| Remove and replace approximately 40 feet of the existing 4-foot-wide sidewalk along the front of the property. The existing concrete will be | 6111 PENROSE AVE, Dallas |
Demolition | Sep 23, 2026 | 1 | Subscribers |
| 8 1/2' wood fence on steel posts | 9026 LEASIDE DR, Dallas |
Other | Sep 23, 2026 | 1 | Subscribers |
| NSFAA 14'3" x 20' Metal structure roof with tongue and groove ceiling, Use of skylifts to support the roof as shown in plans. | 3360 VALIANT DR, Dallas |
Major renovation | Sep 23, 2026 | 1 | Subscribers |
| MCR Install 27 panels roof mounted PV solar system | 2934 RAMSEY AVE, Dallas |
Roofing and exterior | Sep 23, 2026 | 2 | Subscribers |
| NSFAA Complete work from previous contractor: Permit # RES-ALT-ADD-25-001266 | 9703 WINDING RIDGE DR, Dallas |
Major renovation | Sep 23, 2026 | 1 | Subscribers |
| Replace existing 8 foot fence with an 8 foot fence. Exact same footprint, no change at all to the layout of the fence. | 12136 CROSS CREEK DR, Dallas |
Other | Sep 23, 2026 | 1 | Subscribers |
| Demolish approx. 3,000 sq ft single family home remove all existing slab. | 4426 GLOSTER RD, Dallas |
Demolition | Sep 23, 2026 | 1 | Subscribers |
| Install power run from point of connection to Network Node DA04001-A in Row. Exact Coordinates: 32.701099, -96.823820. | 109 W OVERTON RD, Dallas |
Electrical | Sep 23, 2026 | 1 | Subscribers |
| Demolish single family homes approx. 900 SFremoving all existing slab. | 3111 GULDEN LN, Dallas |
Demolition | Sep 23, 2026 | 1 | Subscribers |
| MCR Build approximately 4 feet of wall, reducing suite to 2,403 RSF. No other work to be performed under this permit. No MEP work required | 325 N ST PAUL ST, Dallas |
Major renovation | Sep 23, 2026 | 1 | Subscribers |
| FOUNDATION REPAIR: Install 7 piers, proof & repressurize 3 existing piers | 4607 CREEKMEADOW DR, Dallas |
Roofing and exterior | Sep 23, 2026 | 1 | Subscribers |
| NSFAA Install 480 sqft. patio cover with lighting and fans. | 9941 KINGSWAY AVE, Dallas |
Major renovation | Sep 23, 2026 | 1 | Subscribers |
| MCR New pool & spa | 4620 MELISSA LN, Dallas |
Other | Sep 23, 2026 | 1 | Subscribers |
| residential roof replacement | 6212 ELLSWORTH AVE, Dallas |
Roofing and exterior | Sep 23, 2026 | 1 | Subscribers |
| RSVP - NEW SFD | 6514 ROYAL LN, Dallas |
Other | Sep 23, 2026 | 1 | Subscribers |
| MCR Interior remodel to combine two existing suites into Suite 850. The expansion area will include two new offices and one conference room. | 3131 MCKINNEY AVE, Dallas |
Major renovation | Sep 23, 2026 | 1 | Subscribers |
| I am replacing the roof, we have 2 leaks | 2906 IVANDELL AVE, Dallas |
Roofing and exterior | Sep 23, 2026 | 1 | Subscribers |
| MCR Scope of Work:renovation with additional offices and finish refresh | 3001 HACKBERRY RD, Dallas |
Major renovation | Sep 23, 2026 | 1 | Subscribers |
| MCR construct gunite pool / spa | 6924 REDSTART LN, Dallas |
Other | Sep 23, 2026 | 1 | Subscribers |
| Replace (1) 50 gal electric water heater **This permit authorizes work only for the approved trade. Construction, erection, or alteration of | 6777 W KIEST BLVD, Dallas |
Plumbing | Sep 23, 2026 | 1 | Subscribers |
| Replacement of all HVAC equipment. buildings 1,2,3,4 | 2696 BICKERS ST, Dallas |
Mechanical | Sep 23, 2026 | 1 | Subscribers |
| Install 27 pilings | 9510 FROSTWOOD ST, Dallas |
Other | Sep 23, 2026 | 1 | Subscribers |
| Loop 12/Walton Walker Blvd Lighting Improvements from SPUR 408 to Country Creek Drive - Project # CIZ25-TRN-3166 need inspection on Electric | 2441 S LEDBETTER DR, Dallas |
Electrical | Sep 23, 2026 | 1 | Subscribers |
| Loop 12/Walton Walker Blvd Lighting Improvements from SPUR 408 to Country Creek Drive - Project # CIZ25-TRN-3166 need inspection on Electric | 3394 MORSE DR, Dallas |
Electrical | Sep 23, 2026 | 1 | Subscribers |
| Remove and replace two existing 2-inch backflow prevention assemblies serving the domestic water system, located at Buildings 1 and 25. Inst | 18081 MIDWAY RD, Dallas |
Plumbing | Sep 23, 2026 | 2 | Subscribers |
| MCR THE SCOPE OF THIS PROJECT IS A NON-STRUCTURAL INTERIOR FINISH-OUT IN AN EXISTING SINGLE FLOOR SUITE. SCOPE INCLUDES HVAC, ELECTRICAL, PL | 5910 N CENTRAL EXPY, Dallas |
Major renovation | Sep 23, 2026 | 1 | Subscribers |
| MCR Constructed a full-height interior partition wall to divide the existing suite into two separate functional areas. The installation incl | 8300 LA PRADA DR, Dallas |
Major renovation | Sep 23, 2026 | 1 | Subscribers |
| F 26F - TRUSS FOR JUICY | 1500 1ST AVE, Dallas |
Major renovation | Sep 23, 2026 | 1 | Subscribers |
| NSFAA-New Residential Single Family | 7510 KENWELL ST, Dallas |
Other | Sep 23, 2026 | 1 | Subscribers |
| COMPLETE ROOFING | 515 WOODMONT DR, Dallas |
Roofing and exterior | Sep 23, 2026 | 1 | Subscribers |