| change-out (one) 3 Ton PKG heat pump "like for like" 10kw | 3817 ASHLEY CIR, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| Emergency Permit to replace damaged meter & riser 100 amp service | 1504 S 3RD ST, WM |
Electrical | Jun 10, 2026 | 1 | Subscribers |
| REPLACE 2.5 TON SPLIT HEAT PUMP - NO DUCTWORK - SAME SIZE - SAME LOCATION | 7404 DACHSHUND CT, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| EMERGENCY OCCUPIED REPLACE METER PANEL COMBO 200 AMP UNDERGROUND | 910 DICKENS DR, WM |
Electrical | Jun 10, 2026 | 1 | Subscribers |
| FLOODPLAIN/HVAC change out of a 2.5 ton split system, 10 KW's, 30,000 BTU | 323 FRIENDLY SHORES RD, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| Changeout Goodman 15SEER 2-ton Split System Quantity 1 Unit price $9,449.60 Total price $9,449.60 Includes all equipment, labor, materials & | 2704 S 17TH ST, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| HVAC change out of a 4 ton split system, 10 KW's, 48,000 BTU | 106 CHIMNEY LN, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| KYLE BARNELLO - Changeout of 2 ton split system with 7.5 kw heat kit. | 5000 MONCK CT, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| HVAC change out of a 2 ton package system, 5 KW's, 24,000 BTU | 1420 NUN ST, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| FLOODPLAIN - KYLE BARNELLO - Changeout of 3 ton split system with 7.5kw heat strips. | 17 COMBER RD, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| Replace subpanel inside. | 1214 MILTON PL, WM |
Electrical | Jun 10, 2026 | 1 | Subscribers |
| Total re-pipe of water distribution from poly butylene water lines to replace with 3/4" pex through out the house with 3 baths | 204 GREGORY RD, WM |
Plumbing | Jun 10, 2026 | 1 | Subscribers |
| Replace 2 Ton Split Heat Pump including 5 KW Heat Strip | 5309 CHRISTIAN DR, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| Replace 2 ton split heat pump with 5 kw | 4131 WHITEHURST DR, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| Install level 2 ev charger replace outdoor a/c disconnect update ground rods install panel surge install hvac surge | 5325 LEISURE CIR, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| HVAC Equipment changeout 2 ton 5kw | 7226 COPPERFIELD CT, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| Installing whole home generator with (2) 200 amp ATS, (1) 200 amp ATS Load Center, CT Cabinet, and Meter Socket | 230 SUMMER REST RD, WM |
Electrical | Jun 10, 2026 | 2 | Subscribers |
| Michael and son HVAC - Install a 4 ton split heat pump system with 10KW electrical disconnect and reconnect needed - ODU - outside AHU - clo | 5401 PROSPERITY LN, CH |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| HVAC CHANGE OUT, REMOVE & REPLACE EXISTING SYSTEM. 2TON HP SPLIT,LOCATED IN CLOSET ON 1ST FLOOR, SERVICES 1& 2ND, RECONNECT ELECTRICAL | 403 HARPER AV, CB |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| Change out heat pump like for like | 2113 RANDOLPH RD, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| We are looking to replace the existing 420 sqft ground level deck with one of the same size, layout, and location. The deck is a detached gr | 4005 PROVIDENCE CT, WM |
Other | Jun 10, 2026 | 1 | Subscribers |
| Remove existing patio. Design & Build a treated 12' X 25' open deck with 5' steps to the back of the home. Foundation to code | 5478 EASTWIND RD, WM |
Other | Jun 10, 2026 | 1 | Subscribers |
| Like for like - change out - 2ton s/s hp w/5kw heaters. | 206 CABBAGE INLET LN, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| Complete demolition of a residential home | 30 SALTMEADOW RD, WM |
Demolition | Jun 10, 2026 | 1 | Subscribers |
| FLOODPLAIN/Upgrading generator for the Health & Human Services building which will include generator pad replacement, and sidewalk replaceme | 1650 GREENFIELD ST, WM |
Other | Jun 10, 2026 | 1 | Subscribers |
| REVISION: ADDRESS CHANGED TO 26 NEW BERN ST/ Install (2) plenums on each of the 2 ahus's. Plenum will be 30" long. Install (2) 25x20 filter | 26 NEW BERN ST, WM |
Mechanical | Jun 10, 2026 | 1 | Subscribers |
| New townhome (left side) | 2049 CONDOR RUN, WM |
Other | Jun 10, 2026 | 1 | $250,000 to $1 million |
| FLOODPLAIN/REVISION 08/11/2026:Project revised to all electric. Please remove the gas scope, contractor, and inspection requirements from th | 809 S FIFTH ST, CB |
Electrical | Jun 10, 2026 | 1 | $250,000 to $1 million |
| new sfr | 8824 CANOE BROOK CT, WM |
Other | Jun 10, 2026 | 1 | $250,000 to $1 million |
| Preservation Point on Lot 18 for Carolina Mountain to Coast Homes | 113 HOLLY BERRY CT, WM |
Other | Jun 10, 2026 | 1 | Subscribers |