| The Eastgate Way Non-Motorized Access to Transit project will enhance mobility across all modes. Work under this contract includes Spot pave | 15000 SE Eastgate Way, Bellevue |
Major renovation | Aug 13, 2026 | 1 | Subscribers |
| Remove existing asphalt concrete pavement, excavate existing foundation. Install geofoam blocks at 5269 Lakemont Blvd SE and install geotext | 5157 Lakemont Blvd SE, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| Remove and replace existing rockery with gravity block wall. Remove existing cement concrete curb, asphalt walkway, driveway approach, and d | 4103 151st Ave SE, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| This project will retrofit existing concrete curb ramps with ADA compliant concrete curb ramps. There will then be a grind and overlay of th | 11101 NE 38th Pl, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| The corridor improvement project is intended to provide a consistent 4' shoulder on the east side, a 10.5' northbound vehicle travel lane, a | 103 W Lake Sammamish Pkwy NE, Bellevue |
Major renovation | Aug 13, 2026 | 1 | Subscribers |
| This project will replace the existing stop-controlled intersection at 164th Ave SE and SE Newport Way with a mini-roundabout. The | 16319 SE Newport Way, Bellevue |
Mechanical | Aug 13, 2026 | 1 | Subscribers |
| This project will install sidewalk and landscaping planter on the west side of 138th Ave SE between SE Allen Road and SE 40th Street includi | 13630 SE Allen Rd, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| This project will convert the 100th Ave NE & NE 10th St intersection to a single-lane mini-roundabout, replacing the current all-way stop co | 912 100th Ave NE - Unit site, Bellevue |
Major renovation | Aug 13, 2026 | 1 | Subscribers |
| The project will construct median island on 100th Ave and extend existing median located on NE 2nd street to the west, up to the AWS interse | 10042 Main St - Unit A-101, Bellevue |
Major renovation | Aug 13, 2026 | 1 | Subscribers |
| This project improves an existing trail in the Crossroads area that connects Northup Way to NE 15 St. The trail is located on existing easem | 15830 NE 15th St, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| Construct sidewalk on south side of SE 16th St. between 160th Ave. SE and SE 16th St. cul-de-sac. Construct raised crosswalk across SE 16th | 1050 160th Ave SE, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| The Bel-Red Rd Overlay project is a component of the City's pavement maintenance program. The project retrofits existing curb ramps with ADA | 12400 NE Bellevue-Redmond Rd - Unit site, Bellevue |
New commercial construction | Aug 13, 2026 | 1 | Subscribers |
| This city project will replace the two existing Seattle City Light High-voltage transmission towers on west side of 124th Ave within the Cit | 1288 123rd Ave NE, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| The 2020 Overlay Program is a component of the City's pavement maintenance program. The project retrofits existing curb ramps with ADA-compl | 10500 NE 24th St, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| The project proposes to remove existing rockeries and replace them with soldier pile walls on SE 40th Street at 140th Avenue SE and on SE Ne | 4004 140th Ave SE, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| This project will extend a 12' wide multi-use trail on the northside of SE 36 St from 132nd Ave SE to 142 Pl SE. The work will also include | 14100 SE 36th St, Bellevue |
New commercial construction | Aug 13, 2026 | 1 | Subscribers |
| This project repaired an existing shoulder on SE 11 St and 97th PL SE that slide during the rain events in February 2020. The shoulder of SE | 9600 SE 11th St, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| This project will construct a soldier pile wall to stabilize the existing slope on the north side of NE 24th Street between 171st Avenue NE | 16910 NE 24th St, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| Clear and Grade for 239 multifamily residential project with 8 stories above grade with 2 stories below grade and parking for 201 stalls is | 1111 108th Ave NE, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| New Plumbing systems for Construction of a new 239 multifamily residential project with 5 stories of Type IIIA construction over 3 stories o | 1111 108th Ave NE, Bellevue |
Plumbing | Aug 13, 2026 | 2 | Subscribers |
| Side sewer work related to the construction of a new single family home per enclosed documents, B-25-041 | 8445 NE 12th St, Medina |
Plumbing | Aug 13, 2026 | 1 | Subscribers |
| modifying front yard and etc. **25 124569 EA** | 6132 125th Ave SE, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| Recovering existing Awnings, 26 110485 SA including blocking parking area | 10149 Main St, Bellevue |
Roofing and exterior | Aug 13, 2026 | 1 | Subscribers |
| Haul Route Only for: Demo of existing structure, clearing grading and utility install, 2610386BE, 26110000UE. 15 lot PUD and Subdivision of | 16035 Northup Way, Bellevue |
Demolition | Aug 13, 2026 | 1 | Subscribers |
| Haul route to remove the decommissioned water reservoir and restore to existing grade & site conditions. Subject to Minor Clearing & Grading | 4657 150th Pl SE, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| SFR26-036 Vick Addition | 8229 128th Ave SE, Newcastle |
Major renovation | Aug 13, 2026 | 1 | Subscribers |
| Remove asphalt shingles down to roof decking, inspect decking and replace as needed. install new underlayment, shingles, flashings and gutte | 13075 SE 26th St, Bellevue |
Major renovation | Aug 13, 2026 | 1 | Under $250,000 |
| Remove asphalt shingles down to roof decking, inspect decking and replace as needed. install new underlayment, shingles, flashings and gutte | 13045 SE 26th St, Bellevue |
Major renovation | Aug 13, 2026 | 1 | Under $250,000 |
| TRAFFIC CONTROL PLAN ASSOCIATED WITH FOUR (4) UNIT RESIDENTIAL DEVELOPMENT., 26 108846 GD 26 111275 BE | 15314 SE Newport Way, Bellevue |
Other | Aug 13, 2026 | 1 | Subscribers |
| Relocate and add new sprinklers per alteration plans Installed per NFPA 13D | 3845 170th Pl NE - Lot 10, Bellevue |
Major renovation | Aug 13, 2026 | 1 | Subscribers |