| Relocate 61 uprights to pedants, add 50 pendants and add 2 uprights. | 3107 IRIS AVE, BOULDER |
Other | Jul 17, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 18 squares of dimensional shingles on a pitch represented as | 2820 COLBY DR, BOULDER |
Roofing and exterior | Jul 17, 2026 | 2 | Under $250,000 |
| 3 TON ELECTRIC HEAT PUMP INSTALLATION REPLACING AN EXISTING GAS FURNACE. THE GAS LINE WILL BE CAPPED AT THE REMOVED FURNACE LOCATION. NEED T | 3565 19TH ST, BOULDER |
Mechanical | Jul 17, 2026 | 2 | Under $250,000 |
| Interior remodel, addition on West side and loft above | 2425 VASSAR DR, BOULDER |
Major renovation | Jul 17, 2026 | 3 | $250,000 to $1 million |
| Replacement and installation of a Boiler **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents | 1775 DEER VALLEY RD, BOULDER |
Mechanical | Jul 17, 2026 | 3 | Under $250,000 |
| *Voided for non-inspection. No inspections requested within 180 days.* 4-ton electric heat pump installation replacing an existing gas furna | 1266 AIKINS WAY, BOULDER |
Mechanical | Jul 17, 2026 | 2 | Under $250,000 |
| Upgrade electrical service to 200 amps and add 50 amp circuit for a car charger | 772 16TH ST, BOULDER |
Electrical | Jul 17, 2026 | 3 | Under $250,000 |
| Existing four-story building with mezzanine. There are 83 units. The scope contains adding washing machines and ventless dryers to each unit | 1853 26TH ST, BOULDER |
Major renovation | Jul 16, 2026 | 1 | Under $250,000 |
| **Revision to scope - 8/31/26 -During demo the contractor requested a change in the floor plans to better accommodate the existing plumbing | 970 AURORA AVE A101, BOULDER |
Major renovation | Jul 16, 2026 | 1 | Under $250,000 |
| Installation of FranklinWH aPower 2 battery and aGate transfer equipment for whole-home backup. Existing PV interconnection to be relocated | 1384 GLEN CT, BOULDER |
Electrical | Jul 16, 2026 | 1 | Under $250,000 |
| TOTAL SCOPE OF PROJECT ALTERATION: WORK AREA 1 (25 sf) Partially remove (6'-6" wide) section of an existing non-load bearing wood stud parti | 962 11TH ST 2, BOULDER |
Other | Jul 16, 2026 | 1 | Under $250,000 |
| New channel letter sign for Studio Pilates | 3320 28TH ST, BOULDER |
Other | Jul 16, 2026 | 1 | Under $250,000 |
| INSTALLATION OF ESS 11.40kw. 1 TESLA POWERWALL 3 EXPANSION UNIT 1807000-20-Y | 3428 SAINT VINCENT PL, BOULDER |
Electrical | Jul 16, 2026 | 1 | Under $250,000 |
| -Furnish and install two (2) DCC load management devices (one per charger location). -Install new electrical raceway (surface-mounted EMT) f | 1360 WALNUT ST 201, BOULDER |
Electrical | Jul 16, 2026 | 1 | Under $250,000 |
| 1) Installation of two dual port DCFC and six dual port L2 chargers. 2) All conduit existing under previous permit #ELE2024-00910. 3) All se | 63 S CHERRYVALE RD, BOULDER |
Electrical | Jul 16, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 21 squares of dimensional shingles on a pitch represented as | 2335 DARTMOUTH AVE, BOULDER |
Roofing and exterior | Jul 16, 2026 | 1 | Under $250,000 |
| This is an existing building being remodeled to a memory care facility. These are wet systems designed to NFPA 13. | 2529 4TH ST, BOULDER |
Major renovation | Jul 16, 2026 | 1 | Under $250,000 |
| Install 6.72kW roof mounted solar PV system with 27kWh Tesla Powerwall Energy Storage System | 4168 SAINT LUCIA ST, BOULDER |
Electrical | Jul 16, 2026 | 1 | Under $250,000 |
| COMCAST PROPOSES TO PROOF AND PULL 50 FT TO INSTALL NEW FIBER OPTIC CABLE INTO EXISTING CONDUIT TO PROVIDE SERVICE TO 2845 VALMONT RD, BOULD | 2845 VALMONT RD, BOULDER |
Roofing and exterior | Jul 16, 2026 | 1 | Under $250,000 |
| Upgrade service from 150 amps to 320 amps on exterior of south side of house | 900 MAXWELL AVE, BOULDER |
Electrical | Jul 16, 2026 | 1 | Under $250,000 |
| remove and replace furnace and AC with furnace and heat pump 60k 3 ton **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCE | 4435 HASTINGS DR, BOULDER |
Mechanical | Jul 16, 2026 | 1 | Under $250,000 |
| 3 TON ELECTRIC HEAT PUMP INSTALLATION REPLACING AN EXISTING GAS FURNACE. THE GAS LINE WILL BE CAPPED AT THE REMOVED FURNACE LOCATION. NEED T | 4898 BRANDON CREEK DR, BOULDER |
Mechanical | Jul 16, 2026 | 1 | Under $250,000 |
| 3 TON ELECTRIC HEAT PUMP INSTALLATION REPLACING AN EXISTING GAS FURNACE. THE GAS LINE WILL BE CAPPED AT THE REMOVED FURNACE LOCATION. NEED T | 910 36TH ST, BOULDER |
Mechanical | Jul 16, 2026 | 1 | Under $250,000 |
| New single zone mini split heat pump and associated electrical **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All n | 620 PEARL ST F, BOULDER |
Mechanical | Jul 16, 2026 | 1 | Under $250,000 |
| Installing ductless heat pump mini split system: 1-Mitsubishi MXZ-3D30NLHZ - Heat Pump 20 SEER2, 11.5 EER2, 10 HSPF2 3-Indoor wall mounted u | 3795 SILVER PLUME LN, BOULDER |
Mechanical | Jul 16, 2026 | 1 | Under $250,000 |
| 92? long sewer service repairs in the yard to tap in the street install dual sweep clean outs 8? deep 20?x3? street cut 10? deep **contracto | 2639 SPRUCE ST, BOULDER |
Plumbing | Jul 16, 2026 | 1 | Under $250,000 |
| sewer repair in backyard | 740 POPLAR AVE, BOULDER |
Plumbing | Jul 16, 2026 | 1 | Subscribers |
| Replacing 2.5 ton 13 seer ac and coil / 90% 60 MBTUH gas furnace **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All | 2800 E AURORA AVE 307, BOULDER |
Mechanical | Jul 16, 2026 | 1 | Under $250,000 |
| Cleanout installation in front yard (depth up to 10ft); in yard only sewer repair | 609 LINDEN PARK DR, BOULDER |
Plumbing | Jul 16, 2026 | 1 | Subscribers |
| Emergency Call 07/10 to repair damaged duct & damaged copper. Pends hard surface restoration. Asphalt 11'x5 in asphalt. MC-7273 **contractor | 2008 PEARL ST, BOULDER |
Mechanical | Jul 16, 2026 | 1 | Under $250,000 |