the engineering | 980 LINCOLN PL, BOULDER |
Other | Feb 2, 2026 | 1 | Under $250,000 |
| The proposed work is adding two generator transfer switches (1-0-2) to dedicated circuits of the house. The "generator" is a 7.2 kWh battery | 4494 APPLEWOOD CT, BOULDER |
Electrical | Feb 2, 2026 | 1 | Under $250,000 |
| Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). For | 4274 GRAHAM CT, BOULDER |
Roofing and exterior | Feb 2, 2026 | 1 | Under $250,000 |
| Upgrade service to 320 amp. | 300 LIPAN WAY, BOULDER |
Electrical | Feb 2, 2026 | 1 | Under $250,000 |
| Replace Water Heater with Like for Like. Haul away old Water Heater. 50-Gallon State Proline Atmospheric Vent 40,000 btu/h **Any electrical | 3215 15TH ST, BOULDER |
Mechanical | Feb 2, 2026 | 1 | Under $250,000 |