| TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS A | 114 WEST 26 STREET, Manhattan |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAP | 4 SOUTH PORTLAND AVENUE, Brooklyn |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| A.INSTALL GAS ON EXISTING SERVICE FOR THE NEW KITCHEN EQUIPMENT & FURNACE ON FIRST FLOOR, AND HW TANK ON CELLAR. REMOVE EXISTING BATHROOM NO | 98-13 ASTORIA BOULEVARD, Queens |
Plumbing | Oct 2, 2026 | 1 | Under $250,000 |
| Structural work related to the renovation/conversion of existing residential building to a 1 family residence. | 107 WILLOW STREET, Brooklyn |
Major renovation | Oct 2, 2026 | 1 | Under $250,000 |
| Temporary platforms Advertising Week events in the vacant retail spaces. Removed at the end of the programing. No changes to existing struct | 110 WEST 33 STREET, Manhattan |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 | 900 SARATOGA AVENUE, Brooklyn |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF THE TEMPORARY FENCE AT 1599 SAINT JOHN'S PLACE, BROOKLYN, NY 11233 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE | 1599 SAINT JOHN'S PLACE, Brooklyn |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| Filing structural repairs as needed to existing parking garage as per plans. | 118-35 QUEENS BOULEVARD, Queens |
Other | Oct 2, 2026 | 1 | $250,000 to $1 million |
| PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE I | 1270 BROADWAY, Manhattan |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| PROPOSED OF STONE REPAIR, POINTING AND BACK SIDE WALL REPLACEMENT TO BE DONE AS NEEDED AS PER PLANS.NO CHANGE IN USE OCCUPANCY OR EGRESS UND | 341 EAST 146 STREET, Bronx |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY | 341 EAST 146 STREET, Bronx |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| PROPOSED NEW CURB CUT | 115-28 130 STREET, Queens |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| Modification of existing sprinkler system on partial 7th floor as per plans. | 444 12 STREET, Brooklyn |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| Modification of 1st floor retail space as shown on submitted plans. No change in occupancy, use or egress. | 810 FULTON STREET, Brooklyn |
Other | Oct 2, 2026 | 1 | $250,000 to $1 million |
| INSTALLATION OF DUCTLESS MINI SPLIT SYSTEM FOR HEATING AND COOLING AS PER PLANS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCY | 196-74 69 AVENUE, Queens |
Mechanical | Oct 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR E | 560 WEST 185 STREET, Manhattan |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| FO AND ST WORK FILED IN CONJUNCTION WITH ALT 1 UNDER B01313909-I1. RENOVATIONS WORK (LEGALIZING HORIZONTAL EXTENSION, EXPANSION OF HORIZONTA | 108 TROUTMAN STREET, Brooklyn |
Major renovation | Oct 2, 2026 | 1 | Under $250,000 |
| work includes per the filed plans waterproofing in cellar including grout injection of foundation walls, crack and spall repairs, floor pain | 201-02 53 AVENUE, Queens |
Roofing and exterior | Oct 2, 2026 | 1 | $1 to $5 million |
| work includes per the filed plans steel beam repair, concrete spall/crack repair, removal of cellar hoist hatch and infill concrete work at | 201-02 53 AVENUE, Queens |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 76 CHURCHILL AVENUE, Staten Island |
Roofing and exterior | Oct 2, 2026 | 1 | Under $250,000 |
| NEW STEEL LINTELS FOR PROPOSED ENLARGED OPENINGS IN THE EXISTING REAR WALL, NEW ROOF FRAMING FOR EXISTING REAR ADDITION,NEW CONCRETE FOOTING | 478 10 STREET, Brooklyn |
Roofing and exterior | Oct 2, 2026 | 1 | Subscribers |
| The Siegfried Group - Construction work on the 25th floor as indicated on drawings. | 90 PARK AVENUE, Manhattan |
Other | Oct 2, 2026 | 1 | $250,000 to $1 million |
| TEMPORARY SHORING AS PER PLANS HEREWITH FILED. | 323 38 STREET, Brooklyn |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| DIRECT REPLACEMENT OF OLD/EXISTING EXHAUST HOOD WITH NEW AT EXISTING DELI/GROCERY STORE. EXISTING EXHAUST DUCT & FAN TO REMAIN UNDISTURBED. | 1349 WEBSTER AVENUE, Bronx |
Mechanical | Oct 2, 2026 | 1 | Under $250,000 |
| Structural work associated with cellar restoration work. No change in occupancy, use or egress. | 49 EAST 86 STREET, Manhattan |
Other | Oct 2, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # | 111 EAST 12 STREET, Manhattan |
Other | Oct 2, 2026 | 1 | Subscribers |
| SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIRS WORKS AT 235 EAST 46 STREET MANHATTAN, NY 10017 | 235 EAST 46 STREET, Manhattan |
Roofing and exterior | Oct 2, 2026 | 1 | Subscribers |
| Installation of solar panels, rooftop, grid tied, railed, 8 modules, 3.28 KW | 245 REVERE AVENUE, Bronx |
Roofing and exterior | Oct 2, 2026 | 1 | Under $250,000 |
| HEREWITH FILING RENOVATION OF EXISTING SINGLE-FAMILY HOUSE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 97 2 STREET, Brooklyn |
Major renovation | Oct 2, 2026 | 1 | $250,000 to $1 million |
| Installation of suspended scaffold for facade work or inspection. | 1810 3 AVENUE, Manhattan |
Roofing and exterior | Oct 2, 2026 | 1 | Subscribers |