| Replacement of complete existing central heat and air system with or without duct work | 12600 RESEARCH BLVD SVRD SB, AUSTIN |
Mechanical | May 19, 2026 | 1 | Subscribers |
| removing the old gas tank style water heater to install a gas tankless water heater | 1001 LORRAIN ST, AUSTIN |
Plumbing | May 19, 2026 | 1 | Subscribers |
| Replacement of an existing water heater Replace 40 Gallon Natural Gas Water Heater | 10605 CALIFORNIA CV, AUSTIN |
Plumbing | May 19, 2026 | 1 | Subscribers |
| Porch enclosure | 5605 CRAGGY PT, AUSTIN |
Other | May 19, 2026 | 1 | Under $250,000 |
| EXPRESS: Foundation repair | 3005 NORFOLK DR, AUSTIN |
Other | May 19, 2026 | 1 | Under $250,000 |
| We plan to install irrigation to water the new plantings for the William Cannon Corridor project. We are looking for the commercial irrigati | 7003 1/2 E WILLIAM CANNON DR, AUSTIN |
Plumbing | May 19, 2026 | 1 | Subscribers |
| ePlan: Residential Expedited Review - Interior Remodel and Addition to Existing 2-Story Single Family Res. Work to include Third Floor Addit | 1805 INTERVAIL DR, AUSTIN |
Other | May 19, 2026 | 1 | Under $250,000 |
| Total demo of SFR 1680 sq ft circa 1963 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notifi | 2115 W 12TH ST, AUSTIN |
Demolition | May 19, 2026 | 1 | Subscribers |
| Express: Foundation repair - 14 perimeter piers and 6-8 new interior piles installed | 1503 CLIFFSIDE DR, AUSTIN |
Other | May 19, 2026 | 1 | Under $250,000 |
| Install Level 2 EV Charger | 504 ACADEMY DR, AUSTIN |
Electrical | May 19, 2026 | 1 | Subscribers |
| Total demo of 4353 SqFt SFR circa 1960 | 3706 EASTLEDGE DR, AUSTIN |
Demolition | May 19, 2026 | 1 | Subscribers |
| reference 2011-095802 W Commercial irrigation work at COTALAND/COTA campus. Install/modify irrigation lines valves heads/drip irrigation con | 9517 1/2 CIRCUIT OF THE AMERICAS BLVD, AUSTIN |
Plumbing | May 19, 2026 | 1 | Subscribers |
| Replacement of an existing water heater Replacement of 50 Gl. NG Water Heater Like for Like | 3309 SILKGRASS BND, AUSTIN |
Plumbing | May 19, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work Install replacement of 3.5 Ton AC System and Repair O | 201 NATALI ST, AUSTIN |
Mechanical | May 19, 2026 | 1 | Subscribers |
| Rip and replace fiber optic cable on cell tower ground cabinets trenching for new conduit. | 9700 1/2 N CAPITAL OF TEXAS HWY SB, AUSTIN |
Other | May 19, 2026 | 1 | Under $250,000 |
| Interior Remodel: Interior renovation to update all bathrooms and kitchen including replacement of surface materials such as drywall tile fl | 411 W 34TH ST, AUSTIN |
Other | May 19, 2026 | 1 | Under $250,000 |
| Total demo of SFR 768 sq ft circa 1951 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notific | 2113 W 12TH ST, AUSTIN |
Demolition | May 19, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work | 6605 BLUESKY WAY, AUSTIN |
Mechanical | May 19, 2026 | 1 | Subscribers |
| 45 tunnel below the foundation to replace the kitchen and laundry drain lines. Access hole in back | 4710 FRONTIER TRL, AUSTIN |
Plumbing | May 19, 2026 | 1 | Subscribers |
| ***Timed Virtual Inspection: 06/03/2026 @ 11 AM*** Replacement of complete existing central heat and air system with or without duct work | 6208 CAT MOUNTAIN CV, AUSTIN |
Mechanical | May 19, 2026 | 1 | Subscribers |
| Install Level 2 EV Charger | 7161 RIDGE OAK RD, AUSTIN |
Electrical | May 19, 2026 | 1 | Subscribers |
| New construction in-ground pool and spa. | 4017 AVENUE H, AUSTIN |
Other | May 19, 2026 | 3 | Subscribers |
| Express: tub to shower conversion replace exhaust fan | 1215 INKS AVE, AUSTIN |
Other | May 19, 2026 | 3 | Under $250,000 |
| ePlan: Residential Expedited Review - New Construction of a 2-Story Single Family Res. [4bed 4bath] with attached garage | 1207 DWYCE DR, AUSTIN |
Other | May 19, 2026 | 2 | Subscribers |
| Temp Power Crane - Temporary Transformer 800 Amps Please reference permit 2026-035287 EP | 9203 1/2 CIRCUIT OF THE AMERICAS BLVD UNIT TEMP2, DEL VALLE |
Electrical | May 19, 2026 | 2 | Subscribers |
| Interior remodel to existing business admin office. Access Control requested. | 4301 WESTBANK DR BLDG B UNIT 350, AUSTIN |
Plumbing | May 19, 2026 | 3 | Subscribers |
| Installation of a new Generac generator and 200amp service rated automatic transfer switch. Austin Energy disconnect will be needed. (Tina S | 6003 TWIN VALLEY CV, AUSTIN |
Electrical | May 19, 2026 | 2 | Subscribers |
| RE ROOF. REMOVE CURRENT ROOF SYSTEM REPLACE WITH NEW BALLAST ROOF SYSTEM - OVA | 8834 N CAPITAL OF TEXAS HWY SB, AUSTIN |
Major renovation | May 19, 2026 | 1 | Under $250,000 |
| ePlan: Residential Expedited Review - New TWO UNIT RES. Bldg 1 New construction of a 2-Story Single Family Res. [4bed 4.5bath] | 2012 GOODRICH AVE BLDG 1, AUSTIN |
Other | May 19, 2026 | 6 | Subscribers |
| interior non structural demolition | 1900 BARTON SPRINGS RD BLDG 1 UNIT 1005, AUSTIN |
Demolition | May 19, 2026 | 1 | Subscribers |