| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Vehicle Charging Station) | 4645 163rd Pl SE, Bellevue |
Electrical | May 12, 2026 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Subpanel, 1 Receptacles, 2 Added or Altered Bra | 15321 SE 23rd St, Bellevue |
Electrical | May 12, 2026 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement None Project Involving (1 Furnace <= 100,000 BTU) | 2749 165th Ave NE, Bellevue |
Mechanical | May 12, 2026 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Service Change 126-200 amps, 1 Subpanel) | 430 128th Ave SE, Bellevue |
Electrical | May 12, 2026 | 1 | Subscribers |
| A Single Family Residential Addition to Existing Structure Electrical Project Involving (1 Service Change 126-200 amps, 1 Range or Oven, 1 A | 16509 Lake Hills Blvd, Bellevue |
Electrical | May 12, 2026 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Air Conditioner, 1 Heat Pump, 1 Furnace) | 16305 SE Phantom Way, Bellevue |
Electrical | May 12, 2026 | 2 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Dishwasher, 1 Range or Oven, 2 Light Fixtures, | 3216 142nd Pl NE, Bellevue |
Electrical | May 12, 2026 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Generator - Outside) | 5233 Pleasure Point Ln, Bellevue |
Electrical | May 12, 2026 | 1 | Subscribers |
| A Single Family Residential Reroofing Residence Project Involving (1 Roof Rafters or Trusses 24" on center, 1 Plywood or OSB 1/2", 1 Torchdo | 5636 129th Ave SE, Bellevue |
Major renovation | May 12, 2026 | 1 | Subscribers |
| A Single Family Residential Utility Modification Side Sewer Repair Only | 10431 SE 25th St, Bellevue |
Plumbing | May 12, 2026 | 1 | Subscribers |
| A Single Family Residential Repair or Replacement Electrical Project Involving (1 Feeder) | 3019 109th Ave SE, Bellevue |
Electrical | May 12, 2026 | 1 | Subscribers |
| A Nonresidential Repair or Replacement Project Installing {1-Panel} Inspection only per Mike Bearda PSE panel inspection to turn power back | 14950 SE Allen Rd, Bellevue |
Electrical | May 12, 2026 | 1 | Subscribers |
| A Single Family Condo Unit Alteration to Existing Structure Electrical Project Involving (1 Receptacles, 1 Added or Altered Branch Circuits) | 1623 102nd Pl NE - Unit A-2, Bellevue |
Electrical | May 12, 2026 | 1 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Air Conditioner, 1 Furnace, 2 Added or Altered | 14201 SE 51st St, Bellevue |
Electrical | May 12, 2026 | 2 | Subscribers |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (2 Small Kitchen Appliance, 110 Dishwasher, 1 Rang | 2404 W Lake Sammamish Pkwy SE, Bellevue |
Electrical | May 12, 2026 | 1 | Subscribers |
| INSTALL (1) DOUBLE DETECTOR CHECK VALVE, (2) DRY SPRINKLER SYSTEM SUPPLYING THE UNHEATED PARKING GARAGE, (1) CLASS I MANUAL WET STANDPIPE SY | 1125 102nd Ave NE - Unit site, Bellevue |
Other | May 12, 2026 | 1 | Subscribers |
| Install NFPA 13D Multipurpose Piping Sprinkler System, 25-104885 BS | 4676 143rd Pl NE, Bellevue |
Other | May 12, 2026 | 2 | Subscribers |
| Site Construction, 012601-002 | 11040 Main St, Bellevue |
Other | May 12, 2026 | 1 | Subscribers |
| REFACE TWO EXISITNG FREESTANDING SIGNS AND INSTALL TWO SINGLE FACE ILLUMINATED WALL SIGNS | 10550 NE 8th St, Bellevue |
Other | May 12, 2026 | 1 | Under $250,000 |
| Pull fiber through existing conduit at (2) locations. On 106th Ave NE , south of NE 8th Ave, Start at existing Zayo Vault in southbound lane | 788 106th Ave NE, Bellevue |
Other | May 12, 2026 | 1 | Subscribers |
| A Single Family Residential Remodel Residence Project Involving (Family Room) | 16828 NE 18th St, Bellevue |
Major renovation | May 12, 2026 | 2 | Subscribers |
| INTERIOR ONLY TENANT IMPROVEMENT OF FLOOR 20 WHICH WILL COMBINE THREE EXISTING SUITES INTO ONE. THE SCOPE OF WORK WILL INCLUDE BUT IS NOT LI | 777 108th Ave NE, Bellevue |
Major renovation | May 12, 2026 | 1 | $1 to $5 million |
| Irrigation service for new multifamily building, 23 110801 do not drop in meter until inspector gives approval. | 383 111th Ave NE, Bellevue |
New commercial construction | May 12, 2026 | 1 | Subscribers |
| INTERRIOR REMODEL. REPLACEMENT OF KITCHEN CABINETS. REPLACEMENT OF WALL WITH BEAM. **Add on mechanical** | 12623 NE 28th St, Bellevue |
Other | May 12, 2026 | 4 | Under $250,000 |
| A Single Family Residential Alteration to Existing Structure Electrical Project Involving (1 Panel, 1 Air Conditioner, 2 Light Fixtures, 1 A | 12926 SE 44th Ct, Bellevue |
Electrical | May 12, 2026 | 2 | Subscribers |
| Sierra construction is building a new 351 unit apartment building at 11040 Main Street Bellevue WA 98004 and is utilizing the 100 112th AVE | 100 112th Ave NE, Bellevue |
New commercial construction | May 12, 2026 | 3 | Subscribers |
| Replace existing 3/4" service with 1" | 2626 Evergreen Point Rd, Medina |
Other | May 12, 2026 | 2 | Subscribers |
| Approved for Finals Only by Tom Miller, previous permit - 18 123812 BS. Building inspection. Permit to continue and complete construction of | 3260 140th Ave NE, Bellevue |
Major renovation | May 12, 2026 | 3 | Subscribers |
| A Single Family Condo Unit Repair or Replacement None Project Involving (1 Water Heater Electric < 60 gallons) | 17050 Northup Way - Unit 23, Bellevue |
Plumbing | May 12, 2026 | 3 | Subscribers |
| 13D fire suppression system | 1453 158th Ct SE, Bellevue |
Other | May 12, 2026 | 2 | Subscribers |