Minneapolis building permits
Recent permit activity in Minneapolis, Minnesota. Projects here are at least 30 days old; subscribers see new permits the day they are issued.
Partial coverage City of Minneapolis CCS permits (residential and commercial building, mechanical, electrical, plumbing, demolition...) with latitude/longitude, permit value (permit_Value) on only about 27% of permits (trade permits mostly carry 0); about two thirds of the volume is plumbing and mechanical permits, work type and comments.
Top project types
Recent permit activity
| Project | Where | Type | Issued | Permits | Value |
|---|---|---|---|---|---|
| METER MOVE Q2 - 2026 BATCH #7 | 2422 22ND ST E, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 2113 22ND ST E, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 2410 22ND ST E, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 2414 22ND ST E, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1766 DUPONT AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1931 DUPONT AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 2415 22ND ST E, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1808 DUPONT AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1929 DUPONT AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1779 DUPONT AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1900 DUPONT AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1787 DUPONT AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1776 DUPONT AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1812 DUPONT AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1801 DUPONT AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1807 DUPONT AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 2416 22ND ST E, Minneapolis | Plumbing | Jul 27, 2026 | 2 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1769 DUPONT AVE S #2, Minneapolis | Plumbing | Jul 27, 2026 | 2 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 2301 22ND ST E, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1772 DUPONT AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1916 COLFAX AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1924 COLFAX AVE S, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 1322 DOUGLAS AVE, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 2428 22ND ST E, Minneapolis | Plumbing | Jul 27, 2026 | 2 | Subscribers |
| METER MOVE Q2 - 2026 BATCH #7 | 2408 22ND ST E, Minneapolis | Plumbing | Jul 27, 2026 | 1 | Subscribers |
| REPAIR FOUNDATION - ABOUT 9-FEET Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED | 2423 DUPONT AVE N, Minneapolis | Major renovation | Jul 27, 2026 | 1 | Under $250,000 |
| CONSTRUCT/REPLACE STOOP AND STEPS ON FRONT OF EXISTING SFD. MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TRE | 5705 BLAISDELL AVE, Minneapolis | Major renovation | Jul 27, 2026 | 1 | Under $250,000 |
| (DMH-ProjectDox) INSTALL DRAINTILE ALONG NORTH WALL WITH SUMP BASKET & PUMP IN BASEMENT OF SFD. APPROVED PLANS AND PERMIT MUST BE ON SITE BE | 3712 16TH AVE S, Minneapolis | Major renovation | Jul 27, 2026 | 1 | Under $250,000 |
| CONSTRUCT 24'x20' DETACHED GARAGE - ONE-HOUR FIRE-RESISTANCE-RATED CONSTRUCTION REQUIRED AT WEST SIDE WALL (1.0'+ SETBACK). GUTTERS/DOWNSPOU | 2704 60TH ST W, Minneapolis | Other | Jul 27, 2026 | 1 | Under $250,000 |
| RE-ROOF FLAT ROOF 2020 MSBC | 821 DOUGLAS AVE, Minneapolis | Roofing and exterior | Jul 27, 2026 | 1 | $250,000 to $1 million |
Free to browse: permits older than 30 days. New permits, the general contractor, the owner and the exact value are for subscribers.
- Drop a pin and choose a radius of up to 15 km (about 9 miles) around it (for example around Minneapolis)
- See new permits the day they are issued, with the general contractor, the owner and the exact value
- A daily alert for your area, by email or in the app
- No exclusivity: every subscriber sees the same permits
Permit data comes from official county and city sources. Dates and values are as the source reports them.
Minneapolis: Source: City of Minneapolis, CCS Permits (opendata.minneapolismn.gov). Licence: Creative Commons CC0 waiver by the City of Minneapolis ('has waived all copyright and related or neighboring rights to Open Data', ArcGIS item licenseInfo; map data disclaimer applies). Terms