| FOUNDATION APPLICATION REF# COM-NEW-26-000003 | 110 VERNON ST, HARTFORD, CT 06106, HARTFORD |
Other | Jul 29, 2026 | 3 | $250,000 to $1 million |
| EMERGENCY Install Rheem 50-Gallon Standard Medium Electric 9-Year Warranty tank type water heater, SKU 1001301855, Model XE50M09EL55U1 | 147 COLBY ST, HARTFORD, CT 06106, HARTFORD |
Electrical | Jul 28, 2026 | 1 | Under $250,000 |
| Demo the back half of the building of all 6 units (living room, kitchen, bathroom) and the back porch | 57 MADISON AV, HARTFORD, CT 06106, HARTFORD |
Demolition | Jul 28, 2026 | 1 | Under $250,000 |
| Repipe of broken water lines using 3/4" pex | 84 STERLING ST, HARTFORD, CT 06112, HARTFORD |
Other | Jul 27, 2026 | 1 | Under $250,000 |
| Replace and install new shower valve. BLDG-CASE-26-000394 | 112 IRVING ST, #2ND, HARTFORD, CT 06112, HARTFORD |
Other | Jul 27, 2026 | 1 | Under $250,000 |
| A.O. Smith GPVL 50 200 natural gas water heater replacement | 99 TREDEAU ST, HARTFORD, CT 06114, HARTFORD |
Plumbing | Jul 27, 2026 | 1 | Under $250,000 |
| Remove the existing rooftop package unit and properly dispose of it. Install a new rooftop unit in the existing location and the same size u | 754 MAPLE AV, HARTFORD, CT 06114, HARTFORD |
Electrical | Jul 27, 2026 | 1 | Under $250,000 |
| Installing new navien combination gas boiler (NCB 190/80H) new gas line, thermostat, auto feeder, back flow isolation valves, and all safeti | 60 GILMAN ST, HARTFORD, CT 06114, HARTFORD |
Plumbing | Jul 27, 2026 | 1 | Under $250,000 |
| Emergency replacement of a 100 amp overhead service due to major corrosion causing electrical issues. CRS# 280 14 619 | 182 CORNWALL ST, HARTFORD, CT 06112, HARTFORD |
Electrical | Jul 27, 2026 | 1 | Under $250,000 |
| Computer and phone low voltage cabling on the basement and 5th floors | 85 JEFFERSON ST, HARTFORD, CT 06106, HARTFORD |
Other | Jul 27, 2026 | 1 | Under $250,000 |
| Selective interior demolition in preparation for a new Catholic Academy fit-out. | 765 ASYLUM AV, HARTFORD, CT 06105, HARTFORD |
Demolition | Jul 27, 2026 | 1 | $250,000 to $1 million |
| Install three (3) new branch circuits from the existing basement electrical panel to the third-floor apartment using exterior conduit method | 21 GLENDALE AV, HARTFORD, CT 06106, HARTFORD |
Electrical | Jul 27, 2026 | 1 | Under $250,000 |
| Run new dedicated circuit outlet for sump pump and battery pack. REF: MISC-PLM-26-000229 | 14 ACTON ST, HARTFORD, CT 06120, HARTFORD |
Other | Jul 27, 2026 | 1 | Under $250,000 |
| Run new dedicated circuit outlet for sump pump and battery pack. REF: MISC-PLM-26-000149 | 38 SOUTH ST, HARTFORD, CT 06114, HARTFORD |
Other | Jul 27, 2026 | 1 | Under $250,000 |
| Run new dedicated circuit outlet for sump pump and battery pack. REF: MISC-PLM-25-000829 | 119 KENT ST, HARTFORD, CT 06112, HARTFORD |
Other | Jul 27, 2026 | 1 | Under $250,000 |
| install bi level water fountain, install service sink, replace bathroom shop sink , cap existing drain in warehouse space. REF: COM-ALT-26-0 | 75 AIRPORT RD, HARTFORD, CT 06114, HARTFORD |
Other | Jul 27, 2026 | 1 | Under $250,000 |
| Add Sprinkler branch-lines and upright sprinkler heads per plans. Will add additional heads as needed if obstructions not observed are found | 75 AIRPORT RD, HARTFORD, CT 06114, HARTFORD |
Major renovation | Jul 27, 2026 | 1 | Under $250,000 |
| INSTALL OWNERS LOOP 1 METER 1 SOCKET 1 PANEL AND OWNER LOAD CRS#28080760 | 962 WETHERSFIELD AV, HARTFORD, CT 06114, HARTFORD |
Other | Jul 27, 2026 | 1 | Under $250,000 |
| TEMPORY SERVICE FOR SECURITY LIGHTS IN PARKING LOT. CRS# 278 72 833 | 80 BENTON ST, HARTFORD, CT 06114, HARTFORD |
Other | Jul 27, 2026 | 1 | Under $250,000 |
| REMOVE EXISTING BACK PORCH/ DECK ON 1ST FL, 2ND FL LEVEL ADD PROPER FOOTINGS AND BUILD NEW BACK PORCH / DECK WITH PRESSURE TREATED LUMBER AN | 283 BLUE HILLS AV, HARTFORD, CT 06112, HARTFORD |
Other | Jul 27, 2026 | 1 | Under $250,000 |
| BUILDING A NEW INNOVATION BUILDING | 110 VERNON ST, HARTFORD, CT 06106, HARTFORD |
New commercial construction | Jul 27, 2026 | 1 | $1 to $5 million |
| Install sound masking | 690 ASYLUM AV, #HO-1, HARTFORD, CT 06105, HARTFORD |
Other | Jul 27, 2026 | 1 | Under $250,000 |
| Interior renovation of existing space and getting it ready for a new Starbucks. | 200 BLOOMFIELD AV, #10, HARTFORD, CT 06117, HARTFORD |
Major renovation | Jul 27, 2026 | 1 | Under $250,000 |
| Interior renovation for a gift shop retail business. Work includes installation of slatwall display panels, retail shelving, display counter | 683 PARK ST, HARTFORD, CT 06106, HARTFORD |
Roofing and exterior | Jul 27, 2026 | 3 | Under $250,000 |
| WIRE POOL TIME CLOCK AND PLUGS | 315 SAYBROOKE ST, HARTFORD, CT 06106, HARTFORD |
Other | Jul 24, 2026 | 1 | Under $250,000 |
| REPLACE METER SOCKET, LOAD CENTER, 100AMP MANUAL DISCONNECT FOR BILLBOARD REPAIR. CRS# 275 73 401 | 1535 ALBANY AV, HARTFORD, CT 06112, HARTFORD |
Other | Jul 24, 2026 | 1 | Under $250,000 |
| Run new dedicated circuit outlet for sump pump and battery pack. REF: MISC-PLM-26-000334 | 49 AMHERST ST, HARTFORD, CT 06114, HARTFORD |
Other | Jul 24, 2026 | 1 | Under $250,000 |
| 17th Floor: APPROXIMATELY 1/3 OF THE FLOOR OF THE GOLD BUILDING IS BEING RENOVATED FOR EXISTING FLOOR TENANT, GORDON REES SCULLY MANSUKHANI. | 755 MAIN ST, HARTFORD, CT 06103, HARTFORD |
Demolition | Jul 24, 2026 | 1 | $250,000 to $1 million |
| Mammoth security will be upgrading the FACP in the building. We will be adding new smoke detectors throughout the building to bring up the b | 873 WEST BLVD, HARTFORD, CT 06105, HARTFORD |
Other | Jul 24, 2026 | 1 | Under $250,000 |
| Commercial rooftop installation of (337) 595w solar modules on KB racking grid connected with (3) 50kW inverters through 250A/480V CBOCP. | 76 NEW BRITAIN AV, HARTFORD, CT 06106, HARTFORD |
Roofing and exterior | Jul 24, 2026 | 1 | $250,000 to $1 million |