| RIVER LIGHTS PHASE VII ON LOT 1194 FOR CHARTER | 209 COASTAL DUNE CT, WM |
Other | May 19, 2026 | 1 | Subscribers |
| Remove the existing non-load bearing wall between the kitchen and living space to create a wider opening and frame to standards. Properly su | 603 MACON CT, WM |
Other | May 19, 2026 | 2 | Under $250,000 |
| Install an 11' x 24' fiberglass inground pool with 330 sq/ft of cement pool decking. The customer is installing pool-compliant fencing and d | 7514 DUVALL CT, WM |
Roofing and exterior | May 19, 2026 | 2 | Subscribers |
| **REVISED TO INCLUDE MOVING 2 RECEPTICLES AND REPLACE SOME INSULATION** Remove Load bearing wall install a 11' Cased opening | 3300 UPTON CT, WM |
Other | May 19, 2026 | 2 | Under $250,000 |
| New Plumbing Installation 12 Fixtures | 107 PARKWOOD DR, WM |
Plumbing | May 19, 2026 | 2 | Subscribers |
| Spa | 1403 S LAKE PARK BLVD, CB |
Other | May 19, 2026 | 1 | Subscribers |
| indoor pool | 1403 S LAKE PARK BLVD, CB |
Roofing and exterior | May 19, 2026 | 1 | Subscribers |
| Build off frame modular home with 8x44 shed porch 8x38 shed porch and 30x30 garage | 6920 MASONBORO SOUND RD, WM |
Other | May 19, 2026 | 1 | $250,000 to $1 million |
| Construct new 678 square foot ADU on the existing property | 7510 MYRTLE GROVE RD, WM |
Other | May 19, 2026 | 1 | Under $250,000 |
| Attic: Sister or replace damaged or broken rafters as needed ? Attic: Install collar ties throughout ? Attic: Install support studs for gabl | 803 S 7TH ST, WM |
Major renovation | May 19, 2026 | 3 | $250,000 to $1 million |
| Existing utility bathroom renovation: new shower, sink, washer/dryer hookup, flooring, etc. | 1208 42ND ST, WM |
Other | May 19, 2026 | 3 | Under $250,000 |
| FLOODPLAIN/Emergency equipment changeout meter and outside disconnect have failed due to corrosion | 413 S FORT FISHER BLVD, KB |
Electrical | May 19, 2026 | 2 | Subscribers |
| 2.5 TON SPLIT HEAT PUMP 8 KW | 233 N FORT FISHER BLVD, KB |
Mechanical | May 19, 2026 | 2 | Subscribers |
| addition on home | 1057 HEADWATER COVE LN, WM |
Major renovation | May 19, 2026 | 4 | $250,000 to $1 million |
| Meter replacement | 4902 POMPANO CT, WM |
Electrical | May 19, 2026 | 2 | Subscribers |
| AIRMAX HEATING AND COOLING INC - 2 TONS - Install 2.0 ton split heat pump system w/8kw and bath venting. | 215 SUMMER REST RD, WM |
Mechanical | May 19, 2026 | 4 | Under $250,000 |
| Shed 24x38 ***Not to be used as an accessory dwelling unit/have cooking appliances.** | 214 ROBERT E LEE DR, WM |
Other | May 19, 2026 | 2 | Under $250,000 |
| DEMAREST LANDING OUTDOOR POOL | 3016 SUNNYBRANCH DR, WM |
Roofing and exterior | May 18, 2026 | 1 | Subscribers |
| NHC FLI Body Art Stand Alone NONRESIDENTIAL at 3138 WRIGHTSVILLE AV | 3138 WRIGHTSVILLE AV, WM |
Other | May 18, 2026 | 1 | Subscribers |
| NHC FLI Public Swimming Pool Stand Alone NONRESIDENTIAL at 3763 MASON PORT DR | 3763 MASON PORT DR, WM |
Other | May 18, 2026 | 1 | Subscribers |
| RIVER LIGHTS MX-3 Lot 1A | 5116 QUIGLEY BLVD, WM |
Other | May 18, 2026 | 1 | Subscribers |
| NHC FLI Public Swimming Pool Stand Alone NONRESIDENTIAL at 4114 ECHO FARMS BLVD | 4114 ECHO FARMS BLVD, WM |
Other | May 18, 2026 | 1 | Subscribers |
| *EMERGENCY* Replace 200A 20-space outdoor meter/main combo, install new riser and entrance cable along with updated grounding and new breake | 306 PARKWAY DR, WM |
Electrical | May 18, 2026 | 1 | Subscribers |
| Fulford Heating and Cooling - Change Out - 3 Ton SHP w/10KW | 3310 BRAGG DR, WM |
Mechanical | May 18, 2026 | 1 | Subscribers |
| Michael and son Gas- adding to existing pre inspected gas line for pool heater - run new line from existing gas line ,underground, over to a | 406 WAYNE DR, WM |
Mechanical | May 18, 2026 | 1 | Subscribers |
| CHANGE OUT 2-TON SPLIT HEAT PUMP WITH 5 KW - NO DUCTWORK | 168 CHERAW CT, WM |
Mechanical | May 18, 2026 | 1 | Subscribers |
| HOOKING UP TESLA WALL CHARGER | 7914 OLDE POND RD, WM |
Other | May 18, 2026 | 1 | Subscribers |
| install wall mount 9k minisplit in converted sunroom. | 3105 JOE WHEELER DR, WM |
Mechanical | May 18, 2026 | 1 | Subscribers |
| Change out 7.5kw ah..2,5 ton hp zoned system **AND CHANGE OUT SOME OF THE DUCTWORK** | 3850 SWEETBRIAR RD, WM |
Mechanical | May 18, 2026 | 1 | Subscribers |
| replace existing 5 ton split system heat pump | 5041 DOCKSIDE DR, WM |
Mechanical | May 18, 2026 | 1 | Subscribers |