| CHANGE OUT 2.5 TON SPLIT SYSTEM 10 KW HEAT STRIPS, NO DUCTWORK | 788 BONAIRE RD, WM |
Mechanical | Jul 13, 2026 | 1 | Subscribers |
| WITHDRAWN PERMIT/Install water softener and reverse osmosis systems. | 2072 WHISKEY BRANCH DR, WM |
Plumbing | Jul 13, 2026 | 1 | Subscribers |
| CHANGE OUT 2 TON SPLIT SYSTEM 5 KW HEAT STRIPS; NO DUCTWORK | 1853 NEWKIRK RD, WM |
Mechanical | Jul 13, 2026 | 1 | Subscribers |
| Install (1) 26kw Kohler Generator. Install (2) 200amp Automatic Transfer Switches. Install approx. 80' of Electrical Feed from Generator to | 6501 S RIVER VISTA DR, WM |
Electrical | Jul 13, 2026 | 2 | Subscribers |
| install 65' of 3/4" CSST fuel line from NG meter through crawlspace to 30,000BTU dryer, 100,000BTU range, 30,000BTU logs and stub for future | 1414 BEXLEY DR, WM |
Mechanical | Jul 13, 2026 | 2 | Subscribers |
| Replacement of a 20amp receptacle, installation of a small junction box, and installation of A/C whip in flex | 627 VALLIE LN, WM |
Electrical | Jul 13, 2026 | 1 | Subscribers |
| Replacing parts on EV Pedestal. | 1625 S 17TH ST, WM |
Electrical | Jul 13, 2026 | 1 | Subscribers |
| Changeout 1.5 ton split system heat pump with 5 KW heat strip | 1621 S MOORINGS DR, WM |
Mechanical | Jul 13, 2026 | 1 | Subscribers |
| Changeout 4.0 ton split system heat pump with 10 KW heat strip | 641 JENOA LOOP, CH |
Mechanical | Jul 13, 2026 | 1 | Subscribers |
| REPLACE 3 TON SPLIT SYSTEM - NO DUCTWORK - SAME SIZE - SAME LOCATION | 2615 WHITE RD, WM |
Mechanical | Jul 13, 2026 | 1 | Subscribers |
| Changeout 24K BTU mini split in garage/frog | 323 WIREGRASS RD, WM |
Mechanical | Jul 13, 2026 | 1 | Subscribers |
| FLOOD//Change out walkin cooler condensing unit. | 38 N LUMINA AV, WB |
Electrical | Jul 13, 2026 | 2 | Subscribers |
| Replace (2) 3 Ton Split Heat Pump including 10 KW Heat Strips | 311 LONICERA CT, WM |
Mechanical | Jul 13, 2026 | 1 | Subscribers |
| Changeout 2.5 ton split system heat pump with 8 KW heat strip | 1929 LUNAR LN, WM |
Mechanical | Jul 13, 2026 | 1 | Subscribers |
| Install 4 helical piers | 5925 WISHING WELL LN, WM |
Other | Jul 13, 2026 | 1 | Under $250,000 |
| Installing Trane 2.5 Ton 14 SEER split system heat pump & air handler w/ 5 kw heat kit (LIKE FOR LIKE CHANGEOUT) | 2206 PARHAM DR, WM |
Mechanical | Jul 13, 2026 | 1 | Subscribers |
| Install 1 box drain, 370 sq ft crawlseal for walls , 15 CrawlSeal Wrap Piers, 1 electrical outlet (the dehumidiifer is prexisting) | 3701 AMBER DR, WM |
Major renovation | Jul 13, 2026 | 1 | Under $250,000 |
| **HOLD - NEEDS TO ADD MECH CONTRACTOR AND SCOPE FOR DUCTWORK** Convert existing screen room into unconditioned sunroom. add electric to code | 1604 GOOSE LANDING CIR, WM |
Other | Jul 13, 2026 | 1 | Under $250,000 |
| Obrien/Meade to change out 2.5 ton HP Package unit w/ 8 kw BTU heater. | 2434 MONROE ST, WM |
Mechanical | Jul 13, 2026 | 1 | Subscribers |
| SFR, LOT #298 | 4321 ROUGH STALK LN, CH |
Other | Jul 13, 2026 | 1 | Under $250,000 |
| FLOODPLAIN/Resecuring oceanside middle and upper deck. | 1311 S LAKE PARK BLVD, CB |
Other | Jul 13, 2026 | 1 | Under $250,000 |
| Installing backflow preventer on irrigation system | 1345 REGATTA DR, WM |
Plumbing | Jul 13, 2026 | 1 | Subscribers |
| New Construction Single Family | 4113 MARITIME WAY, WM |
Other | Jul 13, 2026 | 1 | $250,000 to $1 million |
| Remove existing HVAC and install new 2-ton 18 SEER2 variable-speed heat-pump split system with matching air handler, electric heat kit, ther | 411 ANCHOR WAY, KB |
Mechanical | Jul 13, 2026 | 1 | Subscribers |
| Converting existing church to commercial restaurant/bar and residential apartment rentals. | 1201 CASTLE ST, WM |
Major renovation | Jul 13, 2026 | 1 | $250,000 to $1 million |
| remove existing 27' round above ground pool with 52" wall height and replace with new pool of same dimensions | 334 CLAIRE WOOD CT, WM |
Other | Jul 13, 2026 | 1 | Subscribers |
| FLOODPLAIN__Selective demo and repair | 310 N COLLEGE RD, WM |
Major renovation | Jul 13, 2026 | 1 | $1 to $5 million |
| FLOODPLAIN / MISCELLANEOUS INTERIOR ALTERATIONS TO ADD COFFEE BAR & DELI TO EXISTING GROCERY STORE, INCLUDING UTILITY SERVICES TO SERVE NEW | 214 CAPE FEAR BLVD, CB |
Major renovation | Jul 13, 2026 | 1 | $250,000 to $1 million |
| FLOODPLAIN / Installation of new sewer line and water line for the downstairs bathroom | 1671 CANADY RD, WM |
Plumbing | Jul 13, 2026 | 2 | Subscribers |
| Upfit to existing building to include installation of operable partition, new offices and slight alterations to mechanical, electrical, and | 3147 S 17TH ST, WM |
Major renovation | Jul 13, 2026 | 3 | $1 to $5 million |