| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 20 squares of dimensional shingles on a pitch represented as | 699 QUINCE CIR, BOULDER |
Roofing and exterior | Aug 5, 2026 | 1 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 34 squares of dimensional shingles on a pitch represented as | 776 N TERRACE CIR, BOULDER |
Roofing and exterior | Aug 5, 2026 | 1 | Under $250,000 |
| COMCAST PROPOSES TO PLACE AERIAL NEW STRAND 157 FT, AERIAL RISER DOWN 25 FT, DIRECTIONAL BORE 11 FT, AND TO TRENCH 3 FT TO INSTALL COAX CABL | 3300 TABLE MESA DR, BOULDER |
Other | Aug 5, 2026 | 1 | Under $250,000 |
| Replacement of 11 windows and 3 doors - like for like - meet current energy code requirements. Window replacements require rough and final s | 3985 CADDO PKWY, BOULDER |
Other | Aug 5, 2026 | 1 | Under $250,000 |
| Remove wood siding. Ensure solid nailing surface, installing house wrap and install James Hardie Lap siding system per manufacturer specific | 5375 TENINO AVE, BOULDER |
Roofing and exterior | Aug 5, 2026 | 1 | Under $250,000 |
| Replace three like for like windows | 1425 PATTON DR, BOULDER |
Roofing and exterior | Aug 5, 2026 | 1 | Under $250,000 |
| Adding new 8' and 4' tall chain link fence on new pickleball court facility at Tom Watson Park. | 6180 63RD ST, BOULDER |
Other | Aug 5, 2026 | 1 | $1 to $5 million |
| 2 utility pole replacements **contractor must notify impacted residents and businesses 72 hrs in advance** **flaggers must be stationed at b | 6180 63RD ST, BOULDER |
Other | Aug 5, 2026 | 1 | Under $250,000 |
| 40.079971, -105.206818 1 secondary equipment upgrade | 5605 N 63RD ST, BOULDER |
Other | Aug 5, 2026 | 1 | Under $250,000 |
| Utility pole replacement on East side of 63rd St **speed limit must be reduced to 25 MPH when closing bike lane; flaggers must be stationed | 5605 N 63RD ST, BOULDER |
Other | Aug 5, 2026 | 1 | Under $250,000 |
| 40-Gallon Natural Gas Water Heater Installation **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new plastic glue | 4415 LAGUNA PL 207, BOULDER |
Mechanical | Aug 5, 2026 | 1 | Under $250,000 |
| in-property wastewater service repair | 3625 CATALPA WAY, BOULDER |
Other | Aug 5, 2026 | 1 | Subscribers |
| No street parking and sidewalk closure for work being performed on private property. No construction in ROW. **contractor must notify impact | 2445 BLUFF ST, BOULDER |
Other | Aug 5, 2026 | 1 | Under $250,000 |
| Modification of an existing addressable fire alarm system to provide full occupant notification throughout the listed TI area. | 921 WALNUT ST, BOULDER |
Other | Aug 5, 2026 | 1 | Under $250,000 |
| 10' X 3' asphalt street cut to repair the sewer service tap in the asphalt street. **contractor must notify impacted residents and complexes | 4989 EISENHOWER DR, BOULDER |
Plumbing | Aug 5, 2026 | 2 | Under $250,000 |
| Conversion of existing Kitchen to Bedroom, to include enlargement of existing window opening for emergency egress compliance | 1045 14TH ST, BOULDER |
Major renovation | Aug 5, 2026 | 2 | Under $250,000 |
| floodplain permit associated with proposed improvements under ELE2026-00345 | 4157 19TH ST, BOULDER |
Major renovation | Aug 5, 2026 | 3 | Under $250,000 |
| New single zone mini split heat pump with associated electrical **PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All | 5249 QUAIL HOLLOW CT, BOULDER |
Mechanical | Aug 5, 2026 | 2 | Under $250,000 |
| **All Structures must be permitted separately** Total tear-off & reroof of SFD, 26 squares of dimensional shingles on a pitch represented as | 1795 LOMBARDY DR, BOULDER |
Roofing and exterior | Aug 5, 2026 | 2 | Under $250,000 |
| tree removal, traffic control | 640 S 42ND ST, BOULDER |
Other | Aug 5, 2026 | 2 | Subscribers |
| crane set up for tree removal | 745 UNIVERSITY AVE, BOULDER |
Other | Aug 5, 2026 | 2 | Under $250,000 |
| VOID- 180 Days no activity PV+ESS Installation System Size: 2.58kWDC, 2.09kWAC, 10kWhAC PV Modules: (6) Q.Tron BLK M-G2+ Batteries: (2) Enph | 2530 6TH ST, BOULDER |
Electrical | Aug 5, 2026 | 2 | Under $250,000 |
| VOID- 180 Days no activity PV+ESS Installation System Size 2.15kWDC, 1.75kWAC, 10kWhAC PV Modules: (5) Q.Tron BLK M-G2+ Batteries: (2) Enpha | 2532 6TH ST, BOULDER |
Electrical | Aug 5, 2026 | 2 | Under $250,000 |
| Addition of a deck (< 30") and landscaping to a single family detached dwelling. | 3114 7TH ST, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| Install 23 kW tilted photovoltaic system mounted on roof of single family detached dwelling - 12 panels - 2 ESS mounted on exterior | 1986 BEACON CT, BOULDER |
Electrical | Aug 4, 2026 | 1 | Under $250,000 |
| ***7/2/26 Revision to change existing garage to 204 sf bike storage*** Renovate 1228 sf main level with attached 204 sf wood frame structure | 2325 FOREST AVE, BOULDER |
Major renovation | Aug 4, 2026 | 1 | $250,000 to $1 million |
| JB0002627960 | COMCAST PROPOSES TO TIE IN TO EXISTING SPLICE LOCATION NEAR 1777 CONESTOGA ST INSIDE THE ROW OF THE CITY OF BOULDER, CO 80301 | 1777 CONESTOGA ST, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| COMCAST PROPOSES TO TIE IN TO EXISTING SPLICE LOCATION NEAR 2707 VALMONT RD INSIDE THE ROW OF THE CITY OF BOULDER, CO 80304. **contractor mu | 2707 VALMONT RD 306C, BOULDER |
Other | Aug 4, 2026 | 1 | Under $250,000 |
| Replacing like for like 22 windows u factor will be .27 or better Window replacements require rough and final siding inspections. Rough Insp | 5678 CASCADE PL, BOULDER |
Major renovation | Aug 4, 2026 | 1 | Under $250,000 |
| Tenant improvement in an existing sprinklered building with an existing addressable fire alarm system. | 6201 SPINE RD, BOULDER |
Major renovation | Aug 4, 2026 | 1 | Under $250,000 |