| 90 to 96 Gas furnace swap | 12516 79TH AV E |
Mechanical | Mar 6, 2026 | 1 | Subscribers |
| Generator Install and ATS | 18012 147TH ST E |
Mechanical | Mar 6, 2026 | 1 | Subscribers |
| Installation of a 26 KW Generator with 2-200 amp auto transfer switches with 2-120 gallon propane tanks | 12404 98TH AVCT NW |
Mechanical | Mar 6, 2026 | 2 | Subscribers |
| Quick Quack Car Wash | 1402 S MERIDIAN, PUYALLUP, WA 98371, Puyallup |
Other | Mar 5, 2026 | 1 | Subscribers |
| Excavate and replace existing private sewer lateral from residence to city sewer connection. Remove deteriorated pipe and install new pvc se | 1523 VISTA DR, PUYALLUP, WA 98372, Puyallup |
Plumbing | Mar 5, 2026 | 1 | Subscribers |
| Larson Dodge | 2001 N MERIDIAN, PUYALLUP, WA 98371, Puyallup |
Other | Mar 5, 2026 | 1 | Subscribers |
| 48 CT Fiber - 1214' Overlash | 711 E 11TH ST, Tacoma |
Other | Mar 5, 2026 | 1 | Under $250,000 |
| New front porch to replace existing front porch at SFD. ** No plumbing or mechanical ** | 3018 N 29TH ST, Tacoma |
Other | Mar 5, 2026 | 1 | Under $250,000 |
| DEMO of the garage to make way for the house addition on the back part of my house. at SFD | 1028 S OXFORD ST, Tacoma |
Demolition | Mar 5, 2026 | 1 | Under $250,000 |
| Replacing Galvanized water line with pex, and replacing portion galvanized drain pipe. Replacement of fixtures | 5425 S M ST # 1, Tacoma |
Plumbing | Mar 5, 2026 | 1 | Under $250,000 |
| Remodel to SFD revise layout to 3 be 2 bath, new roofing, framing, windows and doors. Internal demo completed by previous owner. Finish exis | 2030 S 7TH ST, Tacoma |
Major renovation | Mar 5, 2026 | 1 | Under $250,000 |
| 13D fire sprinkler system at SFD. | 3624 E R ST, Tacoma |
Other | Mar 5, 2026 | 1 | Under $250,000 |
| Like for like replacement of 2 windows, 1 door at SFD. | 2914 N 27TH ST, Tacoma |
Other | Mar 5, 2026 | 1 | Under $250,000 |
| LIKE FOR LIKE AIR HANDLER AND HEAT PUMP CHANGE OUT AT SFD. | 5547 BEVERLY AVE NE, Tacoma |
Mechanical | Mar 5, 2026 | 1 | Under $250,000 |
| Placement of a 300SF office trailer at commercial site | 2810 MARSHALL AVE # B, Tacoma |
New commercial construction | Mar 5, 2026 | 1 | Under $250,000 |
| Remove existing roofing and properly dispose. Furnish and install ice and water shield where applicable. Furnish and install fiberglass dime | 3801 N 18TH ST, Tacoma |
Other | Mar 5, 2026 | 1 | Under $250,000 |
| REPLACE GAS FURNACE LIKE TO LIKE AT SFD. | 3015 S 11TH ST, Tacoma |
Mechanical | Mar 5, 2026 | 2 | Under $250,000 |
| Replace (6) windows like for like, nail fin installation at SFD. No mechanical or plumbing | 8024 E F ST, Tacoma |
Other | Mar 5, 2026 | 1 | Under $250,000 |
| like for like replacement of 5 windows at SFD **No plumbing and No Mechanical** | 5407 N 10TH ST, Tacoma |
Other | Mar 5, 2026 | 1 | Under $250,000 |
| Replacing (2) windows in a like for like sizing manner, no structural modifications to be made at SFD. No mechanical or plumbing | 8445 TACOMA AVE S, Tacoma |
Other | Mar 5, 2026 | 1 | Under $250,000 |
| Gas Furnace and Heat Pump replacement at SFD. | 4628 29TH AVE NE, Tacoma |
Mechanical | Mar 5, 2026 | 2 | Under $250,000 |
| Installation of parking bollards at the front of existing AM/PM convenience store #7061. | 8247 PACIFIC AVE, Tacoma |
Major renovation | Mar 5, 2026 | 1 | Under $250,000 |
| Job #109157518/AHa. Replacing approx 87' of PE & 22' STW DuPont pipe gas main with approx 120' of new 2" MPE gas main along S FERNSIDE DR ne | 1502 S FERNSIDE DR, Tacoma |
Plumbing | Mar 5, 2026 | 1 | Under $250,000 |
| FULL REMODELING 6 UNITS INCLUDING KITCHENS BATHS PAINT, FLOOR REFRESHING, CHANGE DOORS, TRIMS AND SIDING PAINTING IN MULTI-FAMILY/MIXED USE | 5435 S M ST, Tacoma |
Major renovation | Mar 5, 2026 | 1 | $250,000 to $1 million |
| Install FIRE ALARM - ERR type of system - Provide a code compliant ERCES design, material, labor to install and commission at TACOMA SCHOOL | 810 MR DAHL DR, Tacoma |
Other | Mar 5, 2026 | 2 | Under $250,000 |
| Furnace installation | 8706 166TH STCT E |
Mechanical | Mar 5, 2026 | 1 | Subscribers |
| gas furnace replacement | 8908 174TH STCT E |
Mechanical | Mar 5, 2026 | 2 | Subscribers |
| gas furnace replacement/ air conditioner to heat pump replacement | 4615 131ST STCT NW |
Mechanical | Mar 5, 2026 | 1 | Subscribers |
| Commercial Re-roof for Woodland Elementary School | 7707 112TH ST E |
Major renovation | Mar 5, 2026 | 1 | Under $250,000 |
| Tenant Improvement remodel to remove offices and create larger lobby | 17708 28TH AVE E |
Major renovation | Mar 5, 2026 | 1 | Under $250,000 |