| **REVISION 7/7/2026- Expand rear addition to include the kitchen. **2/13/2026 Revision to reduce addition of new living space to 25 sf and c | 3195 HEIDELBERG DR, BOULDER |
Major renovation | Mar 17, 2026 | 1 | $250,000 to $1 million |
| **REVISION 6/5/26-Updated plans to show ERV installed per inspector. Specifications provided. Conversion of existing attached garage to cond | 2790 UNIVERSITY HEIGHTS AVE, BOULDER |
Major renovation | Mar 17, 2026 | 1 | Under $250,000 |
| Solar and ESS installation SYSTEM SIZE: 12.32KWDC, 11.50KWAC, 27.00KWHAC · 28 HYUNDAI HiN-T440NF(BK) MODULES · 1 TESLA POWERWALL 3 INVERTER | 955 JASMINE CIR, BOULDER |
Electrical | Mar 17, 2026 | 1 | Under $250,000 |
| Single family home level 2 alteration. First floor includes 396sf of alterations including the kitchen, two bathrooms, a closet and moving t | 1215 BEREA DR, BOULDER |
Other | Mar 17, 2026 | 1 | Under $250,000 |
| Install one egress window. The approval of the code compliant egress window does not imply that the room to which the window has been added | 961 11TH ST, BOULDER |
Other | Mar 17, 2026 | 1 | Under $250,000 |
| Scope of work is the modification to the existing sprinkler system to accommodate a new tenant. There are approx 18 sprinklers. The project | 5863 ARAPAHOE AVE, BOULDER |
Other | Mar 17, 2026 | 1 | Under $250,000 |
| INSTALL ONE NEW STROBE. | 4775 WALNUT ST, BOULDER |
Other | Mar 17, 2026 | 1 | Under $250,000 |
| This is a half of a NFPA#13D single family duplex. There are approx 8 sprinklers per unit and 16 total per duplex (FSN 13D) | 4440 ESPERANZA CT B, BOULDER |
Other | Mar 17, 2026 | 1 | Under $250,000 |
| This is a half of a NFPA#13D single family duplex. There are approx 8 sprinklers per unit and 16 total per duplex (FSN 13D) | 4440 ESPERANZA CT A, BOULDER |
Other | Mar 17, 2026 | 1 | Under $250,000 |
| VOID- 180 Days No Activity Installation of two 20'x30' unenclosed tent and one 20'x50' unenclosed tent for Boulder JCC Cherryvale Summer Day | 6018 OREG AVE, BOULDER |
Other | Mar 17, 2026 | 1 | Subscribers |
| VOID- 180 Days No Activity *3/16/26 Revised site map submitted* Installation of one temporary 50'x50' tent unenclosed and one 20'x30' tent u | 6007 OREG AVE, BOULDER |
Other | Mar 17, 2026 | 1 | Subscribers |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 30 squares of dimensional shingles on a pitch represented as | 530 S 42ND ST, BOULDER |
Roofing and exterior | Mar 17, 2026 | 1 | Under $250,000 |
| Description: Reliable and cost-effective 40-gallon atmospheric vent water heater, ideal for small to medium-sized households. This tradition | 2900 19TH ST, BOULDER |
Mechanical | Mar 17, 2026 | 1 | Under $250,000 |
| RHEEM 13 SEER A/C W/ SINGLE STAGE VARIABLE SPEED FURNACE. **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new pl | 1405 S BROADWAY, BOULDER |
Mechanical | Mar 17, 2026 | 1 | Under $250,000 |
| 3 ton electric heat pump installation replacing an existing gas furnace. The gas line will be capped at the removed furnace location. Need t | 4400 BROOKFIELD DR, BOULDER |
Mechanical | Mar 17, 2026 | 1 | Under $250,000 |
| Sewer service line spot repair in the front yard of the property address. Total length of replacement is 8' long and up to 4' deep. New line | 4795 MOORHEAD AVE, BOULDER |
Plumbing | Mar 17, 2026 | 1 | Subscribers |
| 7/20/2026 scope update - night work with closure of Regent and associated detour **contractor must coordinate TCP with CU** **contractor mus | 1045 REGENT DR, BOULDER |
Other | Mar 17, 2026 | 1 | Under $250,000 |
| WO 108371189 - Alley closure for Xcel pole replacement - Installing 1 40' class 3 pole **contractor must notify impacted residents 72 hrs in | 518 DEWEY AVE, BOULDER |
Other | Mar 17, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 23 squares of dimensional shingles on a pitch represented as | 546 AZTEC DR, BOULDER |
Roofing and exterior | Mar 17, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 24 squares of dimensional shingles on a pitch represented as | 75 S 35TH ST, BOULDER |
Roofing and exterior | Mar 17, 2026 | 1 | Under $250,000 |
| VOID- 180 Days No Activity **All Structures must be permitted separately** Total tear-off & reroof of SFD, 33 squares of dimensional shingle | 4772 KELLOGG CIR, BOULDER |
Roofing and exterior | Mar 17, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, .139 squares of dimensional shingles on a pitch represented | 140 IROQUOIS DR, BOULDER |
Roofing and exterior | Mar 17, 2026 | 1 | Under $250,000 |
| Replace water heater - new on demand gas water heater (199MBH/0.98UEF) **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCE | 4425 LUDLOW ST, BOULDER |
Mechanical | Mar 17, 2026 | 1 | Under $250,000 |
| Remove and install 60K BTU 96% Furnace **Any electrical work required beyond a like-for-like replacement of equipment will require an electr | 960 SYCAMORE AVE B, BOULDER |
Mechanical | Mar 17, 2026 | 1 | Under $250,000 |
| Remove and install 60K BTU 96% Furnace **Any electrical work required beyond a like-for-like replacement of equipment will require an electr | 960 SYCAMORE AVE A, BOULDER |
Mechanical | Mar 17, 2026 | 1 | Under $250,000 |
| Replacing furnace with 100K BTU 97% furnace **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glued ve | 5391 MUIRFIELD CT, BOULDER |
Mechanical | Mar 17, 2026 | 1 | Under $250,000 |
| Replace existing 40-gallon natural-draft gas water heater with new 40-gallon standard gas unit, including new thermal expansion tank, drip p | 3735 BIRCHWOOD DR 31, BOULDER |
Mechanical | Mar 17, 2026 | 1 | Under $250,000 |
| Replacing Existing AES radio with newer 2.0 radio and switching to our Central station for Monitoring. Monitoring only, Existing Fire Alarm | 1326 PEARL ST, BOULDER |
Other | Mar 17, 2026 | 1 | Under $250,000 |
| Emergency Sewer spot repair all in private property installing a set of clean outs | 3530 19TH ST, BOULDER |
Plumbing | Mar 17, 2026 | 1 | Subscribers |
| Bore & place conduit 584' **speed limit must be reduced to 25 MPH when closing bike lane** **contractor must notify impacted complex and non | 3701 CANFIELD ST, BOULDER |
Other | Mar 17, 2026 | 1 | Under $250,000 |