| 100/125 amp panel grounding and bonding | 12331 DEERBROOK TRL, AUSTIN |
Electrical | Oct 6, 2026 | 1 | Subscribers |
| EPLAN - Remodel office and break area - 4th Floor | 6433 CHAMPION GRANDVIEW WAY BLDG 1, AUSTIN |
Major renovation | Oct 6, 2026 | 4 | Under $250,000 |
| Abandon the existing grease interceptor and install new one no relocation. | 9414 N LAMAR BLVD, AUSTIN |
Plumbing | Oct 6, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work | 3505 MOUNT BARKER DR, AUSTIN |
Mechanical | Oct 6, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work | 4213 CAMACHO ST, AUSTIN |
Mechanical | Oct 6, 2026 | 1 | Subscribers |
| 200 amp panel 200amp meter base grounding | 2419 TRAIL OF MADRONES, AUSTIN |
Electrical | Oct 6, 2026 | 1 | Subscribers |
| Tub to Shower Replacement (prefab base) in the same location. | 9416 LINKMEADOW DR, AUSTIN |
Other | Oct 6, 2026 | 2 | Under $250,000 |
| Total demo of single-story SFR 654 sq ft circa 1974 ***The building shall not be demolished until after the contractor has fulfilled the nei | 7506 SHADYWOOD DR, AUSTIN |
Demolition | Oct 6, 2026 | 1 | Subscribers |
| Replacement of complete existing central heat and air system with or without duct work hvac change out | 10616 ROY BUTLER DR, AUSTIN |
Mechanical | Oct 6, 2026 | 1 | Subscribers |
| Express: Foundation repair Installing 11 Steel Piers and 1 Exterior breakout. | 6001 RANDLEMAN DR, AUSTIN |
Roofing and exterior | Oct 6, 2026 | 1 | Under $250,000 |
| EXPRESS: Removal of limited drywall for internal wall construction review removal of flooring trim inspection of subfloor inspection of exis | 6805 ROCKLEDGE CV, AUSTIN |
Other | Oct 6, 2026 | 1 | Under $250,000 |
| Per Tx Gas they want us to relocate the gas meter 15 away from hazardous confined space and window opening. | 1903 CANNONWOOD LN, AUSTIN |
Plumbing | Oct 6, 2026 | 1 | Subscribers |
| Total Demo of SFR 1528 sqft circa 1956 | 3413 PECAN SPRINGS RD, AUSTIN |
Demolition | Oct 6, 2026 | 1 | Subscribers |
| Express: Foundation repair (21 exterior pilings) | 12414 THOMPKINS DR, AUSTIN |
Roofing and exterior | Oct 6, 2026 | 1 | Under $250,000 |
| Replacement of complete existing central heat and air system with or without duct work | 308 W 39TH ST, AUSTIN |
Mechanical | Oct 6, 2026 | 1 | Subscribers |
| Repair electrical service from vandals that stripped the wire and service off our Billboard | 9127 1/2 N IH 35 SVRD NB, AUSTIN |
Electrical | Oct 6, 2026 | 1 | Subscribers |
| Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be two acce | 2402 ELMGLEN DR, AUSTIN |
Plumbing | Oct 6, 2026 | 1 | Subscribers |
| INTERIOR REMODEL - EXISTING OFFICE SPACE DEMO FINISHES AND MEP AS SHOWN ON THE PLANS. | 6300 BRIDGE POINT PKWY BLDG 1 UNIT 200, AUSTIN |
Major renovation | Oct 6, 2026 | 1 | Subscribers |
| installing a whole home standby generator with an automatic transfer switch upgrading meter can to 200amp (underground) PEC meter | 9313 MUSKBERRY CV, AUSTIN |
Electrical | Oct 6, 2026 | 2 | Subscribers |
| Excavate 20 to repair break in the yard line | 903 CARDIFF DR, AUSTIN |
Plumbing | Oct 6, 2026 | 1 | Subscribers |
| The scope of work is for the installation of the on-site fire line piping. Ref: SP-2024-0350C | 2901 DEL CURTO RD, AUSTIN |
Plumbing | Oct 6, 2026 | 1 | Subscribers |
| Express: Foundation repair - installing 14 exterior & 7 interior pilings | 7109 OUTFITTER DR, AUSTIN |
Roofing and exterior | Oct 6, 2026 | 1 | Under $250,000 |
| Express- Install 16 push piers | 7120 MUMRUFFIN LN, AUSTIN |
Other | Oct 6, 2026 | 1 | Under $250,000 |
| Run new gas line drop off left side of building roof for new Texas Gas Meter Set. Connected into existing rooftop gas line with tee and isol | 4109 S CAPITAL OF TEXAS HWY NB, AUSTIN |
Plumbing | Oct 6, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 8802 MERIDIAN OAK LN, AUSTIN |
Electrical | Oct 6, 2026 | 1 | Subscribers |
| ETJ. BASE: Installing a backup battery system and additional meter socket. | 15101 FALCON DR, LAKEWAY |
Electrical | Oct 6, 2026 | 1 | Subscribers |
| BASE: Installing a backup battery system and additional meter socket. | 2014 PEQUENO ST, AUSTIN |
Electrical | Oct 6, 2026 | 1 | Subscribers |
| Total demo of 2493 SqFt SFR circa 1939 | 2207 MOUNTAIN VIEW RD, AUSTIN |
Demolition | Oct 6, 2026 | 1 | Subscribers |
| Remodel/addition to existing unit within a three unit residential site at 2210 willow street. Work shown includes removal of the non complyi | 2210 WILLOW ST BLDG 1, AUSTIN |
Other | Oct 6, 2026 | 1 | Under $250,000 |
| Interior Remodel of 1-story residence conversion of front office to open living space. Repair fire damaged components. | 3112 LYNRIDGE DR, AUSTIN |
Other | Oct 6, 2026 | 1 | Under $250,000 |