| Remove the necessary section of pipe to install a new pressure reducing valve (PRV) at SFD. The pipe will then be re-piped to accommodate th | 1017 E 63RD ST, Tacoma |
Plumbing | Sep 9, 2026 | 1 | Under $250,000 |
| Install 3 pin piles to stabilize the wall at SFD, no change in footprint, no addition. All works will be done on the listed property side, n | 5948 BROAD VIEW AVE NE, Tacoma |
Other | Sep 9, 2026 | 1 | Under $250,000 |
| Demolition of Existing Garage to make way for new Garage with ADU. DADU Permittng: BLDRN26-0289 | 4314 N CHEYENNE ST, Tacoma |
Demolition | Sep 9, 2026 | 1 | Under $250,000 |
| Remove and replace existing 50-gallon electric water heater with 40-gallon electric water heater at SFD. | 4333 S ALDER ST, Tacoma |
Plumbing | Sep 9, 2026 | 1 | Under $250,000 |
| Redeveloping the southerly portion of the container yard at Husky Terminal (work areas WA-7, WA-9, & WA-10). The north and south areas are d | 1001 PORT OF TACOMA RD, Tacoma |
Demolition | Sep 9, 2026 | 1 | $25 to $100 million |
| REPIPE THE WHOLE HOUSE. Contractor is Hart's Plumbing. | 3715 N MADISON ST, Tacoma |
Other | Sep 9, 2026 | 1 | Under $250,000 |
| Reroof at SFD. Remove approx. 14 SQ of asphalt shingles and replace with like materials. Full re-sheet overtops of ship lap with 1/2" OSB wo | 702 S 58TH ST, Tacoma |
Other | Sep 9, 2026 | 1 | Under $250,000 |
| Like for like replacement of 1 patio door at SFD. No mechanical or plumbing | 7203 N 27TH ST, Tacoma |
Other | Sep 9, 2026 | 1 | Under $250,000 |
| Remove and replace (5) windows at SFD. A portion of the interior wall finishes and insulation are to be replaced. No structural work, all wi | 3833 S J ST, Tacoma |
Other | Sep 9, 2026 | 1 | Under $250,000 |
| remove existing heat pump and install new heat pump and air handler at SFD | 920 N FRACE ST, Tacoma |
Mechanical | Sep 9, 2026 | 1 | Under $250,000 |
| Remove and Replace 3 Exhaust Fans, Reconnect Kitchen Hood Range and Install Ductless Heat Pump at Triplex | 4325 E Q ST, Tacoma |
Mechanical | Sep 9, 2026 | 2 | Under $250,000 |
| Onsite improvements associated with UFCW remodel. Exterior improvements include site grading, paving, and utility upgrades, primarily involv | 222 E 26TH ST, Tacoma |
Roofing and exterior | Sep 9, 2026 | 2 | $250,000 to $1 million |
| Site Development associated with construction of new DADU/Garage BLDRN24-0297 - ***INCLUDES UTILITY CONNECTIONS AND EROSION CONTROL PER APPR | 5517 N 45TH ST, Tacoma |
New commercial construction | Sep 9, 2026 | 2 | Under $250,000 |
| Updating and repair of finishes and limited fixtures for shared bathrooms on floors 1, 2, 3 and 4. Work will include: painting walls and cei | 1148 BROADWAY, Tacoma |
Major renovation | Sep 9, 2026 | 2 | Under $250,000 |
| Demolition of 552 sf of exterior deck related to 1048962 and case 78056 | 733 FOX DR |
Demolition | Sep 9, 2026 | 1 | Subscribers |
| Permit for an already constructed covered patio addition to existing MFH | 10513 105TH AVCT |
Other | Sep 9, 2026 | 1 | Under $250,000 |
| Construct 1-story 1296 sq ft detached garage | 6117 254TH STCT E |
Other | Sep 9, 2026 | 1 | Under $250,000 |
| Install equipment (co-locate) on existing 150' cell tower | 2601 304TH ST E |
Major renovation | Sep 9, 2026 | 1 | Under $250,000 |
| Construct 1-story 2-bedroom attached single family residence (senior housing) Base Plan #1037671 | 14623 206TH AVE E |
Other | Sep 9, 2026 | 1 | $250,000 to $1 million |
| gas furnace replacement | 3209 WHITE CLOUD AV NW |
Mechanical | Sep 9, 2026 | 1 | Subscribers |
| gas hot water tank replacement | 19621 84TH AV E |
Plumbing | Sep 9, 2026 | 1 | Subscribers |
| electric hot water tank replacement | 23404 COUNTRY DR E |
Plumbing | Sep 9, 2026 | 1 | Subscribers |
| Replace a gas hot water heater | 1606 195TH STCT E |
Plumbing | Sep 9, 2026 | 1 | Subscribers |
| Tenant Improvement for Camp Murray Joint Force Headquarters in a shell building - BPCO 1073393 (Shell permit #1069802) | 34 AVIATION DR |
Major renovation | Sep 9, 2026 | 3 | $1 to $5 million |
| Water heater replacement like for like | 1619 41ST ST NW |
Plumbing | Sep 9, 2026 | 1 | Subscribers |
| Like for like replacement of furnace and heat pump | 13806 - 13808 107TH AVCT E |
Mechanical | Sep 9, 2026 | 2 | Subscribers |
| replacing a 90 to 90 gas furnace and a heat pump replacement | 2620 71ST AVCT NW |
Mechanical | Sep 9, 2026 | 1 | Subscribers |
| Construct 1-story 2-bedroom attached single family residence (senior housing) Base Plan #1037671 | 14627 206TH AVE E |
Other | Sep 9, 2026 | 1 | $250,000 to $1 million |
| Permit existing 946 sq ft addition/extension - 2 covered patios and existing extensions of kitchen & bedroom in existing single-family resid | 12623 123RD AVE E |
Major renovation | Sep 9, 2026 | 1 | Under $250,000 |
| Like-for-like shower replacement. No drain moves or changes. Utilizing the existing plumbing layout. Cosmetic upgrades only. | 1603 104TH ST S |
Plumbing | Sep 9, 2026 | 1 | Subscribers |