| replacement furnace and heat pump replacing air conditioner **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new | 1789 YELLOW PINE AVE, BOULDER |
Mechanical | Dec 8, 2025 | 1 | Under $250,000 |
| Will use an excavator to dig down to the sewer line. Approximately 8 feet in depth. Will remove the damaged section of pipe and install PVC | 3640 BROADWAY, BOULDER |
Plumbing | Dec 8, 2025 | 1 | Subscribers |
| 8'x3' ASPHALT CUT FOR SEWER TAP REPAIR; RESTORATION WITH FLOWFILL AND ASPHALT TO CITY STANDARDS **contractor must notify impacted residents | 620 S 40TH ST, BOULDER |
Plumbing | Dec 8, 2025 | 1 | Under $250,000 |
| *Voided for non-inspection. No inspections requested within 180 days.* RHEEM 98% MODULATING FURNACE **Any electrical work required beyond a | 745 S 45TH ST, BOULDER |
Mechanical | Dec 8, 2025 | 1 | Under $250,000 |
| Replace existing boiler #2 with a new Lochinvar CBN0747-M13-8013 boiler. **Any electrical work required beyond a like-for-like replacement o | 2060 BROADWAY, BOULDER |
Mechanical | Dec 8, 2025 | 1 | Under $250,000 |
| Furnace install 90K BTU, 97% **Any electrical work required beyond a like-for-like replacement of equipment will require an electrical permi | 939 MEADOW GLEN DR, BOULDER |
Mechanical | Dec 8, 2025 | 1 | Under $250,000 |
| *Voided for non-inspection. No inspections requested within 180 days.* Replace existing equipment with a Rheem Heat Pump System **Any electr | 4129 AMBER ST, BOULDER |
Mechanical | Dec 8, 2025 | 2 | Under $250,000 |
| Building 20. A three story, residential building, including 10 flats, 5 attached garages, and interior bike storage areas. Market rate dwell | 4673 SPINE RD, BOULDER |
Major renovation | Dec 5, 2025 | 1 | Subscribers |
| Addition of 1000 square feet of living space, 400 square feet addition of non-living space (garage), all attached to preexisting single fami | 1125 EDINBORO DR, BOULDER |
Major renovation | Dec 5, 2025 | 1 | $250,000 to $1 million |
| Partial siding replacement. Soffit and Fascia only. *HIS2025-000390* | 1069 BEREA DR, BOULDER |
Roofing and exterior | Dec 5, 2025 | 1 | Under $250,000 |
| **REVISION 5/16/26-Inverter and all three EG 414.3Kwh batteries will be installed in detached garage. There will be a trend and electrical l | 2460 10TH ST, BOULDER |
Electrical | Dec 5, 2025 | 1 | Under $250,000 |
| Remove 10 SQ of siding on northwest, west and south walls. Replace with LP Smartside wood composite panel siding. | 1935 GOSS ST, BOULDER |
Roofing and exterior | Dec 5, 2025 | 1 | Subscribers |
| Replacement of (1) window in a like for like sizing manner, no structural modifications to be made. Window will be installed as a nail flang | 702 BROOKLAWN DR, BOULDER |
Plumbing | Dec 5, 2025 | 1 | Under $250,000 |
| We will be replacing (1) entry door in a like for like sizing manner, no structural modifications to be made. All entry door will be install | 805 29TH ST 555, BOULDER |
Plumbing | Dec 5, 2025 | 1 | Under $250,000 |
| VOID- 180 Days no activity replacing an old existing zero-clearance gas insert with a new gas insert **PLEASE NOTE: APPLICABLE ONLY TO SYSTE | 330 HOPI PL, BOULDER |
Mechanical | Dec 5, 2025 | 1 | Under $250,000 |
| COMCAST PROPOSES TO SPLICE AT EXISTING MULTIPLE LOCATIONS ALONG ARAPAHOE AVE ST INSIDE THE ROW OF THE CITY OF BOULDER , CO. | 4747 ARAPAHOE AVE, BOULDER |
Other | Dec 5, 2025 | 1 | Under $250,000 |
| Replacement of (1) window in a like for like sizing manner, no structural modifications to be made. Window will be installed as a nail flang | 3870 BROADWAY 12, BOULDER |
Other | Dec 5, 2025 | 1 | Under $250,000 |
| Emergency gas repair (1)5x5 dig pit; 2 potholes, 50' bore Supervisor Tim Hettinger: 303-829-3153 **contractor must notify impacted residents | 4250 GRINNELL AVE, BOULDER |
Plumbing | Dec 5, 2025 | 1 | Under $250,000 |
| VOID- 180 Days no activity Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles | 3949 SAINT PETERSBURG ST, BOULDER |
Roofing and exterior | Dec 5, 2025 | 1 | Under $250,000 |
| Replace tank water heater with tankless high efficiency unit **Any electrical work required beyond a like-for-like replacement of equipment | 335 ONEIDA ST, BOULDER |
Mechanical | Dec 5, 2025 | 1 | Under $250,000 |
| VOID- 180 Days no activity Replace 80% Furnace with an 80% Furnace. No other changes. **Any electrical work required beyond a like-for-like | 1013 PORTLAND PL 3, BOULDER |
Mechanical | Dec 5, 2025 | 1 | Under $250,000 |
| 30 yard dumpster to be set in front of the address on the street because the driveway is too steep. | 1133 WOODLAND CT, BOULDER |
Other | Dec 5, 2025 | 1 | Under $250,000 |
| COMCAST PROPOSES TO SPLICE AT EXISTING MULTIPLE LOCATIONS ALONG ARAPAHOE AVE INSIDE THE ROW OF THE CITY OF BOULDER, CO. | 5340 ARAPAHOE AVE, BOULDER |
Other | Dec 5, 2025 | 1 | Under $250,000 |
| JB 2384137 | fiber splicing in two locations | **contractor must coordinate with CDOT for TCP in CDOT right-of-way** **flagger to escort ped | 4440 ARAPAHOE AVE, BOULDER |
Other | Dec 5, 2025 | 1 | Under $250,000 |
| Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). For | 628 MAXWELL AVE, BOULDER |
Roofing and exterior | Dec 5, 2025 | 1 | Under $250,000 |
| Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). For | 1632 4TH ST, BOULDER |
Roofing and exterior | Dec 5, 2025 | 1 | Under $250,000 |
| Replace water heater like for like **Any electrical work required beyond a like-for-like replacement of equipment will require an electrical | 1504 HARRISON AVE, BOULDER |
Mechanical | Dec 5, 2025 | 1 | Under $250,000 |
| VOID- 180 Days no activity Install a 125 AMP subpanel | 760 S 42ND ST, BOULDER |
Electrical | Dec 5, 2025 | 1 | Under $250,000 |
| Circuits for Washer & Dryer. | 3240 IRIS AVE G104, BOULDER |
Electrical | Dec 5, 2025 | 1 | Under $250,000 |
| Comcast proposes to tie in to existing splice at multiple locations **paid parking spaces not occupied** | 921 WALNUT ST, BOULDER |
Other | Dec 5, 2025 | 1 | Under $250,000 |