| Kirkwood Wading Pool | 6400 BRADBURY CT, WM |
Other | Jan 30, 2026 | 1 | Subscribers |
| New construction, septic tank already installed. Looking to install well for primary water. | 117 EDGEWATER CLUB RD, WM |
Other | Jan 30, 2026 | 1 | Subscribers |
| Demo, haul and dispose of entire structure | 6341 GREENVILLE LOOP RD, WM |
Demolition | Jan 30, 2026 | 1 | Subscribers |
| Frame two walls to create office in existing space | 921 PRINCESS ST, WM |
Other | Jan 30, 2026 | 1 | Under $250,000 |
| FLOODPLAIN/NO PLANS//Kitchen Renovation framed storage enclosure protect water heater area | 104 GEORGIA AV, CB |
Other | Jan 30, 2026 | 1 | Under $250,000 |
| Add or replace antennas, ancillary equipment and ground equipment as per plans for an existing carrier on an existing wireless communication | 1314 MARSTELLAR ST, WM |
Other | Jan 30, 2026 | 1 | Subscribers |
| New Construction Single Family Home | 5600 CORAL TIDE AV, WM |
Other | Jan 30, 2026 | 1 | $250,000 to $1 million |
| Change out 10 Ton Gas Pack located on Roof. 150 MBH Heating Capacity | 5130 NEW CENTRE DR, WM |
Mechanical | Jan 30, 2026 | 1 | Subscribers |
| prebuilt 10x16 utility shed delivered to site - no electrical | 912 CHERYL LN, WM |
Electrical | Jan 30, 2026 | 1 | Subscribers |
| Replacing breakers due to age and compatibility | 306 SPARTAN RD, WM |
Electrical | Jan 30, 2026 | 1 | Subscribers |
| Inspect.meter power co said been over a year since a meter was there needs to be inspected | 8840 MARKET ST, WM |
Electrical | Jan 30, 2026 | 1 | Subscribers |
| FLOODPLAIN__applying to reinstate expired permit # 25-032137 change out 1.5 ton split system with 5kw heat strips | 7916 BONAVENTURE DR, WM |
Mechanical | Jan 30, 2026 | 1 | Subscribers |
| Install (1) 2 ton Heat pump. To include all necessary duct transitions. | 3200 SHADOW CT, WM |
Mechanical | Jan 30, 2026 | 1 | Subscribers |
| Replacing 2.5-ton heat pump like-for-like. Nominal cooling capacity 30,000 BTU. Nominal heating capacity 30,000 BTU (2.5-ton heat pump) and | 3408 RED BERRY DR, WM |
Mechanical | Jan 30, 2026 | 1 | Subscribers |
| Install electric conduit, wire, circuit breaker, and labor associated with the installation of a home EV charger (EVSE) in accordance with N | 4404 TOLLINGTON DR, WM |
Electrical | Jan 30, 2026 | 1 | Subscribers |
| Install electric conduit, wire, circuit breaker, and labor associated with the installation of a home EV charger (EVSE) in accordance with N | 5248 MASONBORO HARBOUR DR, WM |
Electrical | Jan 30, 2026 | 1 | Subscribers |
| replacing one 20 ton hp with 15kw of heat for the fellowship hall and one 5 ton a/c only in the kitchen | 14 PARTRIDGE RD, WM |
Mechanical | Jan 30, 2026 | 1 | Subscribers |
| Removing existing tub/shower insert, moving tub drain to accommodate a center drain free standing tub with tub filler. | 225 S FRONT ST, WM |
Plumbing | Jan 30, 2026 | 1 | Subscribers |
| Replace 2.5 ton hvac split system | 713 DUCK DOWNE CT, WM |
Mechanical | Jan 30, 2026 | 1 | Subscribers |
| Obrien/ Change out like for like 2 ton s/s w/ variable AHU and 5kw heaters. | 504 AUSTIN PT, WM |
Mechanical | Jan 30, 2026 | 1 | Subscribers |
| General Bathroom Alteration, we are not adding any sq ft to the home, just closing walls for a bathroom alteration. | 403 DOCK ST, WM |
Plumbing | Jan 30, 2026 | 2 | Under $250,000 |
| add 50 amp circuit for Hot tub | 4733 TUPELO DR, WM |
Electrical | Jan 30, 2026 | 1 | Subscribers |
| replace 2 ton split system heat pump with 5kW heat strips with 2 ton split system heat pump with 5kW heat strips. | 7411 N PROMONTORY CT, WM |
Mechanical | Jan 30, 2026 | 1 | Subscribers |
| We will remove the existing system and install a 5 ton RunTru (by Trane) 15 SEER2 variable speed system. The supply trunk duct for the downs | 233 GRAND CHAMPION RD, WM |
Mechanical | Jan 30, 2026 | 1 | Subscribers |
| change out 2.5 ton heat pump and matching air handler with 10 kw heat strips serves the upstairs. | 5500 ANDREWS REACH LOOP, WM |
Mechanical | Jan 30, 2026 | 1 | Subscribers |
| change out like for like install a new 4-ton s/s HP, AHU & 10kw | 320 MOTTS FOREST RD, WM |
Mechanical | Jan 30, 2026 | 1 | Subscribers |
| Changeout bonus room 9K BTU mini split | 6443 CHALFONT CIR, WM |
Mechanical | Jan 30, 2026 | 1 | Subscribers |
| Installation of a 3 stop residential elevator into an existing shaft. All mechanicals will be plugged into existing wires. | 1117 BONITO LN, CB |
Electrical | Jan 30, 2026 | 1 | Subscribers |
| **VOID-PER CONTRACTOR REQUEST* Michael and son Electrical - Install a 30amp portable generator back feed breaker with interlock kit and gene | 249 ISLAND CREEK DR, WM |
Electrical | Jan 30, 2026 | 1 | Subscribers |
| VOID - CONTRACTOR CHANGE//HVAC install | 3 S KERR AV, WM |
Mechanical | Jan 30, 2026 | 1 | Subscribers |