| Erie to remove existing roofing and properly dispose. Erie to furnish and install ice and water shield where applicable. Erie to furnish and | 3306 BELLINGHAM CT, Dallas |
Roofing and exterior | Oct 9, 2026 | 1 | Subscribers |
| Install approx. 58 linear feet of 8ft tall cedar picket fence with galvanized steel posts and one walk gate. | 6638 LAKESHORE DR, Dallas |
Other | Oct 9, 2026 | 1 | Subscribers |
| 7309 Glendora install 13 concrete pilings to stabilize foundation | 7309 GLENDORA AVE, Dallas |
Other | Oct 9, 2026 | 1 | Subscribers |
| Reconnect, hot and cold waterlines to boiler cold water on the inlet and hot water on the outlet inch and a quarter copper pipe | 5421 BRYAN ST, Dallas |
Plumbing | Oct 9, 2026 | 1 | Subscribers |
| Foundation repair | 4216 HIGH SUMMIT DR, Dallas |
Other | Oct 9, 2026 | 1 | Subscribers |
| RSVP-This is a residential new construction project consisting of a 1,356-square-foot house, a 44-square-foot front porch, and a 25-square-f | 10111 LANEYVALE AVE, Dallas |
Demolition | Oct 9, 2026 | 1 | Subscribers |
| 3815 O B Crowe install 6 concrete pilings to stabilize foundation | 3815 O B CROWE DR, Dallas |
Other | Oct 9, 2026 | 1 | Subscribers |
| install 1" double check on main line | 1606 HINTON ST, Dallas |
Plumbing | Oct 9, 2026 | 1 | Subscribers |
| Atmos shut down the gas meter for a possible leak due to higher-than-normal usage. Atmos was on site on 6/10 and 6/12 outside our normal bus | 6044 SHERRY LN, Dallas |
Plumbing | Oct 9, 2026 | 1 | Subscribers |
| Tear off existing roof and install a composition shingle roof. Remove and replace damaged decking where needed. | 2725 MAVERICK AVE, Dallas |
Roofing and exterior | Oct 9, 2026 | 2 | Subscribers |
| NSFAA - EXTRIOR WALL REPAIR ONLY - NO ADDITION OR INTERIOR REMODEL PERMITTED | 10021 LOSA DR, Dallas |
Major renovation | Oct 9, 2026 | 3 | Subscribers |
| 26kw generac generator | 3851 REGENT DR, Dallas |
Electrical | Oct 9, 2026 | 3 | Subscribers |
| We are installing a wood fence around the duplex | 4611 RUSK AVE, Dallas |
Other | Oct 9, 2026 | 1 | Subscribers |
| 26kw generac generator | 6206 STEFANI DR, Dallas |
Electrical | Oct 9, 2026 | 2 | Subscribers |
| panel change out 200 amp service | 2805 VIRGO LN, Dallas |
Electrical | Oct 9, 2026 | 1 | Subscribers |
| replace 200 amp panel | 2803 VIRGO LN, Dallas |
Electrical | Oct 9, 2026 | 1 | Subscribers |
| NSFAA NEW RESIDENTIAL CONSTRUCTION | 8914 SAN LEANDRO DR, Dallas |
Other | Oct 9, 2026 | 1 | Subscribers |
| Demolition of house. | 10625 LORWOOD DR, Dallas |
Demolition | Oct 9, 2026 | 1 | Subscribers |
| QTEAM MEETING 11.04.26 (9AM) - 2 Story Restaurant in Uptown on McKinney Ave. It is16,297 SF | 4829 MCKINNEY AVE, Dallas |
New commercial construction | Oct 9, 2026 | 1 | Subscribers |
| RESTORATION OF ROOF PITCH NOTHING WILL CHANGE EVERYTHING WILL STAY THE SAME. | 351 W JEFFERSON BLVD, Dallas |
Roofing and exterior | Oct 9, 2026 | 1 | Subscribers |
| Residential full demolition | 1015 KINGS HWY, Dallas |
Demolition | Oct 9, 2026 | 1 | Subscribers |
| NSFAA New Construction SFH \| 3742 Dunhaven Rd | 3742 DUNHAVEN RD, Dallas |
Other | Oct 9, 2026 | 1 | Subscribers |
| NSFAA-Proposed construction of a 6,441 SF, two-story single-family residence with conventional wood-frame construction. The exterior will fe | 11023 PINOCCHIO DR, Dallas |
Roofing and exterior | Oct 9, 2026 | 1 | Subscribers |
| NSFAA-new construction home 4500 sq ft with detach garage | 601 S GLASGOW DR, Dallas |
Other | Oct 9, 2026 | 1 | Subscribers |
| NSFAA-ADD/REM Demolition & Site PreparationExterior Wall Alterations: Select selective demo of exterior wall portions to open connections fo | 5318 W MOCKINGBIRD LN, Dallas |
Major renovation | Oct 9, 2026 | 1 | Subscribers |
| MCR Address: 2323 Cedar Springs Rd #11th Floor Corridor First time finishout | 2323 CEDAR SPRINGS RD, Dallas |
Major renovation | Oct 9, 2026 | 1 | Subscribers |
| NSFAA There was a fire at my home and i need to make the following repairs: Sheetrock, New Windows, part of the roof that was damaged. | 4607 S EWING AVE, Dallas |
Major renovation | Oct 9, 2026 | 1 | Subscribers |
| QTEAM PROJECT - EXISITING SPACE, NEW TENANT MERCANTILE MATTRESS STORE INTERIOR ALTERATION TO INCLUDE NEW WALLS FINISHES, FIXTURES, AND PAINT | 6025 ROYAL LN, Dallas |
Major renovation | Oct 9, 2026 | 4 | Subscribers |
| MCR W/BATTERY Victoria Lloyd - Installation of a Grid Tied, Roof Mounted, Solar PV System with an energy storage system | 7322 SECO BLVD, Dallas |
Roofing and exterior | Oct 9, 2026 | 2 | Subscribers |
| Remove and disposed old shingles with felt, Install synthetic roof underlayment, Remove and replace all pipe boots, Reroof with Owens Cornin | 2939 ALLISTER ST, Dallas |
Roofing and exterior | Oct 9, 2026 | 1 | Subscribers |