| General construction for interior renovation of Apartment 5H on the 6th floor as shown on drawings filed herewith. No change in use, egress | 11 STUYVESANT OVAL, Manhattan |
Major renovation | Sep 28, 2026 | 1 | Under $250,000 |
| CONVERT ONE-FAMILY HOUSE INTO TWO-FAMILY HOUSE. NO ENLARGEMENT IS PROPOSED. ASSOCIATED PLUMBING WORK IS FILED AS JOB B00600518. | 166 EAST 31 STREET, Brooklyn |
Plumbing | Sep 28, 2026 | 1 | $250,000 to $1 million |
| INTERIOR RENOVATION, INSTALLATION OF TYPE 2 HOOD AND INSTALLATION OF HVAC SYSTEM FOR PROPOSED SPACE, NO CHANGE IN USE, OCCUPANCY OR EGRESS | 2212 FREDERICK DOUGLASS BOULEVARD, Manhattan |
Mechanical | Sep 28, 2026 | 1 | Under $250,000 |
| REPLACE HOT WATER HEATER UNIT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | 510 WEST 165 STREET, Manhattan |
Plumbing | Sep 28, 2026 | 1 | Under $250,000 |
| Proposed water, sanitary sewer, and storm in OSP, GF and 1st FL to connect the new modular residence to city lines. The modular residence is | 398 HAMDEN AVENUE, Staten Island |
Plumbing | Sep 28, 2026 | 1 | Subscribers |
| INSTALL GAS BBQ, AND ASSOCIATED PIPING, VALVES, APPURTENANCES. CONNECTION TO EXISTING GAS PIPING DISTRIBUTION WITHIN THE APARTMENT ON THE FI | 48 WEST 86 STREET, Manhattan |
Plumbing | Sep 28, 2026 | 1 | Under $250,000 |
| Convert a (2) family into a (1) Family. New Enlargement at the rear of the building. (Foundation only) | 575 MACON STREET, Brooklyn |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| Remedy ECB violation 39200284K. Remove illegal wood structure at the rear yard. No change in use, egress or occupancy under this application | 25-28 148 STREET, Queens |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| apt # 2N minor interior renovation of kitchen and laundry room | 170 WEST END AVENUE, Manhattan |
Major renovation | Sep 28, 2026 | 1 | Under $250,000 |
| FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 7114 170 STREET, Queens |
Roofing and exterior | Sep 28, 2026 | 1 | Under $250,000 |
| DEP Antenna Site. Removal of (2) antennas on bulkhead facade. Install (1) DCU cabinet on roof at bulkhead facade and (1) related solar panel | 375 SEGUINE AVENUE, Staten Island |
Roofing and exterior | Sep 28, 2026 | 1 | Under $250,000 |
| REMOVAL OF AN EXISTING DROP STAIR AND INSTALLATION OF A NEW DROP LADDER AT 2ND FLOOR FIRE EXCAPE INCLUDING ADDITION TO EXISTING FIRE ESCAPE | 23 GREENE STREET, Manhattan |
Major renovation | Sep 28, 2026 | 1 | Under $250,000 |
| LEGALIZE THE AREA DRAIN FOR THE PROPOSED EXTERIOR STAIRS FILED UNDER APPLICATION NO. B01422035 - I1 TO REMEDY OATH/ECB VIOLATION #39176514J | 2323 61 STREET, Brooklyn |
Plumbing | Sep 28, 2026 | 1 | Subscribers |
| 8' high Plywood construction fence | 161-14 GRAND CENTRAL PARKWAY, Queens |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| ERECT TEMPORARY CONSTRUCTION FENCE TO FACILITATE FULL DEMO AND NB CONSTRUCTION OPERATION | 27-06 154 STREET, Queens |
Demolition | Sep 28, 2026 | 1 | Under $250,000 |
| GC/ST FILING FOR ADA COMPLIANT SIDEWALK RAMP/PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 115 WEST BROADWAY, Manhattan |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| Removal of the partially constructed rear yard deck built without a permit and addressing the associated work without a permit violation No. | 220-11 138 ROAD, Queens |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| One time Temporary Seasonal use of house and exterior structure between the dates of 9/25/2026 and 11/02/2026. | 211-17 HOLLIS AVENUE, Queens |
Roofing and exterior | Sep 28, 2026 | 1 | Under $250,000 |
| Interior demolition of non-load bearing partitions, finishes, and fixtures at 1st floor commercial space. No change to use, egress or occupa | 189 SCHERMERHORN STREET, Brooklyn |
Demolition | Sep 28, 2026 | 1 | $250,000 to $1 million |
| Filing for Plumbing work for new Bathroom | 129 ALLEN STREET, Manhattan |
Plumbing | Sep 28, 2026 | 1 | Under $250,000 |
| Reconfigure sprinkler system subsequent to GC (-I1) job. The system is hydraulically calculated. | 1224 FLUSHING AVENUE, Brooklyn |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| FACADE RESTORATION AS PER PLANS | 70-01 113 STREET, Queens |
Roofing and exterior | Sep 28, 2026 | 1 | Under $250,000 |
| Demolition of rooftop mechanical units (HVAC and MEP) and supporting dunnage, cooling towers, tanks, and sealed skylights. | 346 MADISON AVENUE, Manhattan |
Demolition | Sep 28, 2026 | 1 | Under $250,000 |
| Glass Wall Demolition | 346 MADISON AVENUE, Manhattan |
Demolition | Sep 28, 2026 | 1 | Under $250,000 |
| GRINDING AND REPOINTING OF THE BRICK AS NECESSARY, AND REPLACEMENT OF THE CRACKED BRICK AS PER THE PLAN. ALSO, REMOVE ECB VIOLATION NO: 3572 | 1807 CLINTON AVENUE, Bronx |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| APPLICATION FILED TO INSTALL KITCHEN EXHAUST SYSTEM (HOOD,DUCTWORK, AND EXHAUST FAN) FOR KITCHEN SPACE IN THE FIRST FLOORAS PER PLANS. FIRE | 262 WYCKOFF AVENUE, Brooklyn |
Mechanical | Sep 28, 2026 | 1 | Under $250,000 |
| REPLACE EXISTING CURB CUT | 788 FOREST AVENUE, Staten Island |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| 1. INTERIOR RENOVATION IN THE 1ST & 2ND FLOOR TO ADDRESS FIRE DAMAGE. 2. REPLACE EXISTING WINDOW IN KIND IN THE 2ND FLOOR.3.ADDRRSS DOB VIO# | 92-49 75 STREET, Queens |
Roofing and exterior | Sep 28, 2026 | 1 | Under $250,000 |
| INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION/ REPAIR AS PER PLAN SUBMITTED | 230 WEST 55 STREET, Manhattan |
Roofing and exterior | Sep 28, 2026 | 1 | Subscribers |
| Facade repairs as per plans filed herewith. No change in use, egress, or occupancy. | 250 WEST 57 STREET, Manhattan |
Roofing and exterior | Sep 28, 2026 | 1 | $1 to $5 million |