| FOR ADDITION OF ROOFTOP DECK ATOP EXISING BUILDING PER APPROVED PLANS. | 319 BROWN ST, Philadelphia |
Major renovation | Jun 9, 2026 | 1 | Subscribers |
| FOR AN UPDATED CERTIFICATE OF OCCUPANCY AND LAWFUL OCCUPANCY. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS. NO ALTERATIONS ARE APPR | 740 W ERIE AVE, Philadelphia |
Major renovation | Jun 9, 2026 | 1 | Subscribers |
| SEAL SEWER LATERAL (DEMO) | 2407 N DOVER ST, Philadelphia |
Plumbing | Jun 9, 2026 | 1 | Subscribers |
| FOR THE ERECTION OF AN ATTACHED STRUCTURE, ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE & LOCATION AS SHOWN ON THE APPLICATION/PLANS. | 1414 E SUSQUEHANNA AVE, Philadelphia |
Major renovation | Jun 9, 2026 | 1 | Subscribers |
| For the creation of 57 surface parking spaces for the Trucking and Transportation Terminal use. Size and location per plans. | 3051 S FRONT ST, Philadelphia |
Other | Jun 9, 2026 | 1 | Subscribers |
| FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13R THROUGHOUT SECOND AND THIRD FLOOR LEVELS WITH 2” FIRE SERVICE | 517 BAINBRIDGE ST, Philadelphia |
Other | Jun 9, 2026 | 1 | Subscribers |
| REPLACE 40 GALLON GAS WATER HEATER, EXPANSION TANK & SMOKE PIPE. | 2910 N RINGGOLD ST, Philadelphia |
Plumbing | Jun 9, 2026 | 2 | Subscribers |
| FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING OFFICE BEING CONVERTED INTO A FAMILY CHANGING ROOM LOCATED ON 1ST FLOOR IN THE MAIN HOSPITA | 3401 CIVIC CENTER BLVD, Philadelphia |
Major renovation | Jun 9, 2026 | 1 | Subscribers |
| EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards r | 1845 WALNUT ST, Philadelphia |
Major renovation | Jun 9, 2026 | 1 | Subscribers |
| EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards r | 1845 WALNUT ST, Philadelphia |
Major renovation | Jun 9, 2026 | 1 | Subscribers |
| FOR THE ERECTION OF STRUCTURAL DUNNAGE AT ROOF OF EXISTING STRUCTURE AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ALL MEP WORK. | 1401-15 ARCH ST, Philadelphia |
Major renovation | Jun 9, 2026 | 1 | Subscribers |
| FOR THE INSTALLATION OF 4 NEW PENDENT SPRINKLERS TO AN EXISTING FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING. AS P | 220-60 S 33RD ST, Philadelphia |
Major renovation | Jun 9, 2026 | 1 | Subscribers |
| For the erection of a second floor addition, and the addition of a roof deck above the first floor (accessed from the interior). For interio | 7615 SAINT MARTINS LN, Philadelphia |
Major renovation | Jun 9, 2026 | 1 | Subscribers |
| EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per | 1203 MARLYN RD, Philadelphia |
Mechanical | Jun 9, 2026 | 2 | Subscribers |
| INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH 2 INCH WILKINS | 1510 N 25TH ST, Philadelphia |
New commercial construction | Jun 9, 2026 | 1 | Subscribers |
| REPAIR/REPLACE CT, FAI & MD. | 408 SLOCUM ST, Philadelphia |
Plumbing | Jun 9, 2026 | 2 | Subscribers |
| REPAIR/REPLACE CT & FAI. | 2428 ARLINGTON ST, Philadelphia |
Plumbing | Jun 9, 2026 | 2 | Subscribers |
| Residential - Household Living - Two-Family | 6601 MONTAGUE ST, Philadelphia |
Major renovation | Jun 9, 2026 | 3 | Subscribers |
| Group Living | 118 E INDIANA AVE, Philadelphia |
Major renovation | Jun 9, 2026 | 4 | Subscribers |
| FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 THROUGHOUT THE ENTIRE BUILDING WITH 4” FIRE SERVICE, AND 4" BAC | 2531 E LEHIGH AVE, Philadelphia |
New commercial construction | Jun 9, 2026 | 2 | Subscribers |
| FOR THE INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT BUILDING STRUCTURE TO INCLUDE 1-INCH COM | 2138 BELLMORE ST, Philadelphia |
Other | Jun 9, 2026 | 3 | Subscribers |
| Rough-In Permit for EP-2026-001536 Existing service. Install new 120/240V circuits as per commercial fit out plan. Install new fire alarm wi | 5201-03 N 5TH ST, Philadelphia |
Electrical | Jun 9, 2026 | 2 | Subscribers |
| FOR THE ERECTION OF A REAR ADDITION AND INTERIOR ALTERATIONS THROUGHOUT AN EXISTING ATTACHED STRUCTURE USED AS A SINGLE-FAMILY DWELLING AS P | 127 N MOLE ST, Philadelphia |
Major renovation | Jun 9, 2026 | 3 | Subscribers |
| 2.5 bathrooms 1 kitchen sink 1 laundry sink | 2435 N 31ST ST, Philadelphia |
Plumbing | Jun 9, 2026 | 3 | Subscribers |
| LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EVENT ASSEMBLY FACILITY ON THE 9TH FLOOR OF AN EXISTING HIGH-RISE BUILDING | 1301-25 CHESTNUT ST, Philadelphia |
Major renovation | Jun 9, 2026 | 7 | Subscribers |
| FOR THE ERECTION OF AN ATTACHED THREE (3) STORY STRUCTURE OF TYPE V-B CONSTRUCTION FOR USE AS ONE (1) VACANT COMMERCIAL SPACE (SEPARATE PERM | 1871 FRANKFORD AVE, Philadelphia |
New commercial construction | Jun 9, 2026 | 3 | Subscribers |
| FOR INTERIOR AND EXTERIOR ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE USED AS A SINGLE FAMILY DWELING AS PER BUILDING APPLICATION/PLAN. | 435 S 49TH ST, Philadelphia |
Major renovation | Jun 9, 2026 | 3 | Subscribers |
| FOR LEVEL II ALTERATIONS TO THE 14TH FLOOR LEVEL OF AN EXISTING STRUCTURE. FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECT | 2929 ARCH ST, Philadelphia |
Major renovation | Jun 9, 2026 | 10 | Subscribers |
| FOR INTERIOR ALTERATIONS TO THE BASEMENT AND FIRST FLOOR OF AN EXISTING ATTACHED STRUCTURE USED AS A SINGLE-FAMILY DWELLING AS PER BUILDING | 1918 PINE ST, Philadelphia |
Major renovation | Jun 9, 2026 | 4 | Subscribers |
| Residential - Household Living - Multi-Family | 1200-02 W LEHIGH AVE, Philadelphia |
Major renovation | Jun 8, 2026 | 1 | Subscribers |