| Install 7 Floor Support System (1-3'), 24 LN ft Supplemental Beam - S4 | 918 EWELL DR, WM |
Other | Jun 1, 2026 | 1 | Under $250,000 |
| change out like for like install a new 4-ton s/s HP, AHU & 10kw heater w/zoning | 654 MENTONE LN, WM |
Mechanical | Jun 1, 2026 | 1 | Subscribers |
| CHANGE OUT 2-TON SPLIT HEAT PUMP WITH 5 KW - NO DUCTWORK | 4216 JASMINE COVE WAY, WM |
Mechanical | Jun 1, 2026 | 1 | Subscribers |
| 30' x 75' High Peak tent, chairs and tables | 113 SWEETWATER DR, WM |
Other | Jun 1, 2026 | 1 | Subscribers |
| 2-STORY APARTMENT BUILDING R-2 (TYPE V-A) | 8253 E BLUE HERON DR, WM |
Other | Jun 1, 2026 | 1 | Subscribers |
| LINKED TO BLD PERMIT 26-00062 2-STORY APARTMENT BUILDING R-2 (TYPE V-A) | 8253 E BLUE HERON DR, WM |
Other | Jun 1, 2026 | 1 | Subscribers |
| LINKED TO BLD PERMIT 26-00063 / 2-STORY APARTMENT BUILDING R-2 (TYPE V-A) | 8253 E BLUE HERON DR, WM |
Other | Jun 1, 2026 | 1 | Subscribers |
| LINKED TO BLD PERMIT 26-00060 2-STORY APARTMENT BUILDING R-2 (TYPE V-A) | 8253 E BLUE HERON DR, WM |
Other | Jun 1, 2026 | 1 | Subscribers |
| 2-STORY APARTMENT BUILDING R-2 (TYPE V-A) | 8253 E BLUE HERON DR, WM |
Other | Jun 1, 2026 | 1 | Subscribers |
| 3-STORY APARTMENT BUILDING R-2 (TYPE V-A) | 8253 E BLUE HERON DR, WM |
Other | Jun 1, 2026 | 1 | Subscribers |
| Michael and son HVAC - Install a 2.5 ton split heat pump system - ODU - outside AHU - Closet | 403 S 6TH ST, WM |
Mechanical | Jun 1, 2026 | 1 | Subscribers |
| install 60 amp ev charging circuit | 2764 ALVERNIA DR, CH |
Other | Jun 1, 2026 | 1 | Subscribers |
| c/o of 2.5 ton 5kw package heat pump | 3112 BRAEMAR LN, WM |
Mechanical | Jun 1, 2026 | 1 | Subscribers |
| install 60 amp ev charging circuit | 6428 SHINN CREEK LN, WM |
Other | Jun 1, 2026 | 1 | Subscribers |
| New mini split installation | 41 PELICAN POINT RD, WM |
Mechanical | Jun 1, 2026 | 2 | Subscribers |
| REPLACE 3 TON 14.3 SEER SPLIT HEAT PUMP - NO DUCTWORK- SAME SIZE - SAME LOCATION | 609 STEELE LOOP, WM |
Mechanical | Jun 1, 2026 | 1 | Subscribers |
| New mini split wall hung. | 225 SEALANE WAY, KB |
Mechanical | Jun 1, 2026 | 2 | Subscribers |
| halo lit channel letters and non-lit dimensional letters on the building (Christina Rivenbark) | 4009 OLEANDER DR, WM |
Other | Jun 1, 2026 | 1 | Subscribers |
| Obrien to change out 4 ton HP w/ variable AHU s/s w/ 10 kw btu heater. Replacing accessible ductwork in the attic | 4601 DEAN DR, WM |
Mechanical | Jun 1, 2026 | 1 | Subscribers |
| CHANGE OUT 3 OLD PANELBOARDS / DISCONNECTS TO NEW GEAR | 5115 NEW CENTRE DR, WM |
Electrical | Jun 1, 2026 | 1 | Subscribers |
| change out / replace 3.5 ton split system with 8 kw | 6138 INLAND GREENS DR, WM |
Mechanical | Jun 1, 2026 | 1 | Subscribers |
| new sfr | 8820 CANOE BROOK CT, WM |
Other | Jun 1, 2026 | 1 | $250,000 to $1 million |
| new sfr | 1312 PANDION DR, WM |
Other | Jun 1, 2026 | 1 | $250,000 to $1 million |
| new sfr | 8816 CANOE BROOK CT, WM |
Other | Jun 1, 2026 | 1 | $250,000 to $1 million |
| New tankless water heater. New natural gas piping to water heat, outdoor patio grill and fire feature, and conversion of existing DV firepla | 1116 LT CONGLETON RD, WM |
Mechanical | Jun 1, 2026 | 1 | Subscribers |
| We are building this project free of charge for the homeowner. The existing deck is unsafe. We will remove the existing deck and replacing i | 5416 MYRTLE GROVE RD, WM |
Other | Jun 1, 2026 | 1 | Subscribers |
| Installation of new Natural Gas piping to grill and outdoor fire feature. | 5022 DOCKSIDE DR, WM |
Mechanical | Jun 1, 2026 | 2 | Subscribers |
| Install 2272 sq ft CrawlSeal, 1 dehumidifier, 1 12 by 12 box drain | 4401 TOLLINGTON DR, WM |
Major renovation | Jun 1, 2026 | 1 | $250,000 to $1 million |
| Replace 3 ton 14.2 seer split heat pump system same size/location | 3225 AMBER DR, WM |
Mechanical | Jun 1, 2026 | 1 | Subscribers |
| NO PLANS / Replace bottom window sash in 2 bathrooms with safety glass | 505 S 5TH AV, WM |
Roofing and exterior | Jun 1, 2026 | 1 | Under $250,000 |