| NSFAA-Remodeling 2 car garage. | 4610 CATINA LN, Dallas |
Major renovation | Aug 24, 2026 | 1 | Subscribers |
| MCR Remodel of existing 2nd floor office space. Install new partition walls to construct new conference room, touch down room, waiting area | 9797 ROMBAUER RD, Dallas |
Major renovation | Aug 24, 2026 | 1 | Subscribers |
| It is recommended at the home to install steel shims and beams. | 9639 BRENTGATE DR, Dallas |
Other | Aug 24, 2026 | 1 | Subscribers |
| Demolish Existing House & Foundation System Down To Dirt; Remove Piers 2' Below Existing Grade. Remove Concrete Driveway Up To Approach Remo | 4506 ST LANDRY DR, Dallas |
Demolition | Aug 24, 2026 | 1 | Subscribers |
| Demolish existing house and foundation to dirt; remove piers 2' below existing grade. Remove concrete driveway up to approach.Remove Stone P | 568 COOLAIR DR, Dallas |
Demolition | Aug 24, 2026 | 1 | Subscribers |
| Installation of a 24kW standby generator with 200A ATS and natural gas connections. | 6993 BOB O LINK DR, Dallas |
Electrical | Aug 24, 2026 | 2 | Subscribers |
| Apply for drive approach for 2204 Lovedale unit 1-5 | 2204 LOVEDALE AVE, Dallas |
Other | Aug 24, 2026 | 1 | Subscribers |
| QTEAM INHOUSE - Reconfigure admin office at MCD Heart & Spine hospital to construct a 200 SF chapel. No scope of work is anticipated for smo | 11970 N CENTRAL EXPY, Dallas |
Major renovation | Aug 24, 2026 | 1 | Subscribers |
| Install 12 total pilings (8 exterior, 4 exterior with concrete breakouts) (7 pilings are optional). | 1306 FOLEY ST, Dallas |
Roofing and exterior | Aug 24, 2026 | 1 | Subscribers |
| driveway approach | 4511 ISABELLA LN, Dallas |
Other | Aug 24, 2026 | 1 | Subscribers |
| NSFAA FAST-TRACK8411 Enzo Court36 B/7862V22H J20 | 8411 ENZO CT, Dallas |
Other | Aug 24, 2026 | 1 | Subscribers |
| MCR demo walls and doors and add new ones. Adjust other items accordingly. | 12770 COIT RD, Dallas |
Major renovation | Aug 24, 2026 | 1 | Subscribers |
| NSFAA-proposed detached storage | 820 MELBA ST, Dallas |
Major renovation | Aug 24, 2026 | 1 | Subscribers |
| #105 Finish Out - NEW 18, 115 SQ FT BUILDING | 10830 HARRY HINES BLVD, Dallas |
New commercial construction | Aug 24, 2026 | 1 | Subscribers |
| #115 Finish Out - NEW 18, 115 SQ FT BUILDING | 10830 HARRY HINES BLVD, Dallas |
New commercial construction | Aug 24, 2026 | 1 | Subscribers |
| RP 5 F - FUTERIA INSTALL PLUMBING FOR CONCESSION STAND | 1200 RIOS PATH, Dallas |
Plumbing | Aug 24, 2026 | 2 | Subscribers |
| MCR Office expansion same use | 5910 N CENTRAL EXPY, Dallas |
Major renovation | Aug 24, 2026 | 1 | Subscribers |
| Remove roof down to decking, replace with synthetic felt, self-adhering valley liner, and architectural shingles | 10750 WELCH RD, Dallas |
Roofing and exterior | Aug 24, 2026 | 1 | Subscribers |
| NSFAA 1. Replaced existing sheetrock throughout the house as needed due to mold remediation and to modernize the wall texture.2. Replaced de | 4310 BOCA BAY DR, Dallas |
Major renovation | Aug 24, 2026 | 2 | Subscribers |
| MCR 9247 SKILLMAN STE 107 -VACANT FLOOR PLAN- PER PLAN AND NEW DOM WATER LATERAL WITH METER INSTALLATION TO WHITEBOX | 9247 SKILLMAN ST, Dallas |
Major renovation | Aug 24, 2026 | 1 | Subscribers |
| demo to remove slab and approach for new construction | 10120 HARRY HINES BLVD, Dallas |
Demolition | Aug 24, 2026 | 1 | Subscribers |
| QTEAM PROJECT SCOPE IS LIMITED TO THE INTERIOR IMPROVEMENT OF AN EXISTING VOID SPACE TO CREATE A VIP ROOM WITHIN THE TENANT SPACEPREVIOUSLY | 13550 DALLAS PKWY, Dallas |
Major renovation | Aug 24, 2026 | 1 | Subscribers |
| Apt 5201 Changeout existing system & install 2 ton split system | 2929 KINGS RD, Dallas |
Mechanical | Aug 24, 2026 | 2 | Subscribers |
| Apt 334 Changeout existing system & install 1.5 ton split system | 7440 LA VISTA DR, Dallas |
Mechanical | Aug 24, 2026 | 2 | Subscribers |
| MCR Commercial remodel | 2101 CEDAR SPRINGS RD, Dallas |
Major renovation | Aug 24, 2026 | 1 | Subscribers |
| Electrical for Bathroom Remodel | 2331 GLENGARIFF DR, Dallas |
Electrical | Aug 24, 2026 | 2 | Subscribers |
| MCR Combine Suite 302 into Suite 315 by removing the demising wall and building a new office. Alter existing offices to allow hallway in new | 6510 ABRAMS RD, Dallas |
Major renovation | Aug 24, 2026 | 1 | Subscribers |
| NSFAA It's Duplex tear down existing framing, complete renovation in both units. Exterior walls to stay. | 3731 W BEVERLY DR, Dallas |
Major renovation | Aug 24, 2026 | 4 | Subscribers |
| NSFAA CONSTRUCTION OF AN ATTACHED PATIO COVER AT THE REAR OF HOME TO INCLUDE CONCRETE AND ELECTRICAL. | 8554 SAN PEDRO PKWY, Dallas |
Major renovation | Aug 24, 2026 | 2 | Subscribers |
| COMMERCIAL REMODEL OF EXISTING SPACE | 700 N PEARL ST, Dallas |
Major renovation | Aug 24, 2026 | 1 | Subscribers |