| Service change 200 amp overhead with 50 amp breaker | 4657 HUEY CIR, BOULDER |
Electrical | Oct 21, 2026 | 1 | Under $250,000 |
| wastewater service repair to the tap in the street | CONDITIONS OF APPROVAL: **contractor must coordinate any restoration and TCP with Bould | 4388 CARTER TRL, BOULDER |
Other | Oct 21, 2026 | 1 | Subscribers |
| in-property wastewater service repair | 3755 DARLEY AVE, BOULDER |
Other | Oct 21, 2026 | 1 | Subscribers |
| Partial sewer service line replacement in the front yard of the property address. Total length of replacement will be 20' long and up to 6' | 1035 ROSEHILL DR, BOULDER |
Plumbing | Oct 21, 2026 | 1 | Subscribers |
| in-property wastewater service repair | 4842 HOPKINS PL, BOULDER |
Other | Oct 21, 2026 | 1 | Subscribers |
| replace existing sewer service from the house to the street | 7x4 street cut | CONDITIONS OF APPROVAL: **sidewalk closure for no more than 3 | 2919 7TH ST, BOULDER |
Plumbing | Oct 21, 2026 | 1 | Under $250,000 |
| after-the-fact Emergency OOS wastewater service repair | 3151 7TH ST, BOULDER |
Other | Oct 21, 2026 | 1 | Under $250,000 |
| Boiler Replacement SER2-205 Burnham Series 2-205 Boiler. 84% AFUE 138,000 BTU Warranty: 10 year heat exchanger (25 year prorated), one year | 2965 DARTMOUTH AVE, BOULDER |
Mechanical | Oct 21, 2026 | 1 | Under $250,000 |
| Installing new ducted heat pump system **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents f | 4656 18TH ST, BOULDER |
Mechanical | Oct 21, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 27 squares of dimensional shingles on a pitch represented as | 6675 BEAN MOUNTAIN LN, BOULDER |
Roofing and exterior | Oct 21, 2026 | 1 | Under $250,000 |
| Like for like 40 gal water heater replacement **Any electrical work required beyond a like-for-like replacement of equipment will require an | 2143 PINE ST 2, BOULDER |
Mechanical | Oct 21, 2026 | 1 | Under $250,000 |
| replace water heater **Any electrical work required beyond a like-for-like replacement of equipment will require an electrical permit for in | 4125 47TH ST B, BOULDER |
Mechanical | Oct 21, 2026 | 1 | Under $250,000 |
| in-property wastewater service repair | 757 8TH ST, BOULDER |
Other | Oct 21, 2026 | 1 | Subscribers |
| Install 18K Mini Split Single Zone System **Any electrical work required beyond a like-for-like replacement of equipment will require an ele | 875 UTICA AVE, BOULDER |
Mechanical | Oct 21, 2026 | 1 | Under $250,000 |
| Emergency like for like 50 gal water heater replacement **Any electrical work required beyond a like-for-like replacement of equipment will | 1644 PEARL ST, BOULDER |
Mechanical | Oct 21, 2026 | 1 | Under $250,000 |
| WO 116579660 | install 350 AL secondary from the existing pole to the pedestal location on customer property | CONDITIONS OF APPROVAL: **con | 3161 7TH ST, BOULDER |
Other | Oct 21, 2026 | 1 | Under $250,000 |
| Additional spot repair in the city sidewalk 8' deep | CONDITIONS OF APPROVAL: **contractor must notify impacted residents/businesses as soon | 2033 5TH ST, BOULDER |
Major renovation | Oct 21, 2026 | 1 | Under $250,000 |
| Installation will be a direct swap for the existing unit. We will be adding an expansion tank to bring it up to current plumbing codes. **An | 1665 ORCHARD AVE, BOULDER |
Mechanical | Oct 21, 2026 | 2 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 22 squares of dimensional shingles on a pitch represented as | 1475 KENDALL DR, BOULDER |
Roofing and exterior | Oct 21, 2026 | 3 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 17 squares of dimensional shingles on a pitch represented as | 727 ITHACA DR, BOULDER |
Roofing and exterior | Oct 21, 2026 | 2 | Under $250,000 |
| Installation of new service elevator and stair to existing core and shell unfinished space. ***7-6-26*** Updates to add new elevator control | 5505 CENTRAL AVE, BOULDER |
Major renovation | Oct 21, 2026 | 2 | $1 to $5 million |
| Reconstruction of a rear deck for a single family detached dwelling. Deck is located in the 100-year floodplain. | 1450 LODGE LN, BOULDER |
Other | Oct 20, 2026 | 1 | Under $250,000 |
| Rebuild of rear deck for a single family detached dwelling. Class 2 IR construction required. | 3174 REDSTONE RD, BOULDER |
Other | Oct 20, 2026 | 1 | Under $250,000 |
| 7' x 79' IN-GROUND UNHEATED CONCRETE SWIMMING POOL WITH AUTOMATIC SAFETY COVER AS BARRIER. | 1324 CEDAR AVE, BOULDER |
Other | Oct 20, 2026 | 1 | Under $250,000 |
| Installing 12K outdoor heat pump with 1 indoor head. **Any electrical work required beyond a like-for-like replacement of equipment will req | 550 SPRUCE ST, BOULDER |
Mechanical | Oct 20, 2026 | 1 | Under $250,000 |
| Replacing all existing wood siding and trim with James Hardie fiber cement siding and trim. **ONLY FINAL BUILDING INSPECTION IS REQUIRED ON | 4860 KINGS RIDGE BLVD, BOULDER |
Roofing and exterior | Oct 20, 2026 | 1 | Under $250,000 |
| Installing ductless system. 1-MUZ-FX18NLHZ Heat Pump 1-MSZ-FX18NL Wall Mounted unit **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURN | 1445 RIVERSIDE AVE, BOULDER |
Mechanical | Oct 20, 2026 | 1 | Under $250,000 |
| JB0002639778 - ROW COMCAST PROPOSES TO PLACE DIRECTIONAL BORE 310 FT OF TO INSTALL FIBER OPTIC CABLE TO PROVIDE SERVICE NEAR 2121 BROADWAY, | 2121 BROADWAY, BOULDER |
Other | Oct 20, 2026 | 1 | Under $250,000 |
| Scope of Work Letter per Boulder Fire Marshall (Zach) this is all we need to submit. No inspections will take place. | 5757 CENTRAL AVE, BOULDER |
Other | Oct 20, 2026 | 1 | Under $250,000 |
| Sanitary sewer repair from plastic transition at building drain up to the property line. Up to 35' of pipe. | 380 27TH ST, BOULDER |
Plumbing | Oct 20, 2026 | 1 | Subscribers |