| Re-plumbing all the water lines in the home. Home had polybutylene water lines that we are removing and installing Pex A. This includes new | 322 OAKLAND DR, WM |
Plumbing | Sep 3, 2026 | 1 | Subscribers |
| Replace existing system with a 3Ton 10kw heat pump split system. | 6110 CHANCELLORSVILLE DR, WM |
Mechanical | Sep 3, 2026 | 1 | Subscribers |
| Replace the existing exterior V-shaped wooden staircases at 2503 and 2507 Flint Drive. Work includes removal and replacement of stair string | 2503 FLINT DR, WM |
Plumbing | Sep 3, 2026 | 1 | Under $250,000 |
| PUT IT WAS A 2.5 TON SPLIT HEAT PUMP - IT WAS A 2.5 TON PACKAGE UNIT/REPLACE 2.5 TON 13.2 SEER SPLIT HEAT PUMP - NO DUCTWORK - SAME SIZE - S | 305 TOUCH ME NOT DR, WM |
Mechanical | Sep 3, 2026 | 1 | Subscribers |
| new sfr townhouse | 1139 RODANTHE AV, CH |
Other | Sep 3, 2026 | 1 | Under $250,000 |
| -Crawlspace repairs designated by the engineer. -Repair framing above sunroom and -Repair any in-wall electrical if needed - Vanity cabinets | 1809 PERRY AV, WM |
Major renovation | Sep 3, 2026 | 1 | $250,000 to $1 million |
| FLOODPLAIN/Renovation of primary bathroom, including demolition of existing flooring, shower, and cabinets. Project includes the installatio | 2108 BOATSWAIN PL, WM |
Other | Sep 3, 2026 | 1 | Under $250,000 |
| FLOODPLAIN/Install a 14' 9" x 31' 10" fiberglass inground pool with 704 sq/ft of cement pool decking. The homeowner is modifying their exist | 904 TARPON DR, WM |
Other | Sep 3, 2026 | 1 | Under $250,000 |
| JAMES AND SON HEATING AND COOLING INC - CHANGE OUT ONLY THE SUPPLY TRUNK & ONE 6" R8 VALUE BATHROOM SUPPLY RUN, FURNISH ALL ASSOCIATED MATER | 3518 MASONBORO LOOP RD, WM |
Mechanical | Sep 3, 2026 | 1 | Subscribers |
| Install new crawlspace structural support system beneath an existing single-family residence. Work includes excavation for new concrete foot | 311 S 15TH ST, WM |
Major renovation | Sep 3, 2026 | 1 | Under $250,000 |
| 60x70 20x30 | 15 BRIDGE RD, WM |
Other | Sep 3, 2026 | 1 | Subscribers |
| FLOODPLAIN / Renovation including enclosure of ground floor excluding garage, installation of elevator, kitchen, all bathrooms, and installa | 2520 SHANDY LN, WM |
Major renovation | Sep 3, 2026 | 1 | $250,000 to $1 million |
| Installation of a 3 stop residential elevator into an existing shaft. All mechanicals will be plugged into existing wires. /WB# BLDR-003475- | 4 W COLUMBIA ST, WB |
Electrical | Sep 3, 2026 | 2 | Subscribers |
| Remove existing HVAC and install new 2-ton 16 SEER2 side-discharge multi-speed heat-pump split system with upgraded thermostat. No structura | 5329 LEISURE CIR, WM |
Mechanical | Sep 3, 2026 | 4 | Subscribers |
| Demolishing and rebuilding privacy wall surrounding 2012 Independece Blvd. Approximately 20 linear ft of wall section will be removed includ | 2012 INDEPENDENCE BLVD, WM |
Other | Sep 3, 2026 | 2 | Subscribers |
| ONE ROOM STUDY ADDITION 12X12 /Must not be an ADU | 4006 HALIFAX RD, WM |
Other | Sep 3, 2026 | 3 | Under $250,000 |
| Replace water main | 218 NAVAHO TRL, WM |
Plumbing | Sep 3, 2026 | 2 | Subscribers |
| INSTALLATION OF TANKLESS WATER HEATER | 2311 BELVEDERE DR, WM |
Mechanical | Sep 3, 2026 | 2 | Subscribers |
| 7.38 kW residential solar system to be installed on roof | 3753 STORMY GALE PL, CH |
Other | Sep 3, 2026 | 2 | Under $250,000 |
| FLOODPLAIN/Tenant upfit - no structural work. Shaded X Flood zone. | 6336 OLEANDER DR, WM |
Major renovation | Sep 3, 2026 | 3 | $250,000 to $1 million |
| HVAC change out of a 3.5 ton split system - 10 KW's - 40,000 BTU | 3405 KIRBY SMITH DR, WM |
Mechanical | Sep 3, 2026 | 2 | Subscribers |
| KB PERMIT 260005 - NEW HOUSE/New plumbing for 4 1/2 bathrooms, (2) bar sinks, kitchen, water heaters, and sewer and water install | 521 KURE VILLAGE WAY, KB |
Plumbing | Sep 3, 2026 | 4 | Subscribers |
| addition off rear of house including family room, dining room, office, laundry, and porch. closet addition off master suite. | 5014 DOCKSIDE DR, WM |
Major renovation | Sep 3, 2026 | 5 | $250,000 to $1 million |
| **FLOODPLAIN** Like for like replacement of 2.5 Ton Split System HP w/8 KW Heat Kit. | 12 SEAGULL ST, WB |
Mechanical | Sep 3, 2026 | 2 | Subscribers |
| FLOODPLAIN/change out like for like install a new 3-ton s/s HP, AHU & 8kw heater | 8 SEAGULL ST, WB |
Mechanical | Sep 3, 2026 | 2 | Subscribers |
| REPLACE 2.5 TON HVAC SPLIT SYSTEM | 305 SILKWEED CT, WM |
Mechanical | Sep 3, 2026 | 2 | Subscribers |
| Added a dehumidifier circuit and sump pump circuit. | 3919 APPLETON WAY, WM |
Electrical | Sep 3, 2026 | 4 | Subscribers |
| Milam Plumbing: 17 fixtures to code, using existing water and sewer no backflow | 1527 RADIAN RD, WM |
Plumbing | Sep 3, 2026 | 6 | $1 to $5 million |
| ADDITION/RENOVATION: To lift the house to place onto a slab foundation, replace doors and windows, remove existing stucco chimney, install n | 1705 CHESTNUT ST, WM |
Mechanical | Sep 3, 2026 | 2 | $250,000 to $1 million |
| Like for like replacement of 1.5 Ton Straight AC System w/5 KW Heat Kit. | 5364 NEW CENTRE DR, WM |
Mechanical | Sep 3, 2026 | 5 | Subscribers |