| To an existing 6 story office building replace damaged soffit in kind.<div><br></div><div>***work by owner***</div> | 135 DELAWARE, BUFFALO |
Other | Jan 7, 2026 | 1 | Under $250,000 |
| boiler swap | 73 ALSACE, BUFFALO |
Mechanical | Jan 7, 2026 | 1 | Under $250,000 |
| TO AN EXISTING 2 STORY 2 FAMILY DWELLING REMOVE REAR STAIRS GOING FROM LOWER DECK TO UPPER DECK AND ERECT NEW STAIRS TO THE REAR | 381 PROSPECT, BUFFALO |
Other | Jan 7, 2026 | 1 | Under $250,000 |
| Boiler install | 462 DELAVAN WEST, BUFFALO |
Mechanical | Jan 7, 2026 | 1 | Under $250,000 |
| Rewire kitchen and bathroom and repair some existing wiring | 38 ARDMORE, BUFFALO |
Electrical | Jan 7, 2026 | 1 | Under $250,000 |
| Wiring for Portable Generator Connection - ESR #31254747 | 81 WYOMING, BUFFALO |
Electrical | Jan 7, 2026 | 1 | Under $250,000 |
| furnace and ac | 1490 KENMORE, BUFFALO |
Mechanical | Jan 7, 2026 | 1 | Under $250,000 |
| Replacement of existing water service | 346 AMHERST ST, BUFFALO |
Plumbing | Jan 7, 2026 | 1 | Under $250,000 |
| Installing new 4" sanitary sewer from new home to main sewer in street | 66 O CONNELL, BUFFALO |
Plumbing | Jan 7, 2026 | 1 | Under $250,000 |
| sewer line repair approx 8ft | 30 RACE, BUFFALO |
Plumbing | Jan 7, 2026 | 1 | Under $250,000 |
| Swap 2 water heaters - 40 gallon gas. | 49 PLYMOUTH, BUFFALO |
Plumbing | Jan 7, 2026 | 1 | Under $250,000 |
| install new vinyl siding over existing on front and left side with all proper prep work, channels, finishes and trims to code. remove and in | 18 HARLOW, BUFFALO |
Roofing and exterior | Jan 7, 2026 | 1 | Under $250,000 |
| Wiring and installation of lighting, general purpose receptacles, specialized receptacles and 2 200Amp panels for new garage repair shop. | 1615 WILLIAM, BUFFALO |
Electrical | Jan 7, 2026 | 1 | Under $250,000 |
| Replace water heater with 40 gallon | 24 ADMIRAL, BUFFALO |
Plumbing | Jan 7, 2026 | 1 | Under $250,000 |
| SEWER REPAIR | 53 SAGE, BUFFALO |
Plumbing | Jan 7, 2026 | 1 | Under $250,000 |
| 2sq Partial roof replacement on upper REAR DORMER ONLY- tear off- replace plywood and install 3 part flintastic roofing | 163 EDEN, BUFFALO |
Roofing and exterior | Jan 7, 2026 | 1 | Under $250,000 |
| SEWER REPAIR | 35 ALBEMARLE, BUFFALO |
Plumbing | Jan 7, 2026 | 1 | Under $250,000 |
| Repair existing 3rd floor bathroom and kitchen plumbing and water tank | 155 CLEVELAND AVE, BUFFALO |
Plumbing | Jan 7, 2026 | 1 | Under $250,000 |
| R/R catch basin, tie in rain conductor | 1801 ELMWOOD, BUFFALO |
Plumbing | Jan 7, 2026 | 1 | Under $250,000 |
| Completion of work started by a previous contractor. Our scope includes only the installation of cabinetry, flooring finishes, trim, and pai | 710 POTOMAC, BUFFALO |
Electrical | Jan 7, 2026 | 1 | Under $250,000 |
| We will remove the sidewalk block and part of the apron 3x5’ we will dig down to the pipe 8’. We will cut and remove that section of pipe an | 38 CARLYLE, BUFFALO |
Plumbing | Jan 7, 2026 | 1 | Under $250,000 |
| Replace existing furnace. | 315 NORTHUMBERLAND, BUFFALO |
Mechanical | Jan 7, 2026 | 2 | Under $250,000 |
| Cabinet and counter replacement. New floor Home owner to demo and dispose | 34 DAKOTA, BUFFALO |
Demolition | Jan 7, 2026 | 2 | Under $250,000 |
| To an existing 2 story 1 family dwelling install New tile, fixtures. No structural work. No plumbing or electrical being moved.<div><br></di | 83 DANA, BUFFALO |
Electrical | Jan 7, 2026 | 3 | Under $250,000 |
| Installing a Ductless Heat Pump system in the house. One heat Pump and 5 indoor heads | 233 MASTEN, BUFFALO |
Mechanical | Jan 7, 2026 | 3 | Under $250,000 |
| repiping hungsewer going through basement wall outside hooking up to existing sewer | 1345 SOUTH PARK, BUFFALO |
Plumbing | Jan 6, 2026 | 1 | Under $250,000 |
| Full 11 sq tear off and install of IKO shingles including ice and water shield | 10 GORSKI, BUFFALO |
Other | Jan 6, 2026 | 1 | Under $250,000 |
| SEWER REPAIR | 108 LAIRD, BUFFALO |
Plumbing | Jan 6, 2026 | 1 | Under $250,000 |
| SEWER REPAIR | 59 ZITTEL, BUFFALO |
Plumbing | Jan 6, 2026 | 1 | Under $250,000 |
| Partial 1 sq tear off and install of EPDM on back porch only | 116 FRONTENAC, BUFFALO |
Other | Jan 6, 2026 | 1 | Under $250,000 |