| New 4 zone mini split heat pump **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued vents for fuel | 255 KIOWA PL, BOULDER |
Mechanical | Mar 19, 2026 | 2 | Under $250,000 |
| New swimming pool (432 sf) accessory to an existing single family home | 2955 STANFORD AVE, BOULDER |
Other | Mar 19, 2026 | 2 | Under $250,000 |
| VOID- 180 Days No Activity Water Heater Replacement | 2280 FLORAL DR, BOULDER |
Mechanical | Mar 18, 2026 | 1 | Under $250,000 |
| Remodel Kitchen and Baths as noted; remove 1/2 Bath and associated walls and ceiling joists; associated electrical modifications; swap out h | 300 19TH ST, BOULDER |
Other | Mar 18, 2026 | 1 | Under $250,000 |
| 3277 sf remodel of an existing lab space to meet new program requirements. Project includes the removal of existing walls and doors, as well | 1600 COMMERCE ST, BOULDER |
Major renovation | Mar 18, 2026 | 1 | $250,000 to $1 million |
| VOID- 180 Days No Activity Demo all wall base, flooring, cabinets, counters, and plumbing features and cap. Demo ceiling, remove grid and ti | 2830 VALMONT RD, BOULDER |
Demolition | Mar 18, 2026 | 1 | Subscribers |
| Installation of new NFPA 13D fire sprinkler system with a backflow in an ADU (FSN 13D) | 970 13TH ST B, BOULDER |
Other | Mar 18, 2026 | 1 | Under $250,000 |
| Install 9 helical piers | 3705 MOORHEAD AVE, BOULDER |
Other | Mar 18, 2026 | 1 | Under $250,000 |
| REPLACE EXISTING WATER HEATER WITH LIKE FOR LIKE UNIT **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plasti | 637 S BROADWAY G, BOULDER |
Mechanical | Mar 18, 2026 | 1 | Under $250,000 |
| ADR2025-00187 - Comcast proposes to place directional bore 1,651' to install fiber optic cable **contractor must notify impacted residents 7 | 1360 LEHIGH ST, BOULDER |
Other | Mar 18, 2026 | 1 | Under $250,000 |
| ADR2025-00131 - Comcast proposes to place directional bore 1,500' and proof and pull 1,931' of existing conduit to install fiber optic cable | 2995 GLENWOOD DR, BOULDER |
Roofing and exterior | Mar 18, 2026 | 1 | Under $250,000 |
| Replace Gas Furnace with new CCHP w/ 96% Gas Backup Carier (37MUCHAQ24AA3) Replace 38 Gal Gas Water heater with RHEEM 40 Gal HPWH RHEEM (PRO | 4654 13TH ST, BOULDER |
Mechanical | Mar 18, 2026 | 1 | Under $250,000 |
| ADR2025-00122 - Comcast proposes to place directional bore 1186' to install fiber optic cable **contractor must notify impacted residents 72 | 757 20TH ST, BOULDER |
Other | Mar 18, 2026 | 1 | Under $250,000 |
| Sewer line replacement from the building drain to the tap in the street. Pipebursting from the property line to the tap. (Up to 55' of pipe) | 405 S 39TH ST, BOULDER |
Plumbing | Mar 18, 2026 | 1 | Under $250,000 |
| New Water Line From New 1 Inch Tap To Home, Cap old tap. **contractor must notify impacted residents 72 hrs in advance; no-parks must be pla | 550 13TH ST, BOULDER |
Other | Mar 18, 2026 | 1 | Under $250,000 |
| COMCAST PROPOSES TO PLACE DIRECTIONAL BORE 70 FT TO INSTALL COAX CABLE ROUTE **contractor must notify impacted residents 72 hrs in advance** | 5691 S BOULDER RD, BOULDER |
Other | Mar 18, 2026 | 1 | Under $250,000 |
| Sewer service repair in the yard. | 840 LINDEN AVE, BOULDER |
Plumbing | Mar 18, 2026 | 1 | Subscribers |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 18 squares of TPO shingles on a pitch represented as <2/12. | 2625 ILIFF ST, BOULDER |
Roofing and exterior | Mar 18, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 27 squares of dimensional shingles on a pitch represented as | 890 UNION AVE, BOULDER |
Roofing and exterior | Mar 18, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 18 squares of dimensional shingles on a pitch represented as | 1565 KENDALL DR, BOULDER |
Roofing and exterior | Mar 18, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 22 squares of dimensional shingles on a pitch represented as | 940 POPLAR PL, BOULDER |
Roofing and exterior | Mar 18, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 27 squares of dimensional shingles on a pitch represented as | 4795 HARRISON AVE, BOULDER |
Roofing and exterior | Mar 18, 2026 | 1 | Under $250,000 |
| VOID- 180 Days No Activity **All Structures must be permitted separately** Total tear-off & reroof of SFD, 30.49 squares of dimensional shin | 623 JUNIPER AVE, BOULDER |
Roofing and exterior | Mar 18, 2026 | 1 | Under $250,000 |
| Sewer repair to the city tap **contractor must get approval from Boulder County for ROW portion of job prior to starting work** | 4656 IPSWICH ST, BOULDER |
Plumbing | Mar 18, 2026 | 1 | Subscribers |
| JB0002091276 - OVERLASH 1295' OF 48 CT FIBER AND SPLICE. **contractor must coordinate with Boulder Preparatory High School prior to starting | 5103 WILLIAMS FORK TRL, BOULDER |
Other | Mar 18, 2026 | 1 | Under $250,000 |
| New detached single car garage (378 sf) Associated with HIS2025-00081, DEM2025-00060 and BLD-SFD2025-00304. | 1304 8TH ST, BOULDER |
Other | Mar 18, 2026 | 2 | $1 to $5 million |
| Level 2 alteration of single family home that includes a first floor kitchen remodel (173sf). Second floor remodel of two bathrooms (194sf). | 1590 FINDLAY WAY, BOULDER |
Other | Mar 18, 2026 | 1 | Under $250,000 |
| ***6/22/26 Revision to location of water heater, bike storage locker will be prefab and floor plan layout. See Revision Narrative for detail | 2111 ARAPAHOE AVE, BOULDER |
New commercial construction | Mar 18, 2026 | 1 | $1 to $5 million |
| Illuminated wall sign for East & CO. | 2100 CENTRAL AVE, BOULDER |
Other | Mar 18, 2026 | 1 | Under $250,000 |
| *5/15/26 Revision - Removed ConnectDER Meter Collar Adapter, Added (N) 40A PV breaker, and PV AC Disco now unfused* Install a 7.14kW grid-ti | 3084 PALO PKWY, BOULDER |
Electrical | Mar 18, 2026 | 2 | Under $250,000 |