| change out (two) split system heat pumps. DOWNstairs - (1) 4 Ton s/s heat pump "like for like"10kw AND UPstairs: (1) 2 Ton s/s heat pump "li | 2011 PEMBROKE JONES DR, WM |
Mechanical | Aug 26, 2026 | 1 | Subscribers |
| FLOODPLAIN / Rooftop installation of 34 solar panels. Installing one Tesla Powerwall 3, ATS and all conductors and raceways per NEC. Temp po | 5799 MARSHVIEW DR, WM |
Mechanical | Aug 26, 2026 | 1 | Under $250,000 |
| Installation of 1 non-electrical freestanding monument sign. | 3142 WRIGHTSVILLE AV, WM |
Electrical | Aug 26, 2026 | 1 | Subscribers |
| New Deck | 2024 METTS AV, WM |
Other | Aug 26, 2026 | 1 | Under $250,000 |
| new hot tub/Hot tub is outside of the Special Flood Hazard Area | 118 CASTLE COVE LN, CH |
Other | Aug 26, 2026 | 1 | Under $250,000 |
| Installing a new clearance bar in drive-thru area. For( StarBucks on s 16th.) | 2018 S 16TH ST, WM |
Other | Aug 26, 2026 | 1 | Subscribers |
| NOVANT HEALTH SCOTTS HILL - ED CT | 109 SCOTTS HILL MEDICAL DR, WM |
Major renovation | Aug 26, 2026 | 1 | $1 to $5 million |
| DSW Shoes Tenant Improvement | 5060 NEW CENTRE DR, WM |
Major renovation | Aug 26, 2026 | 1 | $1 to $5 million |
| 5,000 sf wedding event venue - "Milo Events" | 4907 RIVER RD, WM |
New commercial construction | Aug 26, 2026 | 1 | $250,000 to $1 million |
| 200 amp panel relocation | 5118 HUNTERS TRL, WM |
Electrical | Aug 26, 2026 | 2 | Subscribers |
| Install 1 steel skid with 2 180 kw ev chargers 1 60 kw inverter with 60 kw B.E..S.S. steel bollards are already part of 6000lb plus steel sk | 2238 S 17TH ST, WM |
Other | Aug 26, 2026 | 3 | Subscribers |
| install level 2 ev charger | 7304 FLINTROCK CT, WM |
Other | Aug 26, 2026 | 1 | Subscribers |
| Install (3) Additional Receptacles for the Shaka Shack Building in Areas Specified on Layout. (Two on "high wall" & One on "Low Wall") | 1360 BRIDGE BARRIER RD, CB |
Electrical | Aug 26, 2026 | 2 | Subscribers |
| Enclose existing deck with small footprint | 2005 WRIGHTSVILLE AV, WM |
Other | Aug 26, 2026 | 3 | Under $250,000 |
| D. O'Brien/Meade - Change out, like for like - Installing a 2.5-ton HP w/ a variable AHU and 8KW heat strips. | 1710 OAKLEY RD, CH |
Mechanical | Aug 26, 2026 | 3 | Subscribers |
| FLOODPLAIN/c/o of 1.5 ton split system in closet | 300 SPENCER FARLOW DR, CB |
Mechanical | Aug 26, 2026 | 2 | Subscribers |
| replacing main indoor panel | 603 GUNSTON LN, WM |
Electrical | Aug 26, 2026 | 2 | Subscribers |
| Lp gas piping to new generator | 3404 GRAYLYN TER, WM |
Mechanical | Aug 26, 2026 | 2 | Subscribers |
| ALTERATION: NO SQUARE FOOTAGE ADDED. REMOVE B/R CLOSET AND ADD WALL IN BR TO MOVE AND RENOVATE EXISTING BATHROOM AND ADD LAUNDRY ROOM. REFRA | 1204 W BAY SIDE CIR, WM |
Major renovation | Aug 26, 2026 | 2 | Under $250,000 |
| Demo existing screenroom system. Furnish & Install a custom LivingSpace Sunroom 4' X 18' X 11' with no changes to the footprint of the home. | 711 BROOMSEDGE TER, WM |
Other | Aug 26, 2026 | 2 | Under $250,000 |
| FLOODPLAIN/HVAC change out 1.5 ton split heat pump, reconnect electrical, change breaker size, service ODU/whole home | 108 S LAKE PARK BLVD, CB |
Mechanical | Aug 26, 2026 | 3 | Subscribers |
| FLOODPLAIN/A b c building inspection for a restaurant , replacing another restaurant. Zoning has already reviewed,And fire has been contacte | 14 HARNETT ST, WM |
Other | Aug 26, 2026 | 3 | Under $250,000 |
| Install of new fire alarm system | 9010 SENCA DR, WM |
Other | Aug 26, 2026 | 6 | $1 to $5 million |
| SINGLE TRADE - Remove and replace roofing only. No structural work, only shingle roof replacement. | 1545 CAMERON CT, WM |
Roofing and exterior | Aug 26, 2026 | 206 | $1 to $5 million |
| NHC OSWP Well Permit Stand Alone NONRESIDENTIAL at 6426 WINDMILL WAY | 6426 WINDMILL WAY, WM |
Other | Aug 25, 2026 | 1 | Subscribers |
| TALBERT & BRIGHT OFFICES - ATC 31/66-10/02/2001 PERMIT TRANSFER | 4801 SHELLEY DR, WM |
Other | Aug 25, 2026 | 1 | Subscribers |
| RIVER LIGHTS PHASE VII ON LOT 7002 FOR BILL CLARK | 375 LONGHILL DR, WM |
Other | Aug 25, 2026 | 1 | Subscribers |
| RIVER LIGHTS PHASE VII LOT 998 FOR BILL CLARK | 5316 FOLKLORE WAY, WM |
Other | Aug 25, 2026 | 1 | Subscribers |
| ADDING SMALL SUBPANEL IN SHED, 50 AMPS. ADDING SOME OUTLETS, LIGHTING, SHOP VAC AND PRE-WIRE FOR FUTURE MINISPLIT | 521 BAYTREE RD, WM |
Electrical | Aug 25, 2026 | 1 | Subscribers |
| BRIAN WILLIAMSON - Replacing a 2 ton heat pump split system with 5KW heat strips | 1415 S LAKE PARK BLVD, CB |
Mechanical | Aug 25, 2026 | 1 | Subscribers |