| **All Structures must be permitted separately** Total tear-off & reroof of Mobile Home Unit, 10 squares of dimensional shingles on a pitch r | 4500 19TH ST 3, BOULDER |
Roofing and exterior | Dec 26, 2025 | 1 | Under $250,000 |
| Voided for inactivity - no inspection within 180 days. Replace furnace - new 100K BTU 96% furnace. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS | 5423 GLENDALE GULCH CIR, BOULDER |
Mechanical | Dec 26, 2025 | 1 | Under $250,000 |
| VOID-180 Days no activity REPLACE MID EFFICIENCY SINGLE STAGE HEAT PUMP AIR CONDITIONER. 80% EFFICIENT TWO STAGE HEAT FURNACE WITH MULTI SPE | 3150 11TH ST, BOULDER |
Mechanical | Dec 26, 2025 | 1 | Under $250,000 |
| VOID-180 Days no activity Furnace replacement and heat pump add on 60k 96% furnace and 2-ton 17 seer Heat Pump. **PLEASE NOTE: APPLICABLE ON | 1880 DEL ROSA CT, BOULDER |
Mechanical | Dec 26, 2025 | 1 | Under $250,000 |
| VOID-180 Days no activity Remove and recycle the old furnace and air conditioner. Supply and install new York 60,000btu 2 stage up flow furn | 3502 NOTTINGHAM CT 6, BOULDER |
Mechanical | Dec 26, 2025 | 1 | Under $250,000 |
| VOID-180 Days no activity Remove and recycle the old furnace and air conditioner. Supply and install new York 60,000btu 2 stage up flow furn | 3502 NOTTINGHAM CT 5, BOULDER |
Mechanical | Dec 26, 2025 | 1 | Under $250,000 |
| VOID-180 Days no activity Remove and recycle the old furnace and air conditioner. Supply and install new York 60,000btu 2 stage up flow furn | 3502 NOTTINGHAM CT 4, BOULDER |
Mechanical | Dec 26, 2025 | 1 | Under $250,000 |
| VOID-180 Days no activity Remove and recycle the old furnace and air conditioner. Supply and install new York 60,000btu 2 stage up flow furn | 3502 NOTTINGHAM CT 3, BOULDER |
Mechanical | Dec 26, 2025 | 1 | Under $250,000 |
| VOID-180 Days no activity Remove and recycle the old furnace and air conditioner. Supply and install new York 60,000btu 2 stage up flow furn | 3502 NOTTINGHAM CT 2, BOULDER |
Mechanical | Dec 26, 2025 | 1 | Under $250,000 |
| VOID-180 Days no activity Remove and recycle the old furnace and air conditioner. Supply and install new York 60,000btu 2 stage up flow furn | 3502 NOTTINGHAM CT 1, BOULDER |
Mechanical | Dec 26, 2025 | 1 | Under $250,000 |
| VOID-180 Days no activity Mast bent above roofline, braces torn away, power still on. Install new 200 amp mast with braces and reconnect. No | 4627 TALBOT DR, BOULDER |
Electrical | Dec 26, 2025 | 1 | Under $250,000 |
| sewer service repair in surface easement to the service tap/saddle | 4540 SIOUX DR, BOULDER |
Plumbing | Dec 26, 2025 | 1 | Under $250,000 |
| Replace like for like gas furnace M#R962V1155A24M4SCAP, 115,000 BTU **Any electrical work required beyond a like-for-like replacement of equ | 445 QUAIL CIR, BOULDER |
Mechanical | Dec 26, 2025 | 1 | Under $250,000 |
| **Revision 9/30/2026 to include 34 sf concrete porch at rear of house and 169 sf covered porch. Includes can lighting and ceiling fan.** 296 | 865 UNION AVE, BOULDER |
Major renovation | Dec 24, 2025 | 1 | $1 to $5 million |
| Roof Mount 8.6kW PV with Energy Storage System | 2940 18TH ST, BOULDER |
Electrical | Dec 24, 2025 | 1 | Under $250,000 |
| One monument and wall sign for 1965 N 57th CT. | 1965 57TH CT, BOULDER |
Other | Dec 24, 2025 | 1 | Under $250,000 |
| One monument and wall sign for 1965 N 57th CT. | 1965 57TH CT, BOULDER |
Other | Dec 24, 2025 | 1 | Subscribers |
| Replace furnace 80% 110K BTU Replace AC with Heat Pump 4 ton **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new | 1110 QUINCE AVE, BOULDER |
Mechanical | Dec 24, 2025 | 1 | Under $250,000 |
| VOID-180 Days no activity Remove and recycle the old furnace and air conditioner. Supply and install new York 60,000btu 2 stage up flow furn | 3500 ARTHUR CT 4, BOULDER |
Mechanical | Dec 24, 2025 | 1 | Under $250,000 |
| VOID-180 Days no activity Remove and recycle the old furnace and air conditioner. Supply and install new York 60,000btu 2 stage up flow furn | 3500 ARTHUR CT 3, BOULDER |
Mechanical | Dec 24, 2025 | 1 | Under $250,000 |
| VOID-180 Days no activity Remove and recycle the old furnace and air conditioner. Supply and install new York 60,000btu 2 stage up flow furn | 3500 ARTHUR CT 2, BOULDER |
Mechanical | Dec 24, 2025 | 1 | Under $250,000 |
| VOID-180 Days no activity Remove and recycle the old furnace and air conditioner. Supply and install new York 60,000btu 2 stage up flow furn | 3500 ARTHUR CT 1, BOULDER |
Mechanical | Dec 24, 2025 | 1 | Under $250,000 |
| Install electric vehicle charging stations as detailed on the plans. | 5500 FLATIRON PKWY, BOULDER |
Electrical | Dec 23, 2025 | 1 | Under $250,000 |
| TILSON / T-MOBILE / ADR#: ADR2025-00143 13 hard surface potholes / 10 soft surface potholes / Bore 2275', install conduit and pull through f | 3879 19TH ST, BOULDER |
Electrical | Dec 23, 2025 | 1 | Under $250,000 |
| Tenant improvement for suite 200 for mechanical, electrical, and architectural remodel. | 1048 PEARL ST, BOULDER |
Major renovation | Dec 23, 2025 | 1 | $1 to $5 million |
| *Voided for inactivity. No inspections performed within 180 days.* Freestanding - Single Sided, Post & Panel metal sign, 48"x24", Non-Lit, p | 1925 GLENWOOD DR, BOULDER |
Other | Dec 23, 2025 | 1 | Under $250,000 |
| Installation of a new 2.835 kW DC roof mounted solar system. Property has an existing/old solar panels but it will be removed and disposed. | 4463 AARON PL, BOULDER |
Electrical | Dec 23, 2025 | 1 | Under $250,000 |
| **Permit Extension Granted** New meter pedestal for new traffic equipment at Broadway & Baseline Rd. | 2402 BASELINE RD, BOULDER |
Electrical | Dec 23, 2025 | 1 | Under $250,000 |
| Interior remodel of existing main-level common areas and upper-level hall bath. | 4911 TESLA CT, BOULDER |
Major renovation | Dec 23, 2025 | 1 | $250,000 to $1 million |
| *voided for inactivity. No inspections requested within 180 days.* Replace existing equipment with a Rheem 2-Stage Variable Speed **Any elec | 552 ARAPAHOE AVE, BOULDER |
Mechanical | Dec 23, 2025 | 1 | Under $250,000 |