| Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 5 ton horizontal gas | 12817 CRICOLI DR, AUSTIN |
Mechanical | Aug 25, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5 ton horizontal gas (upstairs) | 15043 SAVANNAH HEIGHTS DR, AUSTIN |
Mechanical | Aug 25, 2026 | 1 | Subscribers |
| Express: Kitchen cabinet remodel. remove existing cabinets and countertops. install new cabinets and countertops | 11506 WALNUT RIDGE DR, AUSTIN |
Other | Aug 25, 2026 | 1 | Under $250,000 |
| Replacement of complete existing central heat and air system with or without duct work HVAC changeout/alteration: Remove and replace existin | 1608 WILSHIRE BLVD, AUSTIN |
Mechanical | Aug 25, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work | 2608 DUNBARTON DR, AUSTIN |
Mechanical | Aug 25, 2026 | 1 | Subscribers |
| Replacement of an existing water heater 40gal gas tank | 2416 JESSE OWENS DR, AUSTIN |
Plumbing | Aug 25, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 6602 VINE ST, AUSTIN |
Electrical | Aug 25, 2026 | 1 | Subscribers |
| 28616 - Trend AI - Exterior Parapet Wall Signage - EAST Sige Bldg | 11305 ALTERRA PKWY, AUSTIN |
Electrical | Aug 25, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work | 2600 GERAGHTY AVE, AUSTIN |
Mechanical | Aug 25, 2026 | 1 | Subscribers |
| Replacement of an existing water heater 40gal gas tank | 1409 SPRING GARDEN RD, AUSTIN |
Plumbing | Aug 25, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 1503 ARCILLA ST, AUSTIN |
Electrical | Aug 25, 2026 | 1 | Subscribers |
| Express: Foundation repair (installing 23 exterior and 6 interior pilings) | 5712 MALCOM TRL, AUSTIN |
Roofing and exterior | Aug 25, 2026 | 1 | Under $250,000 |
| BASE: Installing a backup battery system and additional meter socket. | 4610 SHOALWOOD AVE, AUSTIN |
Electrical | Aug 25, 2026 | 1 | Subscribers |
| Clayton & Crume Neon Letters | 1718 S CONGRESS AVE, AUSTIN |
Electrical | Aug 25, 2026 | 1 | Subscribers |
| Temporary Loop Refer to site plan SP-2016-0048DX | 5730 1/2 MC NEIL DR, AUSTIN |
Electrical | Aug 25, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work | 1605 WATERSTON AVE, AUSTIN |
Mechanical | Aug 25, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 4406 OAK CREEK DR, AUSTIN |
Electrical | Aug 25, 2026 | 1 | Subscribers |
| Install/Replace 200 amp main breaker panel and meter can (overhead) | 3903 BURR OAK LN, AUSTIN |
Electrical | Aug 25, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work | 3811 MENCHACA RD UNIT E, AUSTIN |
Mechanical | Aug 25, 2026 | 1 | Subscribers |
| Express: bathroom remodeling. the client hired us after he demo the space. we are going to create walk in shower installing vanity Installin | 7105 NUTRIA RUN, AUSTIN |
Demolition | Aug 25, 2026 | 1 | Under $250,000 |
| Replacement of complete existing central heat and air system with or without duct work *JAMES RAMIREZ: Replace existing 4-ton horizontal gas | 7404 ATTAR CV, AUSTIN |
Mechanical | Aug 25, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Two Stage Vertical Gas | 2212 BORDLEY DR, AUSTIN |
Mechanical | Aug 25, 2026 | 1 | Subscribers |
| Replacement of an existing water heater Removing existing water heater and installing new 40 gallon natural gas water heater. | 7600 MIDPARK CT, AUSTIN |
Plumbing | Aug 25, 2026 | 1 | Subscribers |
| #130-160811 | 5501 N IH 35 SVRD NB, AUSTIN |
Electrical | Aug 25, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work | 11201 PICKFAIR DR, AUSTIN |
Mechanical | Aug 25, 2026 | 1 | Subscribers |
| We will install a new 60A Standard circuit in the 200A Main Service Panel | 3804 TILLEY ST, AUSTIN |
Electrical | Aug 25, 2026 | 1 | Subscribers |
| Replacement of an existing water heater Remove and replace Water Heater - 40 gal Gas | 3413 LYNRIDGE DR BLDG A, AUSTIN |
Plumbing | Aug 25, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 1513 PASADENA DR, AUSTIN |
Electrical | Aug 25, 2026 | 1 | Subscribers |
| Replacing cast iron sewer line under the pier and beam house about 60 ft and in the yard line about 75ft with new PVC material | 1116 MISSION RIDGE, AUSTIN |
Plumbing | Aug 25, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work | 8108 MAUAI DR, AUSTIN |
Mechanical | Aug 25, 2026 | 1 | Subscribers |