| BASE: Installing a backup battery system and additional meter socket. | 6550 CLAIRMONT DR, AUSTIN |
Electrical | Sep 22, 2026 | 1 | Subscribers |
| Replacement of arcing and defective federal Pacific panels and main service. Installation of a 400 amp riser and gutter box with two 200 amp | 606 BRENTWOOD ST, AUSTIN |
Electrical | Sep 22, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system. | 9310 TANAGER WAY, AUSTIN |
Mechanical | Sep 22, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system. | 1313 BYERS LN, AUSTIN |
Mechanical | Sep 22, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 901 CONRAD ST, AUSTIN |
Electrical | Sep 22, 2026 | 1 | Subscribers |
| sewer spot repair | 10309 HANSA CV, AUSTIN |
Plumbing | Sep 22, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 800 SALEM LN, AUSTIN |
Electrical | Sep 22, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work | 2315 W 9TH ST, AUSTIN |
Mechanical | Sep 22, 2026 | 1 | Subscribers |
| Porch Enclosure- Enclose existing patio to create a sunroom. | 1517 ARIAL DR, AUSTIN |
Other | Sep 22, 2026 | 1 | Under $250,000 |
| Construct new driveway approach of 35 FT and sidewalk of 242 LF SP-2018-0006C 2022 068338 000 00 SSI *** Keeping the current sidewalk open f | 5411 E WILLIAM CANNON DR, AUSTIN |
New commercial construction | Sep 22, 2026 | 1 | Subscribers |
| roof replacement with TPO tapered insulation for positive drainage and potentially replace rotted plywood. | 609 BLANCO ST, AUSTIN |
Major renovation | Sep 22, 2026 | 1 | Under $250,000 |
| BASE: Installing a backup battery system and additional meter socket. | 1506 BARTON HILLS DR, AUSTIN |
Electrical | Sep 22, 2026 | 1 | Subscribers |
| Trenchless Water Line Replacement from house to water meter | 11512 JUNIPER RIDGE DR, AUSTIN |
Plumbing | Sep 22, 2026 | 1 | Subscribers |
| Perform an under-slab sanitary sewer repair using the tunneling method to access and repair a break serving one bathroom group. The initial | 3009 SUNRIDGE DR, AUSTIN |
Plumbing | Sep 22, 2026 | 1 | Subscribers |
| Non structural interior demo | 600 E 53RD ST BLDG D UNIT 151, AUSTIN |
Demolition | Sep 22, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 13113 PARTRIDGE BEND DR, AUSTIN |
Electrical | Sep 22, 2026 | 1 | Subscribers |
| ETJ-New construction sfr | 15812 NARCISSUS WAY, AUSTIN |
Electrical | Sep 22, 2026 | 2 | Subscribers |
| ETJ-New construction sfr | 15821 NARCISSUS WAY, AUSTIN |
Electrical | Sep 22, 2026 | 2 | Subscribers |
| ETJ-New construction sfr | 25 HIGHTRAIL WAY, THE HILLS |
Electrical | Sep 22, 2026 | 2 | Subscribers |
| ETJ-New construction sfr | 15817 NARCISSUS WAY, AUSTIN |
Electrical | Sep 22, 2026 | 2 | Subscribers |
| Total Demo of SFR 1272sqft built 1958 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notifica | 1607 SYLVAN GLADE, AUSTIN |
Demolition | Sep 22, 2026 | 1 | Subscribers |
| Total Demo of a SFR 1061 sqft built in 1958 ***The building shall not be demolished until after the contractor has fulfilled the neighbor no | 412 KREBS LN, AUSTIN |
Demolition | Sep 22, 2026 | 1 | Subscribers |
| Install new 5.76 kW rooftop solar system to existing residential only using backfed breaker only. | 6407 SOUTH MEADOWS BLVD, AUSTIN |
Electrical | Sep 22, 2026 | 2 | Subscribers |
| INTERIOR REMODEL -AMENITIES CENTER. REPLACE ALL MISSING FIREPROOFING AND FIRESTOPPING. AFFECTED BY NEW CONSTRUCTION WITH FIREPROOFING TO MAT | 11044 RESEARCH BLVD SVRD SB BLDG B UNIT 100, AUSTIN |
Major renovation | Sep 22, 2026 | 1 | Subscribers |
| CHANGE OF USE ADMIN OFFICE TO MEDICAL OFFICE PHARMACY with interior remodel. Initial discussions with AFD indicate no hazmat required. Email | 2727 EXPOSITION BLVD UNIT 100, AUSTIN |
Major renovation | Sep 22, 2026 | 1 | Subscribers |
| Total demo of sfr 900 sqft circa 1952 | 4700 AVENUE G, AUSTIN |
Demolition | Sep 22, 2026 | 1 | Subscribers |
| Total demo of SFR 1128 sq ft circa 1952 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notifi | 906 PAYNE AVE, AUSTIN |
Demolition | Sep 22, 2026 | 1 | Subscribers |
| Interior renovation and finish refresh of an existing tenant suite | 11801 DOMAIN BLVD UNIT 400, AUSTIN |
Major renovation | Sep 22, 2026 | 3 | Subscribers |
| NEW CONSTRUCTION OF TWO-STORY COMMUNITY ARTS EDUCATIONAL BUILDING. Concurrent Review: SP-2024-0009C | 4611 TILLEY ST, AUSTIN |
New commercial construction | Sep 22, 2026 | 6 | $5 to $25 million |
| Porch enclosure- Convert existing porch into livable space | 11226 BLACKMOOR DR, AUSTIN |
Other | Sep 22, 2026 | 2 | Under $250,000 |