| HVAC changeout of split system with new duct work and zoning. | 6409 BERRIDGE DR, WM |
Mechanical | Mar 25, 2026 | 1 | Subscribers |
| Changeout of 3 Ton Gas Pack. 80,000 BTU Heater Max. | 5318 WRIGHTSVILLE AV, WM |
Mechanical | Mar 25, 2026 | 1 | Subscribers |
| FLOODPLAIN / Addition of 9 solar modules on the roof with conductors running to existing inverter. | 6428 RIVER VISTA DR, WM |
Mechanical | Mar 25, 2026 | 1 | Subscribers |
| Enhance broadband connectivity with the installation and replacement of antennas, cables, radios, cabinets, and a generator with pad to an e | 114 BURKE AV, WM |
Other | Mar 25, 2026 | 2 | Subscribers |
| Bedroom and Bathroom remodel - enlarging bathroom and closet in downstairs "owners den/bedroom" | 434 SEMMES DR, WM |
Other | Mar 25, 2026 | 4 | Under $250,000 |
| NEED SIGNED PLURIS FINAL BEFORE CO - Construction of single-family home | 8794 SIDBURY RD, WM |
Other | Mar 25, 2026 | 1 | $250,000 to $1 million |
| Minor Renovation Convert existing screen room into unconditioned sunroom. add electric to code in sunroom walls. No change to home footprint | 388 GLENN ELLEN DR, WM |
Other | Mar 25, 2026 | 2 | Under $250,000 |
| roof and patio extension at front entry porch - roughly 5'-6". Letter front engineer attached | 2101 AINSDALE CT, WM |
Other | Mar 25, 2026 | 1 | Under $250,000 |
| Install Inground Swimming Pool | 1408 SPOT LN, CB |
Other | Mar 25, 2026 | 2 | Under $250,000 |
| Construction of single-family home | 5222 FOLKLORE WAY, WM |
Other | Mar 25, 2026 | 1 | $250,000 to $1 million |
| Install Inground Swimming Pool | 6230 MALLARD DR, WM |
Other | Mar 25, 2026 | 2 | Under $250,000 |
| Install new 200 amp meter and panel for food truck | 2241 CAROLINA BEACH RD, WM |
Electrical | Mar 25, 2026 | 2 | Subscribers |
| FLOODPLAIN / NO PLANS / Remove/replace several floor joists in kitchen area, repair/replace girder in kitchen area, replace subflooring in k | 4112 LOCKWOOD DR, WM |
Other | Mar 25, 2026 | 3 | Under $250,000 |
| Install one 24kw generator. Install 2 200amp Automatic Transfer Switches. Install Wiring to Subpanel. | 109 HOWARDS HILL, KB |
Electrical | Mar 25, 2026 | 3 | Subscribers |
| Install a gas line to a fireplace | 201 CENTRAL BLVD, WM |
Mechanical | Mar 25, 2026 | 2 | Subscribers |
| 1 sanidry sedona, 250sqft of silver glo, 1 smart sump, 975sqft of clean space, 118ft of sister joist, 880sqft of rim joist insulation, 2 ele | 3301 ASHLEY CIR, WM |
Major renovation | Mar 25, 2026 | 2 | Under $250,000 |
| NO PLANS/ This is a bathroom and kitchen renovation. There will be no changes to footprint of the building nor changes to load-bearing struc | 1901 BREWTON CT, WM |
Other | Mar 25, 2026 | 4 | Under $250,000 |
| general renovation including removal of load bearing walls | 261 DALLAS DR, WM |
Major renovation | Mar 25, 2026 | 3 | $250,000 to $1 million |
| We are looking to convert a section of the existing screened in porch into a sunroom. | 4716 WOODS EDGE DR, WM |
Other | Mar 25, 2026 | 3 | Under $250,000 |
| New construction, Single family home | 421 STARSHIP RUN, WM |
Other | Mar 25, 2026 | 2 | Under $250,000 |
| FLOODZONE/NO PLANS/** 01/12/2026 REVISION- Adding 18ft of Drop Beam Replacement, Reinstall of 16 existing crawlspace vents**1 smart sump, 18 | 1312 BURNETT RD, WM |
Major renovation | Mar 25, 2026 | 2 | $250,000 to $1 million |
| Change of service 200 a mp | 417 QUEEN ST, WM |
Electrical | Mar 25, 2026 | 2 | Subscribers |
| Port City Java Change of Ownership | 3301 MASONBORO LOOP RD, WM |
Other | Mar 24, 2026 | 1 | Subscribers |
| Restaurant and Coffee Cafe | 132 RACINE DR, WM |
Other | Mar 24, 2026 | 1 | Subscribers |
| Sound View - Year round pool permit | 712 SAINT JOSEPH ST, CB |
Other | Mar 24, 2026 | 1 | Subscribers |
| Cabana Main Pool | 222 N CAROLINA BEACH AV, CB |
Other | Mar 24, 2026 | 1 | Subscribers |
| FLOODPLAIN/like for like - Rooftop (x2) 5 Ton Package Units w 5kw | 9 S PAVILION AV, CB |
Mechanical | Mar 24, 2026 | 1 | Subscribers |
| Fulford Heating and Cooling - Install 35K BTU Mini Split in Kitchen | 7231 MARKET ST, WM |
Mechanical | Mar 24, 2026 | 1 | Subscribers |
| Change out / replace (1) 3 Ton 80k btu Gas package unit and change out / replace (2) 5 ton 100k btu gas package units | 1201 S 9TH ST, WM |
Mechanical | Mar 24, 2026 | 1 | Subscribers |
| New Accessory Metal Car Port Structure | 7990 MARKET ST, WM |
New commercial construction | Mar 24, 2026 | 1 | Under $250,000 |