Start free trial
City permits

Philadelphia building permits

Recent permit activity in Philadelphia, Pennsylvania. Projects here are at least 30 days old; subscribers see new permits the day they are issued.

27,497projects
39,721permits
Oct 24, 2026latest in the free view

Partial coverage City of Philadelphia Department of Licenses and Inspections building, zoning, trade (electrical, plumbing, mechanical, fire suppression), demolition and sign permits with issue date, address, work type, commercial/residential flag, scope of work and contractor name (about 87 percent of recent rows). The table has no declared job value column at all, so value filters cannot use it. The feed has latitude/longitude only as a PostGIS geometry (the_geom hex) and state-plane geocode_x/geocode_y, which the carto connector does not decode, so coordinates come from the address geocoder. Zoning permits and certificates of occupancy are in the same table.

Top project types

Major renovation8,734 projects
Plumbing6,733 projects
Electrical2,832 projects
Other2,830 projects
Roofing and exterior2,386 projects
Mechanical1,364 projects

Recent permit activity

ProjectWhereTypeIssuedPermitsValue
Site / Utility Permit for RP-2026-0047791025 W ARIZONA ST, Philadelphia OtherSep 18, 20261Subscribers
Site / Utility Permit for RP-2026-0063182609 REED ST, Philadelphia OtherSep 18, 20261Subscribers
INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A 2" 950XLT2BF302 WINTON ST, Philadelphia OtherSep 18, 20261Subscribers
INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A 2" 950XLT2BF306 WINTON ST, Philadelphia OtherSep 18, 20261Subscribers
INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A 2" 950XLT2BF312 WINTON ST, Philadelphia OtherSep 18, 20261Subscribers
INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A 2" 950XLT2BF310 WINTON ST, Philadelphia OtherSep 18, 20261Subscribers
INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A 2" 950XLT2BF308 WINTON ST, Philadelphia OtherSep 18, 20261Subscribers
INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A 2" 950XLT2BF304 WINTON ST, Philadelphia OtherSep 18, 20261Subscribers
FOR LEVEL II INTERIOR ALTERATIONS TO CONDOMINIUM UNIT #3102 AKA 31D AT THE 31ST FLOOR OF THE EXISTING HIGH-RISE STRUCTURE. ALL WORK TO BE DO130 S 18TH ST, Philadelphia Major renovationSep 18, 20261Subscribers
FOR LEVEL III ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY (NO CHANGE OF OCCUPANCY CLASSIFICATION, GROUP R-3 TO GROUP R-3) TO CREATE A TWO-F127 S PEACH ST, Philadelphia Major renovationSep 18, 20261Subscribers
FOR ALTERATIONS, TO INCLUDE THE ELIMINATION OF ONE (1) OFF-STREET INTERIOR PARKING SPACE, TO AN EXISTING SEMI-DETACHED SINGLE-FAMILY STRUCTU1642 FORRESTAL ST, Philadelphia Major renovationSep 18, 20261Subscribers
changing the garage door to a door and a wall. and changing the original door to be a window. basement is accessory to existing single famil4308 VISTA ST, Philadelphia Major renovationSep 18, 20261Subscribers
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards r3300 HENRY AVE, Philadelphia Major renovationSep 18, 20261Subscribers
FOR INTERIOR ALTERATIONS TO INCLUDE THE ELIMINATION OF ONE (1) OFF-STREET PARKING SPACE IN AN EXISTING SINGLE-FAMILY STRUCTURE AS PER APPROV7424 RUSKIN RD, Philadelphia Major renovationSep 18, 20261Subscribers
FOR THE ERECTION OF A DETACHED STRUCTURE (MAX. 38’ HIGH); FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING; SIZE AND LOCATION AS SHOWN ON THE PLA419 W CLAPIER ST, Philadelphia Major renovationSep 18, 20261Subscribers
FOR THE ERECTION OF A DETACHED STRUCTURE (MAX. 38’ HIGH); FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING; SIZE AND LOCATION AS SHOWN ON THE PLA419 W CLAPIER ST, Philadelphia Major renovationSep 18, 20261Subscribers
FOR THE ERECTION OF A DETACHED STRUCTURE (MAX. 38’ HIGH); FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING; SIZE AND LOCATION AS SHOWN ON THE PLA419 W CLAPIER ST, Philadelphia Major renovationSep 18, 20261Subscribers
FOR THE ERECTION OF A DETACHED STRUCTURE (MAX. 38’ HIGH); FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING WITH FOUR (4) ACCESSORY OFF-STREET SUR419 W CLAPIER ST, Philadelphia Major renovationSep 18, 20261Subscribers
FOR THE ERECTION OF A DETACHED STRUCTURE (MAX. 38’ HIGH); FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING WITH ONE (1) ACCESSORY OFF-STREET SURF419 W CLAPIER ST, Philadelphia Major renovationSep 18, 20261Subscribers
FOR THE ERECTION OF A DETACHED STRUCTURE (MAX. 38’ HIGH); FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING WITH ONE (1) ACCESSORY OFF-STREET SURF419 W CLAPIER ST, Philadelphia Major renovationSep 18, 20261Subscribers
FOR THE ERECTION OF A DETACHED STRUCTURE (MAX. 38’ HIGH); FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING WITH FOUR (4) ACCESSORY OFF-STREET SUR419 W CLAPIER ST, Philadelphia Major renovationSep 18, 20261Subscribers
FOR THE ERECTION OF A DETACHED STRUCTURE (MAX. 38’ HIGH); FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING; SIZE AND LOCATION AS SHOWN ON THE PLA419 W CLAPIER ST, Philadelphia Major renovationSep 18, 20261Subscribers
FOR THE ERECTION OF A DETACHED STRUCTURE (MAX. 38’ HIGH); FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING; SIZE AND LOCATION AS SHOWN ON THE PLA419 W CLAPIER ST, Philadelphia Major renovationSep 18, 20261Subscribers
Interior non-structural alterations to existing basement of an existing single family dwelling, office space accessory to dwelling the unit.4004 MITCHELL ST, Philadelphia Major renovationSep 18, 20264Subscribers
Interior alterations as per plans. NO WORK PROPOSED NOR APPROVED IN THE BASEMENT WHICH IS UNHABITABLE SPACE. BASEMENT IS TO REMAIN UNFINISHE1615 W WYOMING AVE, Philadelphia Major renovationSep 18, 20264Subscribers
For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation 5939 VINE ST, Philadelphia Major renovationSep 18, 20263Subscribers
MAKE SAFE PERMIT TO COMPLY WITH CASE #CF-2024-104553- FOR THE REAR SHED DEMOLITION AND RECONSTRUCTION AS PER ENGINEER'S REPORT. ABUTTING SID4746 PASCHALL AVE, Philadelphia DemolitionSep 18, 20262Subscribers
Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CT, FAI & MD.881 SANGER ST, Philadelphia PlumbingSep 18, 20262Subscribers
For interior alterations to an existing attached single-family dwelling per plans. Separate permits are required for all associated Mechanic1621 REED ST, Philadelphia Major renovationSep 18, 20264Subscribers
FOR A TENANT FITOUT TO INCLUDE A CHANGE IN OCCUPANCY. FOR A SIT DOWN RESTAURANT . **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDI4637 FRANKFORD AVE, Philadelphia Major renovationSep 18, 20262Subscribers

Free to browse: permits older than 30 days. New permits, the general contractor, the owner and the exact value are for subscribers.

Arkon Leads
$99 per month per area
  • Drop a pin and choose a radius of up to 15 km (about 9 miles) around it (for example around Philadelphia)
  • See new permits the day they are issued, with the general contractor, the owner and the exact value
  • A daily alert for your area, by email or in the app
  • No exclusivity: every subscriber sees the same permits
Subscribe to an area Log in

Permit data comes from official county and city sources. Dates and values are as the source reports them.

Philadelphia: Source: City of Philadelphia, Department of Licenses and Inspections, Licenses and Inspections Building and Zoning Permits (OpenDataPhilly). Licence: City of Philadelphia open data (no licence stated on the dataset page; OpenDataPhilly portal terms). Terms