| New 200 amp service | 136 SHOSHONE, BUFFALO |
Electrical | Mar 11, 2026 | 1 | Under $250,000 |
| remove a portion of the existing concrete front patio/walkway then begin excavating down roughly 5-6 feet to expose the trap. Once exposed w | 315 NORTH DR, BUFFALO |
Plumbing | Mar 11, 2026 | 1 | Under $250,000 |
| sanitary sewer repair | 36 DAKOTA, BUFFALO |
Plumbing | Mar 11, 2026 | 1 | Under $250,000 |
| SEWER REPAIR | 350 DAVEY, BUFFALO |
Plumbing | Mar 11, 2026 | 1 | Under $250,000 |
| adding two arch fought breakers and turn power back on.Acc't #LOWER 8275095271,#UPPER 8295095320 | 218 FRENCH, BUFFALO |
Electrical | Mar 11, 2026 | 1 | Under $250,000 |
| boiler swap | 64 HUNTINGTON, BUFFALO |
Mechanical | Mar 11, 2026 | 2 | Under $250,000 |
| Remove existing roofing down to the roof deck, Mechanically fasten two layers of insulation, install Carlisle .060 mil EPDM in adhesive. ins | 103 SYCAMORE, BUFFALO |
Mechanical | Mar 11, 2026 | 1 | Under $250,000 |
| 150 amp double meter service upgrade Esr 31301987 | 138 MILTON, BUFFALO |
Electrical | Mar 11, 2026 | 1 | Under $250,000 |
| bring second floor up to code | 50 NORTHUMBERLAND, BUFFALO |
Electrical | Mar 11, 2026 | 1 | Under $250,000 |
| Install 165 feet interior drainage and a sump pump | 52 ST JOHNS PL, BUFFALO |
Plumbing | Mar 11, 2026 | 2 | Under $250,000 |
| Interior remodel of the upper unit to include drywall finishing throughout the unit, painting of the entire unit. New interior doors and tri | 81 EAST, BUFFALO |
Roofing and exterior | Mar 11, 2026 | 2 | Under $250,000 |
| Fabricate and install and awning sign for the new restaurant at the Lafayette Hotel. This will be a wedge style awning with a center half ba | 391 WASHINGTON, BUFFALO |
Roofing and exterior | Mar 11, 2026 | 2 | Under $250,000 |
| Install new 90 kBTU high-efficiency furnace (SLP99-90) and 3-ton heat pump (EL19KP1-36) with associated coil and connections to existing duc | 986 FILLMORE, BUFFALO |
Mechanical | Mar 11, 2026 | 4 | Under $250,000 |
| Updates to existing rear wood framed deck and addition of a wood framed roof. ***Digeplan *** | 171 HIGHLAND, BUFFALO |
Major renovation | Mar 11, 2026 | 2 | Under $250,000 |
| TEAR OFF AND INSTALL NEW ROOF TO ALL SHINGLE AREAS OFHOUSE | 698 TACOMA, BUFFALO |
Roofing and exterior | Mar 10, 2026 | 1 | Under $250,000 |
| Replace 2 water heater in basement and one upper unit. | 2491 DELAWARE, BUFFALO |
Plumbing | Mar 10, 2026 | 1 | Under $250,000 |
| Changing/replacing DI in parking lot | 355 CHICAGO, BUFFALO |
Plumbing | Mar 10, 2026 | 1 | Under $250,000 |
| To an existing 2 story 2 family dwelling to repair basement walls by removing and replacing CMU blocks as describe on plans. &n | 39 KIMMEL, BUFFALO |
Major renovation | Mar 10, 2026 | 1 | Under $250,000 |
| sewer repair | 206 LEMON, BUFFALO |
Plumbing | Mar 10, 2026 | 1 | Under $250,000 |
| We will excavate at the house trap digging down to the pipe cutting and removing that section of pipe. We will inside saw cut and excavate t | 503 FARGO, BUFFALO |
Plumbing | Mar 10, 2026 | 1 | Under $250,000 |
| Reinforce foundation wall with 6 in steel beams *** Digeplan *** | 557 POTOMAC, BUFFALO |
Major renovation | Mar 10, 2026 | 1 | Under $250,000 |
| Furnace Replacement | 527 DARTMOUTH, BUFFALO |
Mechanical | Mar 10, 2026 | 1 | Under $250,000 |
| Install multiple structural beams at first floor ceiling and second floor ceiling as per plans. The plans include adding a helical pier to t | 443 LINWOOD AVE, BUFFALO |
Major renovation | Mar 10, 2026 | 1 | Under $250,000 |
| sewer repair | 119 SUMMIT, BUFFALO |
Plumbing | Mar 10, 2026 | 2 | Under $250,000 |
| Hung Sewer/ Laundry tub/pump & sump crock. | 1283 WEST, BUFFALO |
Plumbing | Mar 10, 2026 | 1 | Under $250,000 |
| Pipe in new grease trap to code | 1456 HERTEL, BUFFALO |
Plumbing | Mar 10, 2026 | 1 | Under $250,000 |
| Replace hot water tank - Martha Carter, (716) 316-8123 | 314 MAY, BUFFALO |
Plumbing | Mar 10, 2026 | 1 | Under $250,000 |
| Removing an 80% furnace and installing high efficiency furnace | 27 ROEBLING, BUFFALO |
Mechanical | Mar 10, 2026 | 1 | Under $250,000 |
| Repair trap and riser in front yard move | 80 BRADLEY, BUFFALO |
Plumbing | Mar 10, 2026 | 1 | Under $250,000 |
| Replace PVC pipe and trap | 75 LANCASTER, BUFFALO |
Plumbing | Mar 10, 2026 | 1 | Under $250,000 |