| INSTALLATION OF THE TEMPORARY FENCE AT 408 KINGSBOROUGH 4TH WALK, BROOKLYN, NY 11233 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE U | 408 KINGSBOROUGH 4 WALK, Brooklyn |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| FACADE AND ROOF REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY | 151 EAST 50 STREET, Manhattan |
Roofing and exterior | Sep 28, 2026 | 1 | Under $250,000 |
| INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR | 229 SHEPHERD AVENUE, Brooklyn |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| Renovations to existing Class A apartment 2L in an existing multiple-dwelling building. No change in use, egress, or occupancy. | 270 NAGLE AVENUE, Manhattan |
Major renovation | Sep 28, 2026 | 1 | Under $250,000 |
| Installation of solar panels, rootop, grid tied, railed, 16 modules, 6.56 KW | 100-12 205 STREET, Queens |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| INTERIOR DEMOLITION/CLEANUP OF THE EXISTING FLOORING,CEILING TILES, EXISTING SHELVING, FURNITURE, & PARTITIONS AT THE COMMERCIAL SPACE AT 1S | 6823 3 AVENUE, Brooklyn |
Demolition | Sep 28, 2026 | 1 | Under $250,000 |
| INSTALLATION OF THE TEMPORARY FENCE AT 630 KINGSBOROUGH 6TH WALK, BROOKLYN, NY 11233 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE U | 630 KINGSBOROUGH 6 WALK, Brooklyn |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| INSTALL TEMPORARY CONSTRUCTION FENCE @ OSP. | 18-17 149 STREET, Queens |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| FILING FOR INSTALLATION OF AN AWNING AT THE STOREFRONT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 2492 GERRITSEN AVENUE, Brooklyn |
Roofing and exterior | Sep 28, 2026 | 1 | Under $250,000 |
| Handheld full demolition of an existing 2-Story, 1-family building. | 3517 WAYNE AVENUE, Bronx |
Demolition | Sep 28, 2026 | 1 | Under $250,000 |
| Installation of solar system on the roof as per plan. No change in use, egress or occupancy | 92-14 88 AVENUE, Queens |
Roofing and exterior | Sep 28, 2026 | 1 | Under $250,000 |
| SUBSEQUENT FILING FOR MECHANICAL WORK TYPE IN CONJUNCTION W/ DOB# B01055054-I1, FILING FOR NEW SPLIT SYSTEM NON-DUCT UNITS. | 719 VERMONT STREET, Brooklyn |
Mechanical | Sep 28, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # | 99 ST MARKS PLACE, Manhattan |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| Suspended Scaffold for Facade Restoration as Shown on Plans | 40 LINCOLN CENTER PLAZA, Manhattan |
Roofing and exterior | Sep 28, 2026 | 1 | Subscribers |
| General construction modifications taking place on the 28th floors as per plans filed herewith. No change in use, egress or occupancy | 390 MADISON AVENUE, Manhattan |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. | 636 BAKER AVENUE, Bronx |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAP | 462 WEST 141 STREET, Manhattan |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE I | 462 WEST 141 STREET, Manhattan |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| 8'-0 TEMPORARY CONSTRUCTION WOOD FENCE | 36-20 23 AVENUE, Queens |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| TEMPORARY PLYWOOD CONSTRUCTION FENCE AT REAR YARD IN CONJUNCTION WITH GENERAL CONSTRUCTION DOB NOW JOB NUMBER M01207733-I1. NO CHANGE TO USE | 164 WEST 88 STREET, Manhattan |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| Install 8' solid wood construction fence around the property. | 388 GRAHAM AVENUE, Brooklyn |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Si | 240 EAST 27 STREET, Manhattan |
Roofing and exterior | Sep 28, 2026 | 1 | Subscribers |
| Hereby filing for roof and facade repairs. No change in use, egress or occupancy. | 159 BLEECKER STREET, Manhattan |
Roofing and exterior | Sep 28, 2026 | 1 | Under $250,000 |
| INSTALLATION OF THE TEMPORARY FENCE AT 442 KINGSBOROUGH 4TH WALK, BROOKLYN, NY 11233 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE U | 442 KINGSBOROUGH 4 WALK, Brooklyn |
Other | Sep 28, 2026 | 1 | Under $250,000 |
| PROPOSED INTERIOR RENOVATION OF EXIST. 2 STORY FRAME BUILDING. GENERAL CONSTRUCTION WORK AT CEL, 01, AND 02 FLOOR; REMOVE & INSTALL WINDOWS, | 37-33 100 STREET, Queens |
Roofing and exterior | Sep 28, 2026 | 1 | $250,000 to $1 million |
| SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 37-33 100 STREET, Queens |
Plumbing | Sep 28, 2026 | 1 | Under $250,000 |
| Modification to the entry of the access stair connecting The Highline to The Caledonia building. Work at the High Line filed under DOBNOW Jo | 450 WEST 17 STREET, Manhattan |
Other | Sep 28, 2026 | 1 | $250,000 to $1 million |
| APPLICATION TO OBTAIN ICO IN UNIT 1E. PROPOSED INTERIOR STAIR TO STORAGE AREA. NO CHANGE IN BUILDING CODE OCCUPANCY, NO CHANGE IN ZONING USE | 49 WARREN STREET, Manhattan |
Major renovation | Sep 28, 2026 | 1 | Under $250,000 |
| FACADE REPAIR PROGRAM INCLUDING BRICK REPLACEMENT, CONCRETE CRACK REPAIR, AND CONCRETE SPALL REPAIR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | 21 SAINT JAMES PLACE, Brooklyn |
Roofing and exterior | Sep 28, 2026 | 1 | $250,000 to $1 million |
| OUTRIGGER FOR FACADE REPAIR. | 708 EAST TREMONT AVENUE, Bronx |
Roofing and exterior | Sep 28, 2026 | 1 | Subscribers |