| TRAFFIC CONTROL TO ACCESS HANDHOLE & SPLICE FIBER | 2120 13TH ST, BOULDER |
Other | Jan 7, 2026 | 1 | Under $250,000 |
| Install ductless single zone mini split a/c and heat pump **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new pl | 3262 REDSTONE LN, BOULDER |
Mechanical | Jan 7, 2026 | 1 | Under $250,000 |
| Water line install up to 60' long, 5' deep. A new curbstop, yoke and meter pit to be installed. 1" type K copper **contractor must permit al | 951 RAINBOW WAY, BOULDER |
Other | Jan 7, 2026 | 1 | Subscribers |
| We are accessing MHs/HHs to verify existing path. | 5500 CENTRAL AVE, BOULDER |
Other | Jan 7, 2026 | 1 | Under $250,000 |
| place a roll-off dumpster for hauling debris from jobsite | 215 MOHAWK DR, BOULDER |
Other | Jan 7, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 31 squares of dimensional shingles on a pitch represented as | 470 JUNIPER AVE, BOULDER |
Roofing and exterior | Jan 7, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Partial tear-off & reroof of SFD, 17 squares of dimensional shingles on a pitch represented | 2940 20TH ST, BOULDER |
Roofing and exterior | Jan 7, 2026 | 1 | Under $250,000 |
| Installation of a 4 Ton Mitsubishi Cold Climate Heat Pump System. Condenser Model# PUZ-AK48NLHZ, AHU Model# PVA-AA48NL. Electrical scope of | 3315 MARTINIQUE AVE, BOULDER |
Mechanical | Jan 7, 2026 | 1 | Under $250,000 |
| Installation of mini split system with 25 amp electrical service **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All | 3582 SMUGGLER WAY, BOULDER |
Mechanical | Jan 7, 2026 | 1 | Under $250,000 |
| Replacement furnace and replacement water heater **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glu | 5741 N ORCHARD CREEK CIR, BOULDER |
Mechanical | Jan 7, 2026 | 1 | Under $250,000 |
| repair offset on wastewater service and install cleanouts | 1725 GILLASPIE DR, BOULDER |
Other | Jan 7, 2026 | 1 | Subscribers |
| Install: (2) 50 KVA XFMR and (1) 40' class 3 Wooden Pole Remove: (1) 25 KVA XFMR and (1) 35' Wood Pole **contractor must notify impacted res | 4268 GRAHAM CT, BOULDER |
Other | Jan 7, 2026 | 1 | Under $250,000 |
| Install: (2) 50 KVA XFMR and (1) 40' class 3 Wooden Pole Remove: (1) 25 KVA XFMR and (1) 35' Wood Pole **contractor must notify impacted res | 4468 HAMILTON CT, BOULDER |
Other | Jan 7, 2026 | 1 | Under $250,000 |
| 110056466 | Install: (2) 50 KVA XFMR and (1) 40' Wooden Pole | Remove: (1) 25 KVA XFMR and (1) 35' Wood Pole **contractor must coordinate wi | 4435 MOORHEAD AVE, BOULDER |
Other | Jan 7, 2026 | 1 | Under $250,000 |
| Install: (1) 50 KVA XFMR Remove: (1) KVA XFMR **contractor must notify impacted residents as soon as possible** **residents must be allowed | 4635 MOORHEAD AVE, BOULDER |
Other | Jan 7, 2026 | 1 | Under $250,000 |
| 110051022 | Transformer replacement in easement, TCP for occupancy | 4235 MOORHEAD AVE, BOULDER |
Other | Jan 7, 2026 | 1 | Under $250,000 |
| 115259328 | gas demo - 5x5 street cut and 3x potholes | 439 17TH ST, BOULDER |
Demolition | Jan 7, 2026 | 1 | Under $250,000 |
| Add steel beam in crawlspace, supported by (3) pads and monoposts, to support sagging floor. | 1520 BASELINE RD, BOULDER |
Other | Jan 7, 2026 | 2 | Under $250,000 |
| Boulder Reservoir ADA Dock and Accessible Path | 6075 RESERVOIR RD, BOULDER |
Other | Jan 6, 2026 | 1 | Subscribers |
| Refund request sent to finance on 1/26/26. Refund request letter in attachments. Mid-roof inspection is required if 1) pitch is less than 4/ | 1115 HANCOCK DR A, BOULDER |
Roofing and exterior | Jan 6, 2026 | 1 | Under $250,000 |
| Voided for inactivity - no inspection within 180 days. Remove and replace 40 gallon water heater, 34,000 BTU **Any electrical work required | 6582 FINLEY PL 304, BOULDER |
Mechanical | Jan 6, 2026 | 1 | Under $250,000 |
| Refund request sent to finance on 1/26/26. Refund request letter in attachments. Existing Solar will be removed and not reinstalled. Mid-roo | 875 39TH ST, BOULDER |
Roofing and exterior | Jan 6, 2026 | 1 | Under $250,000 |
| Installation of solar panels on existing residential roof. 6.02 kW. Addition of 3 0-60A circuits. 14 panels. Meter pull required for energy | 740 39TH ST, BOULDER |
Electrical | Jan 6, 2026 | 3 | Under $250,000 |
| Remove 10 SQ of siding on northwest, west and south walls. Replace with LP Smartside wood composite panel siding. | 1935 GOSS ST, BOULDER |
Roofing and exterior | Jan 5, 2026 | 1 | Under $250,000 |
| Install new Entry Door - Pro Via Fiberglass with Sidelite (Signet) | 5446 SENECA PL, BOULDER |
Other | Jan 5, 2026 | 1 | Under $250,000 |
| TI Remodel (FSR 13) | 5455 SPINE RD, BOULDER |
Major renovation | Jan 5, 2026 | 1 | Under $250,000 |
| Interior Alteration of a portion of the 1st and 2nd Floor office areas. Scope includes adding new offices, conference rooms, and mother's ro | 2300 55TH ST, BOULDER |
Major renovation | Jan 5, 2026 | 1 | $1 to $5 million |
| Interior, Non-Structural Demolition in prep of Office Space remodel related to BLD-NRE2025-00179. | 2300 55TH ST, BOULDER |
Demolition | Jan 5, 2026 | 1 | Subscribers |
| Remove & replace (19) squares of siding with plank lap James Hardie siding (home built in 1966). - No changes to existing brick (chimney) - | 1405 ITHACA DR, BOULDER |
Roofing and exterior | Jan 5, 2026 | 1 | Under $250,000 |
| Relocation of Approx. 7 sprinkler heads to accommodate new ceiling/equipment layout in Cath Lab.(FSR 13) | 4747 ARAPAHOE AVE, BOULDER |
Other | Jan 5, 2026 | 1 | Under $250,000 |