| Propose to renovate units 1b & 4A on the 1st & 4th flrs work to include Kitchen & bathroom only with general carpentry work, No change of us | 89 BLEECKER STREET, Manhattan |
Major renovation | Oct 16, 2026 | 1 | Under $250,000 |
| FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 169 10 STREET, Staten Island |
Roofing and exterior | Oct 16, 2026 | 1 | Under $250,000 |
| Installation of temporary fence around the proposed drywell area as shown on plans. | 81-35 192 STREET, Queens |
Other | Oct 16, 2026 | 1 | Under $250,000 |
| Removal and replacement of gas piping to existing equipment as shown on plans due to utility company inspection and shutdown. No removal or | 358 GATES AVENUE, Brooklyn |
Plumbing | Oct 16, 2026 | 1 | Under $250,000 |
| On 1st floor, removal of existing deck in rear yard to comply violation #39190983N.. Al las per plans. No change in use, egress or occupancy | 710 MACON STREET, Brooklyn |
Other | Oct 16, 2026 | 1 | Under $250,000 |
| PROPOSED RENOVATION OF AN EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRES | 2222 FOREST AVENUE, Staten Island |
Major renovation | Oct 16, 2026 | 1 | Under $250,000 |
| Structural work associated with installation of convenience stairs. No change in occupancy, use or egress. | 1400 PITKIN AVENUE, Brooklyn |
Other | Oct 16, 2026 | 1 | Under $250,000 |
| FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 22A EDGEWATER PARK, Bronx |
Roofing and exterior | Oct 16, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # | 10-09 43 AVENUE, Queens |
Other | Oct 16, 2026 | 1 | Under $250,000 |
| 8ft high construction fence erected on sidewalk in front of premise under construction. | 1871 BROADWAY, Manhattan |
Other | Oct 16, 2026 | 1 | Under $250,000 |
| Interior renovation existing commercial space to replace shelf, service table, and walk-in cooler, etc. No change of use, egress, or occupan | 243 EAST 198 STREET, Bronx |
Major renovation | Oct 16, 2026 | 1 | Under $250,000 |
| 17' TOTAL SHARED CURB CUT FOR LOTS 7 & 8 (HOUSES 103 & 105) | 103 BLOOMINGDALE ROAD, Staten Island |
Other | Oct 16, 2026 | 1 | Subscribers |
| FILED HEREWITH TO REPLACE EXISTING HANDICAP RAMP AS PER PLANS, NO CHANGE TO USE, EGRESS OR OCCUPANCY | 200 COLUMBUS AVENUE, Manhattan |
Other | Oct 16, 2026 | 1 | Under $250,000 |
| INTERIOR RENOVATION OF UNIT #4A ON 1ST FLOOR & UNIT #C6 ON 3RD FLOOR IN EXISTING 4 STORY MIXED USE BUILDING. NO CHANGE IN USE, MEANS OR EGRE | 84-37 118 STREET, Queens |
Major renovation | Oct 16, 2026 | 1 | Under $250,000 |
| Structural work filed for the integration of steel-framed slab on metal deck floor within existing building. No change in use, occupancy or | 155 BANK STREET, Manhattan |
Other | Oct 16, 2026 | 1 | Under $250,000 |
| Subsequent filing for use of mechanical construction equipment to lift, hoist and move material, earth and personnel on site. | 9609 KINGS HIGHWAY, Brooklyn |
Mechanical | Oct 16, 2026 | 1 | Under $250,000 |
| PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE I | 46 REMSEN STREET, Brooklyn |
Other | Oct 16, 2026 | 1 | Under $250,000 |
| INSTALL MEDIUM DUTY PIPE SCAFFOLDING FOR EXTERIOR REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SC | 100 LEFFERTS AVENUE, Brooklyn |
Roofing and exterior | Oct 16, 2026 | 1 | Under $250,000 |
| Install new SP heads as per plan, filed in conjunction with job #Q01154656-I1. | 83-68 117 STREET, Queens |
Other | Oct 16, 2026 | 2 | Subscribers |
| INSTALLATION OF SOLAR PANELS,ROOFTOP, RAILED, GRID-TIED, 11 MODULES, 4.51KW | 3010 KINGSLAND AVENUE, Bronx |
Roofing and exterior | Oct 16, 2026 | 1 | Under $250,000 |
| plumbing work associated with interior renovation of exist ground floor commercial space, no change to exist use/egress/occupancy/yards/bulk | 1076 EAST 165 STREET, Bronx |
Plumbing | Oct 16, 2026 | 1 | Under $250,000 |
| SPRINKLER WORK IN CONJUNCTION WITH NEW BUILDING Q00536309-I1 | 31-48 CRESCENT STREET, Queens |
New commercial construction | Oct 16, 2026 | 1 | Under $250,000 |
| PLUMBING WORK IN CONJUNCTION WITH NEW BUILDING # Q00536309-I1. | 31-48 CRESCENT STREET, Queens |
Plumbing | Oct 16, 2026 | 1 | $250,000 to $1 million |
| INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAP | 96-05 HORACE HARDING EXPRESSWAY, Queens |
Other | Oct 16, 2026 | 1 | Under $250,000 |
| INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOL | 5141 BROADWAY, Manhattan |
Other | Oct 16, 2026 | 1 | Under $250,000 |
| FILING FOR INTERIOR RENO FOR 7TH FLOOR PREBUILT OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | 560 LEXINGTON AVENUE, Manhattan |
Major renovation | Oct 16, 2026 | 1 | $1 to $5 million |
| NEW TEMPORARY CONSTRUCTION FENCE IN REAR YARD OF EXISTING 2 STORY BLDG. IN CONJUNCTION WITH APPLICATION # B01358133-I1 | 443 14 STREET, Brooklyn |
Other | Oct 16, 2026 | 1 | Under $250,000 |
| SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APP | 102-25 184 STREET, Queens |
Other | Oct 16, 2026 | 1 | Under $250,000 |
| Interior demolition and construction for Cornell Expansion on 18th marketing floor (17th construction floor) | 1155 6 AVENUE, Manhattan |
Demolition | Oct 16, 2026 | 1 | Under $250,000 |
| alteration of existing office space, all as shown on drawings herewith submitted. No change use, egress or occupancy. | 89-02 SUTPHIN BOULEVARD, Queens |